Loading...
HomeMy WebLinkAboutProfessional Service Agreement with JUB Engineers to upgrade Sewer Master PlanJ-U-B ENGINEERS, Inc. AGREEMENT FOR PROFESSIONAL SERVICES J.U.B Project No.: 11950 THIS AGREEMENT entered into Ihis 2 day ot September. 2003, between Citv of Meridian hereinafter retefTed to as the "CLIENT' and J-Ll-B ENGINEERS, Inc.. an Idaho carparation of Boise, Idaho, hereinafter refefTed to as" J-U-B ". WITNESSETH: WHEREAS. the CLIENT intends to update 1998 Sewer Master Pian, hereinafter relefTed to as the PROJECT: NOW, THEREFORE, Ihe CLIENT and J.U.B in consideratlon of their mutual covenants herein agree in respect os sef forfh below. CLIENT INFORMATION AND RESPONSIBILITIES The CLIENT will provide to J-U.B all cntena and fuil information as 10 CLIENT's requirements far the Project. inciuding design objectives and constraints. space. capacity and performance requirements, flexibility and expandability, and any budgetary limitations; and lurnish copies 01 ail design and construction slandards which CLIENT wiil require to be included in the Drawings and Specifications. The CLIENT will lurnish to J.U.B, as required tar performance of J.U-B 's services. data prepared by or services of others. if available, including. without lirnitation, bonngs. probings and subsurface explarotlons, hydrographic surveys, labaratory tests and inspedons of samples, materiais and equipment; appropnote prolessional interpretations of ail of the loregoing; environmental assessment and impact statements, surveys of record, property descriptions; zoning, deed and other land use restrictions: and other special data ar consultations as may be available, oil of which J.U.B may use and rely upon in performing services under this Agreement. The CLIENT will afTange far access to and make ail provisions for J-U.B to enter upon public and private property as required far J-U.B 10 perform services under this Agreement. In addition. the CLiENTwililurnish to J.U.B: items listed in Section 2 of Attachment "A". SERVICES TO BE PERFORMED BY J.U.B J.U-BwillcomDlete those items listed in Section 3 of Attachment "A". SCHEDULE OF SERVICES TO BE PERFORMED J-U-B will perform said services as foilows: In a timelv manner. BASIS OF FEE AND BILLING SCHEDULE The CLiENTwili pay J.U-B far their services and reimbursable expenses as foilows: On a time and materiais basis with an estimated budaet of $23.401. For a breakdown of the fees, refer to Attachment "B". File Folder TIlle MERIDIAN - UDdate Sewer Master Pian Remarks: - The Notice to Proceed, by the Client. verbal or written. constitutes acceptance of this Agreement. THE TERMS AND CONDITIONS. INCLUDING RISK ALLOCATION. ON THE REVERSE SIDE ARE PART OF THIS AGREEMENT. THE CLIENT AGREES TO SAID TERMS AND CONDITIONS. IN WiTNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. CLIENT: J-U-B: ZIP CODE TITLE Projecl Manaç¡er Wh8e . J.U.B Corporate FIle Yellow. J.U-B Office File Pink - J.U-B Project File J-U-B -02 J-U-B ENGINEERS, Inc. TERMS AND CONDITIONS GENERAL J-U.B sholl provide tor CLIENT professionol engineering and/or iand surveying services In all phases ot the Project to which this Agreement applies. These services will include serving as ClIENT"s protessional engineering or land surveying representative for the Project, providing professional consultation and advice In accordance wifh generally accepted professional proctices tor the intended use of the Project and makes no other WARRANTY EITHER EXPRESSED OR IMPLIED. J.U-B shall not be responsible tor acts or omissions of any party involved In the services covered by this Agreement other than their own or for tailure of any contractor or subcontractor to construct any item in accordance with recommendations issued by J.U.B. J.U-B has not been retained to supervise. direct or have control over contractor)s! work nor shall J-U-B have authority over or responsibility ¡~~i~:n7';;,ar~é ":~kO~¡, ~';,~7r~~~,;,ìst';,~~~~~~~ ~~~~~;';,1~';,Sn~~~?