Loading...
HomeMy WebLinkAboutTask Order No. 2 With Carollo Engineerins for WWTP Facility Update TASK ORDER NO.2 CITY OF MERIDIAN (OWNER) AND CAROLLO ENGINEERS, A PROFESSIONAL CORPORATION (ENGINEER) This Task Order is issued by the OWNER and accepted by the ENGINEER pursuant to the mutual promises, covenants and conditions in the Agreement between the above named parties dated the 23rd day of July, 2002, in connection with: The Wastewater Treatment Plant Facility Plan Update Project (Project). PURPOSE The ENGINEER's scope of services, time of completion and compensation shall be as set forth herein. Services shall generally be described as engineering services for design of expansion of the headworks screening and influent pump station for the OWNER's wastewater treatment plant. ENGINEER'S SERVICES Services shall be generally described as those necessary for the Headworks Project Design. TASK 1 - PROJECT MANAGEMENT ENGINEER will provide the following project management services for the duration of the project: 1.1 - Work Plan. Establish a project work plan including budget and schedule based upon this Task Order No.2. 1.2 - Management. Manage the efforts of the project team members and subconsultants, assign manpower, delegate responsibilities, review work progress, and communicate with the City. 1.3 - Project Meetings. Attend project meetings with the City. Our proposed schedule includes the following meetings: 0 0 Two meetings during the design phase. Attendance at the pre-bid walk through. TASK 2 - DESIGN This task includes the preparation of plans and specifications, suitable for bidding by contractors. 2.1 - Plans and Specifications. ENGINEER will prepare a set of civil, mechanical, -1- structural, electrical and instrumentation design drawings and technicai specifications suitable for competitive bidding by contractors. The ENGINEER's front-end documents will be used in the specifications. 2.2 - Submittals. Preparation of the plans and specifications will include the submittal of 50 percent and 90 percent compiete documents for review by the City. Ninety percent review plans will also be submitted to State DEQ for review. One hundred percent complete plans and specifications incorporating final review comments will be submitted to the City. ENGINEER will be responsible for printing and issuing plans and specifications to prospective bidders. 2.3 - Engineer's Estimate of Construction Costs. ENGINEER will prepare an opinion of the estimated construction cost at the 100 percent completion stage of the design project. TASK 3 - SERVICES DURING BIDDING AND CONSTRUCTION This task includes the engineer's services during bidding. 3.1 - Services During Bidding. ENG INEER will assist during the project bidding phase by: a. b. c. d. Attending the pre-bid conference. Responding to bidder's questions. Preparing addenda, if required. Reviewing the technical portion of the bids and recommending a contract award. PROJECT DELIVERABLES The following deliverables will be prepared as part of the project: C. A. Fifty percent design plans and technical specifications (3 copies to the City). B. Ninety percent design plans and technical specifications (3 copies to the City, 2 copies to the State DEQ). One hundred percent design plans and specifications (5 copies to the City, 20 copies to contractors). OPTIONAL SERVICES 0-1.0 - Geotechnical Report. It is anticipated that a geotechnical report will be required for the project. This report could be completed under separate contract between the City and a local geotechnical firm. If requested, these services could be added to this contract. An estimated cost for geotechnical services is approximately $4,000. This cost is not included in this contract at this time. -2- 0-2.0 - Site Survey. It is anticipated that a site survey will be required for the project. This report could be completed under separate contract between the City and a local surveying firm. If requested, these services could be added to this contract. An estimated cost for a site survey is approximately $2,000. This cost is not included in this contract at this time. SERVICES PROVIDED BY OWNER OWNER will provide necessary information from previous projects and from plant operating data for ENGINEER to complete Task 2, above. OWNER will also secure all necessary permits and approvals for construction of the project from state and local agencies. TIME OF COMPLETION The target project milestones for completion are: Fifty Percent Contract Documents Ninety Percent Contract Documents Complete Contract Documents September 5, 2003 October 3, 2003 October 28, 2003 The ENGINEER will perform its services in a manner that will permit the OWNER to meet this schedule unless delayed due to a cause beyond the ENGINEER's control at which time the ENGINEER's compensation may be subject to an increase. COMPENSATION OWNER shall pay ENGINEER on an hourly basis in accordance with the attached engineering cost estimate (Exhibit A). Subconsultants shall be invoiced at ENGINEER's cost plus ten (10) percent. All other direct costs shall be invoiced at the actual cost. ENGINEER's total compensation for the Scope of Services identified in this Task order shall not exceed the amount of seventy nine thousand dollars ($78,861), without additional authorization from OWNER. The ENGINEER shall submit monthly statements to the OWNER based on the ENGINEER's labor and expenses accrued at the time of billing. OWNER shall make monthly payments in response to ENGINEER's statement. -3- EFFECTIVE DATE This Task Order No.-.L is effective as of the ?.t.dday of ~ c\-~.b...., 20~. IN WITNESS WHEREOF, duly authorized representatives of the ENGINEER and of the OWNER have executed this Task Order No. -.L evidencing its issuance by OWNER and acceptance by ENGINEER. By: Cc. AAfro...-1 .:0-/11../0"$ -4- EXHIBIT A ESTIMATE OF ENGINEERING COSTS CITY OF MERIDIAN HEADWORKS PROJECT TASK DESCRIPTION h ~j' :¡ . -E-< ß S l¡:: Task I . Project Mana.ement 1.1 Work Plan 1.2 Management 1.3 Project Meetings Task 2 - Desi.n 2.1 Plans and Specifications 2.2 Submittals 2.3 Cost Estimate Task 3 - Senices Durin. Biddjn. 3.1 Servi=ÐuringBidding TOTALS Personnel Classification ESNI I $137 I 1 4 10 44 2 2 8 71 ~ ~ H l~ 2 2 12 103 8 8 20 155 Esn LABOR MANHOURS CaroRo En.ineers 91 ESlYI I $158 I ci1 ~ ~ 89 2 :¡o b ci1 ~ H- .to ß ¡¡¡ ~ ë " i£: ETNI ~ ~ i ft Q 192 8 200 C"" $9,727 $13,330 $14,378 $14,580 $3,014 $19,000 $2,832 $95 I $59 I 6 152 22 Direct Subcons Costs j ! c'i 2 42 $ 2.000 $ $ $ 4 162 22 Opt. 4 48 EsnIT ¡g~L Totals by Decipline $86 ESIY) ESNI $90 I $137 I TOTAL ~ '" ~ U . . E-< s s s 309 720 3,060 68.360 962 962 $ 4,488 $ 78,861 ... ....... ...