HomeMy WebLinkAboutAuthorization for Additional Services with JUB Engineers for Septage Receiving FacilityJ-U-B ENGINEERS, Inc.
250 S. Beechwood Avenue, Suite 201 • Boise, Idaho 83709-0944 ~ Telephone (208) 376-7330 • FAX (208) 323-9336
AUTHORIZATION FOR ADDITIONAL SERVICES
CLIENT: City of Meridian, Dept. of Public Works
PROJECT NAME: Septage Receiving Facility
J-U-B Project Number: 11624-07
The following additional items of work on the project referenced above have been or will be
provided by J-U-B ENGINEERS, Inc. These additional services are a supplement to the
scope of services contained in J-U-B's existing Agreement for Engineering Services for this
project, dated WWTP-Trunk Sewer Extension, December 7, 1999.
Additional Services: Complete field survey, design and prepare construction plans
for the septage receiving facility, related site piping and sitework at the WWTP. Provide
construction staking and construction assistance as needed basis to support City staff.
J-U-B ENGINEERS, Inc. was verbally authorized to provide these services by:
Brad Watson, P.E. -Asst. City Engineer August, 2000
Name Date
Unless otherwise noted below, J-U-B ENGINEERS, Inc. will provide these additional services
on a time and materials basis, using the Firm's standard billing rates, or if applicable, the
billing rates established in the initial Agreement for Engineering Services.
Other Basis for Payment: Payment will be on a time and material basis with budgets of:
1) Topographic survey and control: $ 2.724.59; 2) Design: $2,782.07; 3) Coordination
$279.30: 4) Construction staking and assistance $500.
Dated this 21st day of November 2000.
City of Meridian
Print Type Client Name
By:
Client Representative Signature
J-U-B ENGINEERS, Inc.
By:
Project present Signature
Robert D. Corrie, Mayor Phillip H. Krichbaum, P.E., Proiect Mgr.
Print or Type Name and Title Print or Type Name and Title
Council Approved 11/21/00
Attest
William G. Berg, Jr., City Clerk
J-U-B ENGINEERS, Inc.
CITY OF MERIDIAN -
SEPTAGE RECEIVING FACILITY
LABOR CODE EMPLOYEE W/E DESCRIPTION HRS CHARGE
1. TOPOGRAPHIC SURVEY AND CONTROL
TECHNICIAN .
.
WALLACE .....:.....:....,.............. ...
KEVIN P. ...... ............... ... ......:..............................................
8/26/OOFLD-DAT-MERIDIAN WWTP .............
2.
TECHNICIAN t WALLACE KEVIN P 9/9/00 FLD DAT MERIDIAN W WTP _ 0
TECHNICIAN
............................................... ::JUDGE, THOMAS A.
......:....................................................:...... 8/5/OOREVIEW TOPO DATA - WWTP
....................................................................................... 1.
:
LICENSED SURVEYOR
GNIPP, JR., JOHN P. E ...................
8/26/OOEPROBLEM SHOOT FIELD - MER T.P. ................
2.
LICENSED SURVEYOR iGNIPP, JR, JOHN P. 8/26/OOEPROCESS & CREATEDWG 2.
LICENSED SURVEYOR •':HODGE, RONALD M. 8/26/00: COORD / RV W -MERIDIAN 1.
LICENSED SURVEYOR iKOERNER, LARRY H. 8/26/000OORD W/ PHK & CREW - MER WWTP 4.
SURVEYOR WALLACE,KEVINP. ~ 8/26/OOTOPO-MERIDIANWWTP 15.
SURVEYOR aKRUPP, TRAVIS L. 8/26/00; CONTROLMERIDIAN W WTP 14.
SURVEYOR
............................................... HAYDEN, TIMOTHY R
......
.....................................................:...... 8/26/00; TOPO-MERIDIAN W WTP
.................
........................................................................................ 6.
.:................
PHONE/COPIES/OTHER .
