Loading...
HomeMy WebLinkAboutAuthorization for Additional Services with JUB Engineers for Septage Receiving FacilityJ-U-B ENGINEERS, Inc. 250 S. Beechwood Avenue, Suite 201 • Boise, Idaho 83709-0944 ~ Telephone (208) 376-7330 • FAX (208) 323-9336 AUTHORIZATION FOR ADDITIONAL SERVICES CLIENT: City of Meridian, Dept. of Public Works PROJECT NAME: Septage Receiving Facility J-U-B Project Number: 11624-07 The following additional items of work on the project referenced above have been or will be provided by J-U-B ENGINEERS, Inc. These additional services are a supplement to the scope of services contained in J-U-B's existing Agreement for Engineering Services for this project, dated WWTP-Trunk Sewer Extension, December 7, 1999. Additional Services: Complete field survey, design and prepare construction plans for the septage receiving facility, related site piping and sitework at the WWTP. Provide construction staking and construction assistance as needed basis to support City staff. J-U-B ENGINEERS, Inc. was verbally authorized to provide these services by: Brad Watson, P.E. -Asst. City Engineer August, 2000 Name Date Unless otherwise noted below, J-U-B ENGINEERS, Inc. will provide these additional services on a time and materials basis, using the Firm's standard billing rates, or if applicable, the billing rates established in the initial Agreement for Engineering Services. Other Basis for Payment: Payment will be on a time and material basis with budgets of: 1) Topographic survey and control: $ 2.724.59; 2) Design: $2,782.07; 3) Coordination $279.30: 4) Construction staking and assistance $500. Dated this 21st day of November 2000. City of Meridian Print Type Client Name By: Client Representative Signature J-U-B ENGINEERS, Inc. By: Project present Signature Robert D. Corrie, Mayor Phillip H. Krichbaum, P.E., Proiect Mgr. Print or Type Name and Title Print or Type Name and Title Council Approved 11/21/00 Attest William G. Berg, Jr., City Clerk J-U-B ENGINEERS, Inc. CITY OF MERIDIAN - SEPTAGE RECEIVING FACILITY LABOR CODE EMPLOYEE W/E DESCRIPTION HRS CHARGE 1. TOPOGRAPHIC SURVEY AND CONTROL TECHNICIAN . . WALLACE .....:.....:....,.............. ... KEVIN P. ...... ............... ... ......:.............................................. 8/26/OOFLD-DAT-MERIDIAN WWTP ............. 2. TECHNICIAN t WALLACE KEVIN P 9/9/00 FLD DAT MERIDIAN W WTP _ 0 TECHNICIAN ............................................... ::JUDGE, THOMAS A. ......:....................................................:...... 8/5/OOREVIEW TOPO DATA - WWTP ....................................................................................... 1. : LICENSED SURVEYOR GNIPP, JR., JOHN P. E ................... 8/26/OOEPROBLEM SHOOT FIELD - MER T.P. ................ 2. LICENSED SURVEYOR iGNIPP, JR, JOHN P. 8/26/OOEPROCESS & CREATEDWG 2. LICENSED SURVEYOR •':HODGE, RONALD M. 8/26/00: COORD / RV W -MERIDIAN 1. LICENSED SURVEYOR iKOERNER, LARRY H. 8/26/000OORD W/ PHK & CREW - MER WWTP 4. SURVEYOR WALLACE,KEVINP. ~ 8/26/OOTOPO-MERIDIANWWTP 15. SURVEYOR aKRUPP, TRAVIS L. 8/26/00; CONTROLMERIDIAN W WTP 14. SURVEYOR ............................................... HAYDEN, TIMOTHY R ...... .....................................................:...... 