~N;JuT~i,::"o~~~ :;'~~¡;;'~n~~.;,~"r'J~U¡~¡i~;~~r~r~g~~:~n~gd~ ~~g;g;;;; ~g~~\¡~~:~nf~o~~~~gc~~rg~~~~~~~~J ~~~a~~~oerr::'~~~o~~:iIi;?b"r'co~~"c~~:~fi'láii~;~'rO ~';:iS~e~t~¿rp~~~~n:~~r ~~/;~a"~~~~~c':: ~~~ the Contract Documents. In soils investigation work and In determining subsurface conditions for the Project, the characteristics may vary greaNy between successive test points and somple Intervols. J.U.B will coordinate this work in accordance with generally accepted practice of the protessional services being provided and makes no other WARRANTIES EXPRESSED OR IMPLIED, or as to the protessional adviceturnishedby others. Resetting of survey and/or construction stakes shali constitute extra work and shall be poid for on a time ond material basis in addition to ony other payment provided in this Agreement. OPINIONS Of COST Since J-U-B has no control over the cost ot labor. materials. eguipment or services turnished by others, or over the Contractor!s!, methods at determining prices. or over competiffve bidding or market conditions. J-U-B's opinions of probable Total Project Costs and Construction Costs provided tor herein are to be made on the basis ot J.U-B's experience and quolffications and represent J-U-B's best judgmenl as an experienced and quolified protessional engineer. familiar with the consfruction industry: but J-U-B cannot and does not guarantee that proposais. bids or actual Totai Project or Construction Costs will not vary from opinions of probable cost prepared by J.U-8. if the CLIENT wishes ~;gj~~{ t~s¡;'~~~~~ea~~n~f~~t~~J'E'6sf: ;if~~~~~~i~Jgf1~¡' ~~II~rgli;~~~ 'b~~~'¡,Y ~OJ~~~IT~~e~~';:s?à~;~~"J,~âfi;o~~i~~~:;'~;~ntâ ;;'~3i~,t~~ such by the CLIENT. REUSE Of DOCUMENTS All documents and magnetic media including Drawings and Specifications prepared Of fumished by J-U-8 pursuant to fhis Agreement are instruments of service in respect of the Project and J.U.B shall retain an ownership and property interest therein whether or not the Project Is completed. Any reuse without written verification or adaptation by J-U.B tor the specific purpose intended will be af CLIENT's sole risk and ~;\;;'~6~~~¡i~r c;:,;~~~~ 1~~~~~<;':.0 J-U-B and CLIENT shall indemnity and hold harmless J-U.8 trom all claims, damages, losses and expenses CONTROLLING LAW This Agreement is to be governed by the law ot the State of Idaho. principal place of business at J.U-B. SUCCESSORS AND ASSIGNS CLIENT and J-U-8 each is hereby bound and the partners. successors, executors, administrators and legal representatives of CLIENT and J-U-8 are hereby bound to the other party to this Agreement and to the partners, successors. executors, administrators and legal represenlatives of such other party. in respect of all covenants, agreements and obligations of Ihis Agreement. and N~t~~We~"o~';; :~~~~:¡¡,~~:,n~~~~~~[e~op~:~~~1 tl; ~~~; Aa;,~~¡¡'~~to~~'b~e~; ¡~~~~I~~~â';;;~I~:~¿'~~~~~t06~~l¡~~r a~~Et~_~n~n~~~i for the benefit of any other party. TIMES OF PAYMENTS J-U-B shail submit monfhly statements for services rendered and tor Reimbursable Expenses incurred. CLIENT shall make prompt monthly payments. It CLIENT tails to make any payment due J-U-8 far services and expenses within ten (lO) days atter receipt of J-U-8's statement theretor, the amounts due J.U.B wiil be increased at the rate ot 1 % per month trom said tenth day, and in addition, J-U-B may. atter giving ten days' written notice to CLIENT. suspend services under this Agreement until J.U.8 has been paid in fuil ail amounts due tor services. expenses and charges. TERMINATION The obligation to provide further services under this Agreement may be terminated by either party upon thirty days' written nofice in the event of substantial tailure by the other party to pertorm in accordance with the terms hereof through no fault ot the terminafing party. If this Agreement is terminated by either party, J.U-8 will be paid tor services rendered and for Reimbursable Expenses incurred to the date of such terminafion plus an allowance tor demobilizafion costs as determined by J.U.B. RISK ALLOCATION The CLIENT is aware at the risks, rewards, and benefits at the project and J.U.8's total fee tor services. The risks are hereby allocated such that the CLIENT agrees that, to the fuilest exfent permitted by law. J-U-8's total liability to the CLIENT for all injuries, claims, expenses, damages or ciaims expenses arising out ot this a~eement trom any cause, shall not exceed fiftyJ'cercent