;TIMELESS PHOTO, INC. :
8/5/00:8/3/00
MILEAGE KRICHBAUlvI; PH¢Z.IP H. 8/26/00: 8/22 -SITE COORD -SURVEY
MILEAGE i WALLACE, KEVIN ~ 8/26/00: 8/22 - MERIDIAN W WTP - 51.0 MILES @ 0.42 i
MILEAGE ; WALLACE, KEVIN 8/26/00: 8/23 - MERIDIAN W WTP - 45.0 MILES @ 0.42
i WALLACE, KEVIN 8/26/00: 8/25 - MERIDIAN W WTP - 31.0 MILES @ 0.42
......... ~ .....................................................I .......................~........................................................................................~.TOTaL .. ~.
2. DESIGN .................... .........~....................................................~..... ..................~................
.
.
...
.
....
.
..
PROJECT ENGINEER ;ANDERSON, GEORGE M. .
.
.
..
...
..................
....
10/21/00: STRUCTURAL DESIGN
PROJECT ENGINEER ;ANDERSON, GEORGE M. 10/28/00: STRUCTURAL DESIGN
PROJECT ENGINEER zKRICHBAUM, PHQ LIP H. 8/26/00: SURVEY COORD, SITE VISTf
PROJECT ENGINEER ~:'KRICHBAUM, PHILLIP H. 9/23/OOENB-PRELIM LAYOUT, STTE PLAN
PROJECT ENGINEER KRICHBAUM, PHQ.LIP H. 9/23/OO~PRELIM LAYOUT, SITE PLAN
PROJECT ENGINEER KRICHBAUM; PHR 7 TP H. 10/21/OO~FINAL SEPTAGE PLANS
PROJECT ENGINEER ~KRICHBAUM, PHQ_LIP H. 10/28/OOFINAL PLANS
PROJECT ENGINEER #KRICHBAUM, PHR.l.lr H. 11/4/00; SEPTAGE REVIEW
PROJECT ENGINEER KRICHBAUM, PHR.r.m H 11/18/OOFINAL COST ESTIMATE
PROJECT ENGINEER KRICHBAUM, PHR 77P H. 11/11/OOiFINAL PLANS & DIST TO CITY
DRAFTER-CAD
.
,
»
,~~ %WISELY, LARRY D.
»»
»».». 9/16/OOiTOPOG-MERIDIAN TREATMENT
~
'
.
,
»
,DRAFTER-CAD ....
....
.
. WISELY, LARRY D.
...»,»»» ,, ,«.,, 9/23/00?REV
TOPOG-MERIDIAN
.,
..
..
........
DRAFTER-CAD ::LEITH, REYNARIO 10/28/OOEDRAFTINGPLANS
3 COORDINATION ~ ........ ......... ......... ~..... .........
PROJECT ENGINEER
................................................ . KRICHBAUlv1, PHR 7.TP H. 8/5/00, SEPTAGE STATION MTG
....;:..................................
......................
......
..
..
.
..
..................
.
PROJECT ENGINEER ..
.
......
....................
...
.
...
.
KRICHBAUM, PHR 77P H. 8/19/00; SEPTAGE STATION ADMIN
PROJECT ENGINEER ;KRICHBAUM, PHQ.LIP H. 10/7/OOEMEET WITH CITY
.•. ,150.181
30 041
1
901.05
585.76
236.99
10.73
.~~2.52
21.:42
18.90
1.30: 120.42
.........., ....: 3.60:
.., ...,,,..
... 333.47
.-...,.....-...
2.5 0 2 3 2.7 5
0.50; 46.55
I; 6.50; 605:15
3.50:
...................:....................:... 325.85
.......................
0.50:
........ ........ .....,.......
.,-. 46.55
...., ., ., ......
0.5 0 4 6.5 5
1.00.
.................................
... 93.10
.............
1.SOi 139.65
1.00;
....._.. ....:::...
.... 71.23
.,,.».......
.................... 4.00;
.
....
........... 2 8 4.92
......
... ,..
: .
12.50: .
.
.43 5.8 8
...................
~ ...................
TOTALS ... ......................
52.782.07
.........................1:~~~.................. 93:10
0.50; 46.55
~ ~ ~ ~ PROJECT TOTAL TO DATE 11/11/00 ~ ~ $5,785.96 ~