8/26/00; TOPO-MERIDIAN W WTP ................. ........................................................................................ 6. .:................ PHONE/COPIES/OTHER . ;TIMELESS PHOTO, INC. : 8/5/00:8/3/00 MILEAGE KRICHBAUlvI; PH¢Z.IP H. 8/26/00: 8/22 -SITE COORD -SURVEY MILEAGE i WALLACE, KEVIN ~ 8/26/00: 8/22 - MERIDIAN W WTP - 51.0 MILES @ 0.42 i MILEAGE ; WALLACE, KEVIN 8/26/00: 8/23 - MERIDIAN W WTP - 45.0 MILES @ 0.42 i WALLACE, KEVIN 8/26/00: 8/25 - MERIDIAN W WTP - 31.0 MILES @ 0.42 ......... ~ .....................................................I .......................~........................................................................................~.TOTaL .. ~. 2. DESIGN .................... .........~....................................................~..... ..................~................ . . ... . .... . .. PROJECT ENGINEER ;ANDERSON, GEORGE M. . . . .. ... .................. .... 10/21/00: STRUCTURAL DESIGN PROJECT ENGINEER ;ANDERSON, GEORGE M. 10/28/00: STRUCTURAL DESIGN PROJECT ENGINEER zKRICHBAUM, PHQ LIP H. 8/26/00: SURVEY COORD, SITE VISTf PROJECT ENGINEER ~:'KRICHBAUM, PHILLIP H. 9/23/OOENB-PRELIM LAYOUT, STTE PLAN PROJECT ENGINEER KRICHBAUM, PHQ.LIP H. 9/23/OO~PRELIM LAYOUT, SITE PLAN PROJECT ENGINEER KRICHBAUM; PHR 7 TP H. 10/21/OO~FINAL SEPTAGE PLANS PROJECT ENGINEER ~KRICHBAUM, PHQ_LIP H. 10/28/OOFINAL PLANS PROJECT ENGINEER #KRICHBAUM, PHR.l.lr H. 11/4/00; SEPTAGE REVIEW PROJECT ENGINEER KRICHBAUM, PHR.r.m H 11/18/OOFINAL COST ESTIMATE PROJECT ENGINEER KRICHBAUM, PHR 77P H. 11/11/OOiFINAL PLANS & DIST TO CITY DRAFTER-CAD . , » ,~~ %WISELY, LARRY D. »» »».». 9/16/OOiTOPOG-MERIDIAN TREATMENT ~ ' . , » ,DRAFTER-CAD .... .... . . WISELY, LARRY D. ...»,»»» ,, ,«.,, 9/23/00?REV TOPOG-MERIDIAN ., .. .. ........ DRAFTER-CAD ::LEITH, REYNARIO 10/28/OOEDRAFTINGPLANS 3 COORDINATION ~ ........ ......... ......... ~..... ......... PROJECT ENGINEER ................................................ . KRICHBAUlv1, PHR 7.TP H. 8/5/00, SEPTAGE STATION MTG ....;:.................................. ...................... ...... .. .. . .. .................. . PROJECT ENGINEER .. . ...... .................... ... . ... . KRICHBAUM, PHR 77P H. 8/19/00; SEPTAGE STATION ADMIN PROJECT ENGINEER ;KRICHBAUM, PHQ.LIP H. 10/7/OOEMEET WITH CITY .•. ,150.181 30 041 1 901.05 585.76 236.99 10.73 .~~2.52 21.:42 18.90 1.30: 120.42 .........., ....: 3.60: .., ...,,,.. ... 333.47 .-...,.....-... 2.5 0 2 3 2.7 5 0.50; 46.55 I; 6.50; 605:15 3.50: ...................:....................:... 325.85 ....................... 0.50: ........ ........ .....,....... .,-. 46.55 ...., ., ., ...... 0.5 0 4 6.5 5 1.00. ................................. ... 93.10 ............. 1.SOi 139.65 1.00; ....._.. ....:::... .... 71.23 .,,.»....... .................... 4.00; . .... ........... 2 8 4.92 ...... ... ,.. : . 12.50: . . .43 5.8 8 ................... ~ ................... TOTALS ... ...................... 52.782.07 .........................1:~~~.................. 93:10 0.50; 46.55 ~ ~ ~ ~ PROJECT TOTAL TO DATE 11/11/00 ~ ~ $5,785.96 ~ -1