of the amount of J.U-8's insurance covering such ~~?i~ :g~ It':'J~e~e~l~g~e~~, ~~~;~ o~I~¡¡¡n~.r S~~¡'iI~~~~~~~ ~~;,ec~~í Ii',¡s ~~~:em~~tOf this Agreement Such causes include, but are not HAZARDOUS WASTE AND ASBESTOS In considerafion ot the unavailability of professionalliabiiity insurance for services involving or related to hazardous waste elements of this Agreement, or for the removal or encapsulation at asbestos. it is furfher agreed that the CLIENT shail indemnify and hold harmless J-U-8 and their consultants, agents ond employees from ond against all claims, damages, losses and expenses direct and indirect, or consequential ~c;,n;,c;,~~~~"o~~~I~~ t~~t,.Dg¡ i~itf8-~~ :~fa~~ a~~~~~n8!B ~~g~~oa~~z~~uo~;~~~~t~rna~b~~~~~?i~i;.;',sts, arising out ot or resulting trom MEDIATION BEfORE LITIGATION No action ar lawsuit shall commence nor recourse to a judicial forum be made (hereinotter 'litigatlon'") until CLIENT, J.U-8. and/or other Parties ot Real Interest have commenced. participated in and concluded nonbinding mediation. pursuant to the rules at mediation. LEGAL fEES In the event of any action brought by either party against the other to entorce any at the obligalions hereunder or arising out ot any dispule conceming the terms and condilions hereby created. the iosing party shall poy the prevaiiing party such reasonable amounts for fees, costs and expenses. including attorney's tees as may be set by the Court. EXTENT Of AGREEMENT repr~~~n~~¡~~~~rn ~~~~:;'~~¡;, ~fh:rn~ftt~~~r'~¡~~r~h"ed A~?~~:;'~~7¡"~~~~'::'m~~d~g ~N:1y a~? ~g:n ~n"s~~~~s~g~~g~f~~~~~f¿~oii~~à J-U-B. J-V-B -02 J-U.B ENGINEERS, Inc. Project 11950, Attachment A' -- "'" ...U~ CITY OF MERIDIAN - 2003 SEWER MODEL UPDATE J.U-B Project No. 11950, ATTACHMENT "A" AUGUST 2003 SECTION 1 - PROJECT UNDERSTANDING The City intends to update their 1998 sewer master plan model(ultimate system) to reflect changes in land use, service area, constructed trunk system, and future trunk system. In addition to the updating the City's master plan model, a brief summary update report will be prepared. SECTION 2 - ITEMS PROVIDED BY THE CLIENT The City shall provide J-U-ß the following items at no cost: D Provide updated copy of existing sewer model. D Provide COMPASS base mapping in the study area. D Provide digital copies of preliminary plans, final plats, concept plans, record drawings, and any other pertinent available drawings that may affect future trunkline routing. D Provide a copy of the comprehensive plan. SECTION 3 . SERVICES TO BE PERFORMED BY J-U-B J.U.ß shall furnish data and services specifically limited to the following for the 2003 Sewer Model Update Project: D Create base mapping to include COMPASS aerial topographic mapping. D Perform spot topographic survey at critical drain crossings and pipe inverts. D System: Merge Master Plan with current existing system model. Modify model for Preliminary Plats. Revise ground and drain crossing elevations in Master Plan to reflect COMPASS ground surface elevations, D Service Area: Check and modify service area for merged system. Modify service area where preliminary plats are available. Modify to reflect changes in area of impact. 0 land Use: Review with the City's adopted Comprehensive Plan. Meet with the City and modify for service areas. Modify to reflect changes in area of impact. D Perform minor detail analysis for North Slough and McDermott Lift Station areas. D Run updated Model and troubleshoot. D Submit four (4) copies of a draft Master Plan update report. D Meet with the City to review model results. D Finalize and submit six copies (6) of Master Plan update, F:\pM\phk\119S0.meridian sewer master plan update\119S0.pm\wntract-billing\attachA.doc City of Merid/an -2003 Sewer Master Plan Update Page-1 CITY OF MERIDIAN 2003 SEWER MASTER PLAN UPDATE PROJECT 11950, ATTACHMENT "8" CITY OF MERIDIAN - 2003 SEWER MODEL UPDATE PRELIMINARY WORK-DAY. ESTIMATE TASK .'. ....',)i.. .'. .i'," Prindpal Project " Land. Survey Drafts- Survey GPS Task Manager Engineer ;EIT.... Surv",yor .Tech man Clerical Crew Equip Subtotal Approx. Employee Hourly Pay Rate $36 $30 $20 $27 $20 $18 $15 $35 $80 Cost.. .... Project Kickoff 0.25 0.25 0.25 $550 Develop 8ase Mapping . 