Loading...
HomeMy WebLinkAboutChange Order No 4&5 with Golis Construction for Settlers Park RestroomContract Administration G701 Change Order Distribution List: Owner Archilect Contractor Field Other PROJECT (Name and address): Settler's Park Restroom CHANGE ORDER NUMBER:.@ DATE: August 28 2003 TO CONTRACTOR (Name and address): Golis Construction PO Box 2559 Eagle 1083616 ARCHITECT'S PROJECT NUMBER: 02180 CONTRACT DATE:ADriI28 2003 CONTRACT FOR: Restroom Building THE CONTRACT IS CHANGED AS FOLLOWS: (tndude, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) C.O. #4 Revised ceiling finish - see attached letter from Golis Construction 8-10-03. C.O. #5 Apply a penetrant and two coats of water based epoxy 10 lower vaoor transmission in concrete slab. The original (Contract Sum) (GI,/aranleeà ~1axim1,Jm Price) was The net change by previously authorized Change Orders The (Contract Sum) (Guarantees MaJdml,/m Prke) prior to this Change Order was The (Contract Sum) (Guarantees MaJ(imum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of The new (Contract Sum) (Guarantees ~1aJ:iml,/m Prke) including this Change Order will be The Contract Time will be (increased) (decreases) (uRd'laRgeà) by four (1 ) days. The date of Substantial Completion as of the date of this Change Order therefore is Auausl 30 2003 $ 199664.00 $ 1.754.00 $201418.00 $2249.00 $203667.00 NOTE: This Change Order does not include changes in the Contrad Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Diredive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. ARCHITECT (Firm name) THE LAND GROUP INC. ADDRE S 1 SE G @ AlA Document G7C1 Change Order ElectronIC Format @ 20Cl The American Institute at Architects' www.ala.org . WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. To report copyright violations of AlA Contract Documents, e-mail The American Institute of Architects' iegai counsel. copyright@aia.org. This document was electronically produced with permission of the AlA and can be reproduced without violation until the dale of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: changeorder4.aia -. 8/28/2003. AlA license Number 111686S, which expires on 12131/1004. Electronic Format G701 - 2001 1 CONSTRUCTION MANAGERS. GENERAL CONTRACTORS GaLlS CONSTRUCTION. INc. August 12,2003 David Koga The Land Group, Inc. 128 South Eagle Road Eagle ID 83616 Project; Meridian Settler's Restroom Re; Change Order Request No.5 Dear David, Attached is a report 1Ì'om Epoxy Systems on the vapor transmission through the floor slab on the project. As explained in this report the vapor transmission is higher than the manufacturer recommends, or will warrant. We propose to apply a penetrant and two coats of water based epoxy to lower the vapor transmission through the slab to below the 3 pound threshold. Our price to do this work is $1849.00. There will be a one day impact to the critical path of the project; therefore we request a one day extension of the substantial completion date. Please issue a change order to our contract for this amount, or forward a waiver instructing us to proceed with the epoxy floor installation even with the higher vapor transmission rate. Sincerely, Golis Construction, Inc. /4ø¿p/ 4. Ao? Thomas B. Golis President Telephone 208-938-4202 . Fax 208-938-4204 . P,O. Box 2559 . Eagle, Idaho 83616 GaLlS CONSTRUCTION. INc. RECEiVED CONSTRUCTION MANAGERS. GENERAL CONTRACTORS AIJG 1 221m3 August 10, 2003 David Koga The Land Group, Inc. 128 South Eagle Road Eagle ID 83616 Project; Meridian Settler's Restroom Re: Change Order Request No.4 Dear David, Golis Construction Inc. proposes to install a 7/8" "hat channel" at the bottom chord of the wooden trusses and delete one of the two layers of 5/8" gypsum board. This was required to reduce the wooden top plate reveal by W'. Our lump sum price to accomplish this work is $400.00. There has been a one day impact to the critical path of the project; therefore we request a one day extension of the substantial completion date. Please issue a change order to our contract as detailed above and if you have any questions please call me. Sincerely, Golis Construction, Inc. ~. 17 ~¿,. Thomas B. Golis, CM President Telephone 208-938-4202 . Fax 208-938-4204 . P,O. Box 2559 . Eagle, Idaho 83616