0.25 3 $1,510 Review Existing and Master Plan Models 0.25 0.5 $448 System - Merge Master Plan Drawing 0.25 0,5 2 $1,638 System - Modify Trunks through Pre.Plats 1.5 $768 System - Update Ground Elevations, a: Drain Crossings 0.25 2 0.25 0.25 1 0.5 $2,733 Service Area - Check 0.25 1.5 $960 Service Area - Modify for Merged Lines 2 $1,024 Service Area - Modify for Pre-Plats 0.25 1 $704 Service Area - Connect 0.5 $256 land Use. Modify to Match Service Areas 1 $512 land Use. Modify to Match Comp Plan 0.25 0.5 3 $2,150 land Use. Modify for Pre-Plats 1 $512 Run, Troubleshoot and Modify Model 0.5 1 2.5 $2,509 QC Check on Model 0-5 0.25 $512 Write Draft Master Plan Update Report 1 0.25 3 2 1 $3,955 Meet wi City and Review 0.5 0.5 0.5 $1,101 Finalize Master Plan Update Report 0.25 2 1 1 $2,099 ....., .... ......, .. '., Total I~3 - 4.5 . 24.75 ... '0.25 0.25 6 2'.. 1 $23,401 IIBoi"m."P'bU,\Pcoj"ctM."g",\PHK\11950-m"idiDO 'ewe, m."D, pIDO\1195o-PMlCool,.'I-BilUoglM-D EStim"D - MDrtdiDO Model UpdDle 20O3.XlS 8/26/2003 Meridian City Council Meeting September 2. 2003 Page2of51 MOTION CARRIED: ALL AYES Item 3. F. G. H. I. Consent Agenda: A. Approve minutes of August 19, 2003 Pre-Council Meeting: B. Approve minutes of August 26, 2003 Pre-Council Meeting: C. Findings of Fact and Conclusions of Law to Amend Conditions of Approval: FP 03-038 Request to amend conditions of approval on the Final Plat for Packard Acres No.2 by the City of Meridian - east of North Wingate Lane and south of East Ustick Road: D. Development Agreement: AZ 03-010 Request for annexation and zoning of 39.15 acres from RUT to R-8 (PO) zones for proposed Trailwav Park Subdivision by Hillview Development Corporation - east of North Meridian Road and south of East Blue Heron Lane: E. Sewer and Water Main Easements for Meridian School District Bus Facility: Sewer and Water Main Easements for Cobre Basin Subdivision No.1: Change Order No.1 for 2003 Sewer Cleaning - C-More Pipe: Agreement for Professional Services for Sewer Master Plan Update - JUB Engineers: Approve Bills: Corrie: Next we have the Consent Agenda. Bird: Mr. Mayor? Corrie: Mr. Bird. Bird: I would move that we approve the Consent Agenda as published and for the Mayor to sign and the Clerk attest on all proper papers. McCandless: Second. Meridian City Council Meeling September 2. 2003 Page3al51 Corrie: Motion has been made and seconded to approve the Consent Agenda, A through I. Any further discussion? Hearing none, roll call vote, Mr. Berg. Roll call: McCandless, aye; Nary, aye; de Weerd, aye; Bird, aye. Corrie: All ayes. Motion carried. MOTION CARRIED: ALL AYES Item 4. Department Reports: Corrie: The next is Department Reports. Is Kenny here tonight? I just wanted to make sure that everybody is aware that the auditorium at the middle school. They want to have a signed consent for two hours for October 9, 2003, for the Fire Department academy graduation and everything was in order here, I believe, Mr. Nichols, that we just need to have me sign it to allow them to have the academy graduation there. I don't -- unless you have any objections to the signing. Bird: No. Corrie: All right. Thank you. Nichols: Mr. Mayor? Corrie: Yes. Nichols: Mr. Mayor, Members of the Council, this is a standard form agreemenl the school district requires of every entity that uses their facility. It covers insurance, janitorial, and those sorts of things and as often as we might use those facilities, it might be, you know, a continuing type approval to do that, as long as it's nothing out of the ordinary. I guess we might ask them -- of course, they no longer use this facility and I don't think we have asked them to do it before when they have used this facility for their meetings, so -- but they required it. Corrie: Anything further on that, then? Okay. I don't know about Kenny, but thank you. Item 5. (Items Moved from Consent Agenda) Corrie: Number 5 is items moved from the Consent Agenda. We haven't any. Item 6. Ordinance No. AZ 03-010 Request for annexation and zoning of 39.15 acres from RUT to R-8 (PD) zones for proposed Trailwav Park Subdivision by Hillview Development Corporation - east of North Meridian Road and south of East Blue Heron Lane: