Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Task Order No. 10069 with Murray Smith and Associates, Inc. for Water Master Plan
• TASK ORDER 10069 WATER MASTER PLAN CITX OF MERIDIAN,1[DAkIO • This Scope is for Professional Services between Murray, Smith & Associates, lne. (MSA} and the City of Meridian, Idaho (City). This proposal shall be for professional engineering services to develop a Water Master Plan (Plan). This Plan will evaluate the ability of the City's existing infrastructure to meet projected demands and regulatory requirements for the next 20 years. The terms of this work shall be in accordance with the MSA Master Agreen:eat for Ptn~essiona! Services, dated Juste 11, Zt1U7. Background This project will serve to provide the City with a Department of Environmental Quality (DEQ) approved Plan to specifically address the water system specific section. of 5$A1.0$ of the ldaho Code. This Ptan will serve as an update to previous water planning efforts conducted by the City that focused on existing and future supply as well as water quality regulations. It will also include new sections on operations and maintenance, source water protection, conservation, water supply planning as well as design and construction standards. The project will employ workshops to solicit stafyinput and develop consensus on what alternatives should be selected for future implementation. A 20 year capital improvement plan will be generated at the conclusion of the PIan that will describe the projects in a prioritized order and provide order of magnitude costs. The City has experienced very high growth rates over the past 20 years while the past two years have been relatively flat, illustrating how variable growth can be. The City is committed to updating their water master plan every five or so years. which enables them to provide course corrections on the longer term water use and capital improvement projections. The Gity's goal is to provide a detailed analysis of what is required over the next five years while also having a longer term capital improvements vision. SCOPE OF SERVICES • Task 1-Project KSck-Off & Management Sublask I.1-Kick-Off Meetirrg A kick-off meeting will beheld, once notice to proceed has been received, to officially start the project and discuss the details of the approved scope. MSA will lead the kick-off meeting with Gity Staff to introduce the project team, establish project objectives, review consultant and City communication protocol, discuss the project scope aad examine the project schedule. The primary focus of this meeting will be a discussion of the City's goals for the project and DEQ's requirements. City of Meridian, Idaho HURRAY, SMITH & ASSOCIATES, INC. Water Master Plan January 2010 EngineerslPlanners 1 of 21 ~~ MSA will also discuss the project with local DEQ staff responsible for reviewing the Plan. This meeting will be held to ensure that any particular areas DEQ would like the City to address will be adequately covered Assumptions • Assumes up to a four (4) hour kick-offmeeting with the MSA project manager, two (2} task leads and one (I) support staff. Two (2} hours of preparation time is included for the PM and each task lead. • If DEQ staff are not available for the kick-off meeting, MSA will coordinate with them directly. Deliverables • Action items from the kick-off meeting {delivered electronically) + Summary from DEQ meeting/discussions (delivered electronically) Subtask 1.2 -General Pro~'ect Management and Meetings The purpose of this task is to provide management of the project team, schedule and budget. Included in thistask are monthly invoicing, budget and schedule review, updates, and general administrative tasks. As project manager, David Stangel, will maintain regulaz communication with the City and the team throughout the duration of the project, lead meeting and workshop discussions, keep the City up-to-date on any study issues or details and make sure the City's i~ut is incorporated into the work product. The project will be imanaged to maintain the scope, schedule, and. budget. At a minimum, updates on project schedule and budget will be provided as part of the monthly invoicing process. Assumptions . • Meeting and workshop facilitation will be limited to those specifically identified in this scope of-work. • The City will provide clear, concise and timely input and review on the work products. produced by the consultant. • Six (b) hours per month have been budgeted for project management and meeting time for the twelve (12) month project duration. + Monthly project status conference calls will be held with the City. It has been as$umed that an on-site meeting will beheld every other month in lieu of the conference call. • No time will be charged for travel by MSA. Deliverables • Monthly invoices due to the City's project manager each month City of Meridian, Idaho M URRAX, SA'I117i & A550CIATES, INC. water Master Plan January 2010 EngineersJPlanners 2 of 2I • • Monthly Project Updates -specifically including budget and schedule status Subtask l.3 -Grant Funding MSA working with Shawn Charters, will provide a high level summary of the available state and federal grant funding options available to the City for their-water system. The document will include information on the specific requirements and deadlines for each program. Assumptions • The document produced can be included in the Plan if desired by the City. Deliverables • Technical memorandum summarizing the potential for the City to obtain grant funding, Task 2 Data Collection & Analysis In this task, MSA wi]I review background information already provided by the City and develop a formal data request for any additional information required for completion of the work. MSA will endeavor to limit the number of data requests that are made in an effort to minimize the required City Staff time. In this task, MSA will be responsible for identifying any required additional information and the City will be responsible for the collection and delivery of the requested information. It is anticipated that additional data requests will be made throughout the project, however the majority of the data required will be requested at the beginning of the project. Assumptions • MSA and the City will endeavor to identify and collect required data in a timely manner so as to not impact the project schedule. • MSA will not charge for travel time. Deliverables • Fozlnal data request(s) Task 3 -Water System Descrlgtion In this task, an existing system description will be generatexl for inclusion in the Plan. Existing information from previous efforts will be leveraged where possible. This task will also include development of a general description of the project area {water system service. area) existing conditions. This description will be as required by the DEQ for the development of a Facilities Plan as outlined in Idaho Administrative Procedures Act {IDAPA) 5$.01.08. City of Meridiea, Idaho M[1RRAY, SMITH & ASSOCI,A'E'F..S, INC. Water Master Plan January 2410 Engineezs/Plam-ers 3 of 21 The System Description is anticipated to include, at a minimum, the following compone~s: • Utility management structure . • .System background ' • Service Area and Pressure Zones • Inventory of existing facilities (wells, booster stations, reservoirs, PRVs) • Related plans, interties and service agreements • Existing and future service area Assumptions - • The City will provide GIS based information including; aerial photos, parcels, roads, contours, land use andJor zoning, city boundaries, service area boundaries, hydrology, water system features, and other available data for use in this section, as well as for general base mapping for all figures in the Plan, • IVISA will endeavor to minimize the information requested from the City to complete this work, All known and readily available existing condition information will be collected and developed into preliminary draft form prior to submittal of a data request to the City. • The project is not scoped to include all the requirements for-the DEQ SRF Loan (58.01.20 and 58.01.22) program. Those elements could be added during or after the completion of the Plan per an additional scope of work, Deliverables A Draft Technical Memorandum (elec:tronic version) System Description will be delivered to the City. Task ~ -Population and Demand Pxojeetlons The development of future population growth and associated water demand projections is a fundamental building block for determining the City's future needs. Of equal importance is understanding where in the system growth will occur so that infrastructure is adequately sized. In this Task, MSA will work with the City to develop and describe these items. Several pieces of information will be required to successfully project population and demands including: • Current and future service area boundaries • Location based population and employment information • Pressure zone delineation • Historical water usage by customer location City of Meridian, Idaho MURRAY, SMITH & ASSOCIATES, INC. Water Master Plan January 2010 Fngineers/Plamie~rs 4 of 21 • • Historical water production records • 20 year population and employment projections Current population and water production records will be used to determine per capita demands that can then be used for future forecasting. Historical SCADA will be used to determine the appropriate peak day and peak hour factors that should be used, The City has recently undertaken an aggressive reuse program at the wastewater treatment facility. This in conjunction with the more formalized conservaxion planning that is currently being undertaken may reduce the amount of water consumed by each customer in the future from an annual average as well as peak perspective. MSA would propose to develop two (2) different water use growth rates for the next 20 years. This would include a growth rate assuming per capita water use rates do not change significantly from those seen today and a second that assumes at least a modest reduction due to an active conservation program. This reduction may be in the order of 10 to 20 percent, but more importantly it will provide numbers to evaluate the capital investment impact of trying to actively promote conservation versus staying the current course. The percentage to use will be identified in Task 5 as part of the conservation planning effort. Within the last two years MSA has made population projections fvr the City using COMPASS information. MSA would propose to utilize this process again unless other City Comprehensive Planning data can be provided. The COMPASS data utilizes traffic analysis none (TAZ) based data that can be overlayed with the City's service area and pressure zones. It is the intent of the Plan to tie future improvements to population and the related water usage thresholds, not necessarily dates in time. This will enable the City to utilize maximum day demands (MDD) for example, as "trigger points" for determining when new supply or storage should be constructed. Assumptions • MSA will utilize COMPASS based planning data unless other information is provided. • Five (5) and twenty (20) year projections will be made for population and demand by pressure zone. Deliverables • A Draft Technical Memorandum (electronic version} summarizing the population and demand projections. Task 5 -Water Supply Planning Subtask S.1- Couservation Flag Development The City currently does not have a formalized conservation plan. This subtask would provide the basis for the development of a conservation plan that could ultimately serve as a City of Meridian, Idaho MURRAY, SMITH & ASSOCIATES, INC. Water Master Plop January 2610 Engineers/Planners 5 of 21 • stand-alone document. Some of the initial steps required for the development of a conservation plan are already included in the overali Water Master Pian and can be leveraged for use in this subtask. This includes reviewing the existing demand forecast and describing the water system. MSA would propose the conservation plan include the following steps: l . Idenrify any existing conservation measures 2. Define conservation potential 3. Identify potential conservation measures 4. Perfi'orm cost/benefit analysis 5. Select conservation measures 6. Summarize Phase 1 and longer teen conservation goals 7. Document conservation plan MSA would conduct a conservation planning workshop with City staff to discuss, existing conservation measures, formal or informal. A large portion of the workshop would be spent discussing potential conservation measures that could be implemented that are specific to the City of Meridian such as; leak detection, sowce and customer meter maintenance, pressure reductionlmanagement, inclining block rate structures, conversion of neighborhoods or commercial/governmental users to non~potable irrigation, public education programs, appliance rebate/replacement programs, smart irrigation control systems, establishing a City Conservation Coordinator and water conservation ordinances. The City may choose a number of these to evaluate from acost/benefit perspective for phase 1 implementation. City staff will then take the lead in evaluating and documenting various conservation measures. The City will then prepare information to be used. in a second workshop to discuss the findings of the cvst/benefit analysis and to make recommendations for which measures should be implemented, which MSA will attend. MSA will make suggestions based on previous experience on the City's conservation planning. The City will prepare a document summarizing the Phase 1 conservation goals and longer term goals wilt be developed. MSA will review this document and provide any additional recommendations that maybe incorporated. Assumptions • The City will take the lead in developing the conservation chapter and will provide a written document in Microsoft Word format that includes all required information. • Two conservation workshops are included in the scope of work • The conservation plea will be included as a chapter in the Plan. • No additional council presentations or meetings have been included in the budget for the conservation planning. Deliverables • No specific MSA deliverables are associated with this subtask. City of Meridian, Idaho HURRAY, SMITH & ASSOCIATES, INC. Water Master Plan January 2010 EagineerslPlauners b of 21 • Subtask 5.2 -Water Rights Analysis The City has a water rights strategy, including a plan for water rights transfers, licensure, new applications, etc. However, per the City's feedback, the strategy is not well documented. The goal of this task is to provide a high level review of existing documentation provided by the City and their hydrogeology consultant. The MSA team will provide a summary document for inclusion in the Plan that will not exceed two {2) pages in length. Other information provided by the City can be included as an appendix to the Plan. Assumptions • Due to the unknown nature of the existing water rights documentation available for review and the length ofrequired interviews and meetings, a nominal effort oftwenty (20) subconsulting hours has been included for this effort. If the level of review of the existing documentation is going to exceed the amount budgeted the City will be notified as soon as possible to discuss how to proceed. Deliverables • A document summarizing the City's existing water rights planning efforts and strategy will be provided to the City as part of the overall Water Supply section. Subtask 5.3 - Interties The City has opportunities in a few locations to create emergency interties with adjacent public water purveyors. This would likely provide a two way flow of water under emergency conditions. The City has existing locations already identifed and this subtask would simply provide a review of those locations and document the assumptions associated with their operation. A map including the location of the potential interties would be included in the document. Assumptions No time has been budgeted to conduct discussions with adjacent purveyors on the details of an interagency agreement regarding the interties. The documentation will simply identify the potential locations and that the City will conduct formal discussions_ outside the scope of the Plan. Delivernbles A document summarizing the City's potential intertie locations will be provided at part of the overall Water Supply section. Subtask 5.4 -Water Supply Workshop MSA will prepare for and conduct a one day workshop focused on the long term water supply options available in the Treasure Valley and specifically the-.City of Meridian with City staff: The. workshop will discuss the potential fox the City to remain on groundwater to ultimately serve build-out demands from bath a water quality as well as water rights perspective. The workshop will also discuss the potential (from a water rights perspective) of whether surface water from irrigation canals or other surface water sources could be a City of Meridian, Idaho MURRAY, SMITH & ASSOCIATES, INC. Water Master Plan January 2010 Engineers/Planners 7 of 2I • viable option in the future. In addition to MSA star, the discussion will include Dr. David Tuthill, former director of the Idaho Depar(xnent of Water Resources and an expert in idaha's adjudication grocers. Sherrill. Doran and Kevin Boggs of CH2M I IILL who have recently completed a similar evaluation for the City of Boise and for the Bureau of Reclamation will also participate in the workshop. A legal perspective from the City's water rights attorney will also be provided The workshop is meant to be a high level discussion to assist the City in determining if the development of a secondary water supply strategy beyond groundwater should be considered and studied further. The workshop will primarily leverage local experts that have specific knowledge on the topic and will not rely on any significant Meridian specific analysis prior to the discussion. The workshop proceedings will be summarized in this section and a recommendation from City staff on how they wish to proceed from a long term water supply strategy standpoint will be included. Assumptions • The City's water rights attorney will also attend the water supply workshop and who will bill the City directly for their time. Any additional analysis requested by the City outside of the workshop will be considered out of scope work and will require separate authorization. Deliverables • A document summarizing the City's short and long term water supply strategy will be provided as part of the overall Water Supply section. Subtask S.S -Water Supply versus Demand An update to recent calculations of water supply versus demand will be calculated on a pressure zone by pressure none-basis for existing, five and twenty year horizons. This will. include the evaluation of standby power as well as peak hour demand and maximum day demand plus fire flaw compared with available supply. This subtask will also include an updated discussion on the City's policy to serve peak demands and fire flows from wells versus reservoirs and boosters. A meeting will be held with City staff to discuss this issue and decide on a course of action moving forward. A policy of how the City will proceed in the future will be discussed and recommendations made at the conclusion of the section. Assump~ons The format utilized for previous water supply evacuations provided to the City will be used. Deliverables • A document summarizing the City's water supply versus demand will be provided as part of the overall Water Supply section. Ciiy of Meridian, Idaho MURRAY, SMITH & ASSOCiATF~, IMC. Water Master Plen January 2020 Fngineers/Plaaners S of 21 • Task 6 - systems Anatysl~s Task 6 includes analysis of the maJar components of the City's distribution system other than supply. The analysis will identify deficiencies and improvements associated with system capacity and condition ofpumping and storage facilities. Subtask ~ I - De,~ne Design Standards The design standards applicable to the City's system and used in the hydraulic analysis will be identified including minimum and maximum pressures, velocity and fire flows. Many of these standards will be based on the IDEQ requirements described in the Idaho Administrative Procedures Act (IDAPA), or if desired, a mare conservative standard, set by the City. A discussion that may include the City's fire chief is included in the. scope. Assumptions • The design stand$rds agreed upon as part of this subtask will be used to identify hydraulic deficiencies in the hydraulic analysis Deliverables • A document summarizing the City's selected design criteria will be provided to the City. Subtask 6.2 -Develop Infowater Model MSA will perform a conversion of the City's existing EPANet based hydraulic model to Infowater. This will include but not be limited to pipeline lengths, diameters and C-factors as well as all pertinent facility information for wells, boosters, PRVs and reservoirs. Options for running the model using variable frequency drives (VFD) will also be included. Model elevations will be updated if required. This subtask will also include time to get the model running under steady state conditions using "test" demands. Assumptions • The effort budgeted assumes the model will be created from the existing EPARIet model. • it is assumed that the City has selected Infowater for future hydraulic maieling efforts. • No budget has been included for the actual purchase of the modeling software. • Assumes that all information required to construct the model is readily available from City sources in electronic format. • Assumes that all required facility information is available from the existing model or GIS. Deliverables • Complete steady state model with the exception of demands, City afMeridian, Idaho MURRAY, SMITH & ASSOCIATES, INC. WaterMaster Plan January 2010 Engineers/Planners 9 of 21 • Subtask 6.3 -Demand Allocation Utilizing the City's billing records, a Iink between model nodes and customer demand will be created. This will be done by creating an x,y location for each customer by geocoding, physical address or parcel centroid. This will be set up so that the City can update demands in the future. Historical production and SCADA records will be obtained for the previous three {3) years and customer demands will be peaked to match average, maximum and peak demands in the model. Flow records for the system pR~ts will be used to balance the demand in each pressure zone. Future demands will be allocated based on the work performed in Task 4 by pressure zone for five {5) and twenty (20) year horizons. Assumptions • One of the methods identified above to locate customer demand will be used. • Assumes no field data collection will be required by MSA • Assumes adequate historical SCADA records are available in electronic format. Deliverables • A working steady state model with existing and Future demands will be delivered. Subtask 6.4 -- De-~elop Calibration Plan and 12eview Fire Flow Procedures MSA will develop a proposed calibration plan for collecting pressures and flows at hydrants throughout the system. A technical memorandum will be prepared that documents the location of each proposed test and the procedures use to collect the data. MSA will include up to one day of field time to advise on the procedures used by City field crews. Assurt3ptinns • The City will take the lead in collecting pressures and flaws in the system including providing all the required equipment. • One day of field time has been included for one (1) MSA staff to assist with the field testing. • The field testing may require up to one week of field time by City crews. • City staffwill ensure the SCADA is recording all facilities during the field calibration effort. Deliverables • Technical memorandum detailing the proposed field testing locations and procedures. Subtask 6.5 -Model Calibration MSA will conduct a steady state calibration of the model using the field pressures and flows as well as boundary condition information for all facilities collected by City staff. Based on City of Meridian, Idaho HURRAY, SMITll & ASSOCIATES, INC. water Master Plan ]anuary 2010 F.agineers/Planners t0 of 2I the results of the calibration, additional tests may be required to validate model results. Results will be documented in tabular and graphical format for inclusion in the Plan. Assumptions • The City will providea tabular summary of.all the fre flow tests that will include; date, time, location of tests and results of both the static and fire flow conditions. • The City will provide SCADA information for ail facilities in an electronic format for the time of the field testing in adequate time resolution {i.e. 1 to 5 minute). • Accuracy of the calibration will be targeted at 5 psi difference for static tests and 10 psi difference for fire flows. • No additional field time for MSA has been budgeted for this subtask. Deliverables • Results of the steady state calibration and a calibrated model will be provided to the City. Subtask 6.6 - Model.~nalysis Support and Verification Once the model has been calibrated it will be delivered to the City. The City will then perform the existing and future evaluations to identify deficiencies based on the design criteria. It is anticipated that the City will at a minimum conduct steady state evaluations under ADD, MDD, PHD and Fire Flow for existing, five (5) and twenty {20) year scenarios. MSA will provide up to sixteen (l 6} hours of support for working through these scenarios. Once completed, MSA will utilize the model to provide an independent verification of the results found by the City for the scenarios described above. MSA will provide documentation in the form of a narrative as well as tables and figures for the analysis. Assumptions • MSA will deliver a calibrated steady state model to the City for use in the existing and future analysis. • The City will provide some form of notes on the analysis performed noting locations of deficiencies and potential improvements. Deliverables • A technical memorandum documenting the steady state analysis for inclusion in the Plan. Subtask 6.7-Develop EPS Model MSA will work with the City to develop an extended period simulation (EPS) or dynamic model. This will include the identification of valid diurnal curves for summer and winter conditions in addi#ion to loading in all well and booster pump controls. MSA will assist the City in getting the model running under EPS conditions. City of Meridian, Idaho HURRAY, SMITH & AS3gCIATES, IIYC. Water Master PIan Ianuary 20]0 En~uteere/Planners 11 of 21 • Assumptions • No analysis specific to the Plan is included in the scope. • The model will not be "calibrated" under EPS conditions, though the process to complete this will be discussed and-could be included under a separate scope of work. • No specific documentation is included in the subtask. Deliverables A working EPS model will be available to the City at the conclusion of this task. Subtask 6.8 -Training ofSta,J,~'on Model Use and On-Call Support MSA will work with City staff in the use of the model as part of Subtask 6.6. In addition to this time, up to sixteen { 1 G) hours of time has been budgeted for snore formalized training in the use of the Infowater software and in the use of the City's model. This may take the form of two (2) days of more formalized training or could be a number of shorter informal sessions. Up to twenty (20) hours of on-call support is also included in this task that can be used at the City's discretion. This time can include eitkter on-site or "online" training. on an as needed basis. Assumptions • No specific timeframe has been identified for the training and can be requested at any time after the model is developed. Deliverables Model training agendas and formalized modal procedure documents will be delivered as part of this subtask. Subtask 6.9 -Condition Assessment a,,}`' Wells, Booster Stations and Reservoirs MSA will conduct anon-site interview with the City's operations and maintenance staff regarding the condition of the wells { 1'T), booster stations (2) and reservoirs {2). Time to visit up to two {2) sites has been included. MSA• will summarize the condition information and any capital improvement projects identified by the City staff. Condition related improvements will be included in the system analysis workshop and overall capital improvement plan. Assumptions • One day of time has been budgeted to meet with City staff and visit up to two {2) facilities. Deliverables A listing of condition related issues far facilities as identified by City staffwill be generated during this subtask. City of Meridian, Idaho MURItAY, SMITH & ASSOCIATES, INC. Water Master Plea January 2010 Eggineers/Plannens I2 of 2I r_~ ~_~ Subtask ~ 10 -- Systeus Analysis Workshop Once the model has been simulated under existing, 2015 and 2030 scenarios and existing system conditions at all facilities have been assessed, a workshop will be conducted with City staff to discuss the resulting deficiencies and alternatives for potential improvements. If new possible improvements are identified in this workshop, same additional modeling to verify their operation may be required. .~4ssumptions • A qne day workshop of up to six (6) hour duration for three (3) MSA staff will be held on-site with City staff and MSA to discuss the deficiencies and identify potential solutions. • One day of preparation time for the project manager and staff engineer are included in the budget. • Budget to perform additional rngdeling is limited to eight (8) hours. Deliverables • A preliminary listing of the proposed capital improvement projects will be produced. Subtask 6.11-System Analysis Docume~ltatio~r The system analysis section will constitute a large and important chapter in the final Plan. A draft technical memorandum will be produced allowing City review prior to the delivery of the draft Plan. The documentation will include, design standards, model network development, model demands, model calibration, model analysis, condition assessment, and the results of the system analysis workshop. Assumptions • The technical memorandum delivered in this sbtask wilt be converted into a Plan chapter once comments have been received. Deliverables • A draft technical memorandum for the System Analysis section. City comments will be incorporated into the draft Plan. Task 7- Water Quality & Regalattons Task 7 will be focused on updating the water quality and regulations and chapter from the last water master plan. No significant changes are proposed, however all existing regulations will be updated, new ones -that have been. added and a short summary of future proposed regulations will be provided. A summary of areas of concern far the City from a water quality perspective will be provided. City of Meridian, Idaho MURRAY, SMITH & ASSOCIATES, IlYC. Water Master Plaa January 20I U Engineers/Pia~mers I3 of 21 • Assumptions • The format from the last water master plan will be used unless otherwise specified by the City. • The City will pmvide a summary of all water quality sampling since 2005. Deliverables • A water quality and regulation section will be developed as part of this subtask. Task 8 -Operations and Malntenattce MSA will work with City staff to create an operations and maintena~e (O&M) section that will be included in the Plan. No previous water master plan in the last ten years includes O&M sections. MSA would propose to documerrt the following items in this section of the Plan: • Water system management and personnel • Operator certification • System operation and control • Crass connection plan • Emeegency response program • Safety procedures • Customer complaint response program • Record keeping and reporting • Current leak detection program • Current Flushing program • Current valve maintenance program • Operations & maintenance needs and improvements MSA will also perform benchmarking of at least three to four other similar sized utilities in Idaho on a number of O&M items such as; number of staff, size of system, yearly budget, yearly capital and replacement budget, leak detection and flushing program. This information will be summarized and documented in the Plan. MSA will also conduct ansite interviews with staff concerning current O&M procedures. MSA will review the City's procedures in light of the American Public Works Association (APWA) certification program. if desired by the City, O&M related items may be included in the capital improvement plan. City of Meridian, Idaho HURRAY, SMITIi & ASSOCIATES, .INC. Wafer Master Plan January 2010 F.ngineers/Planners 14 of 2l • Assumptions • The City will provide copies {preferably electronic) of above listed items where available. • This. subtask budget does not include creating the items listed above. The budget assumes that the City has these items available for review and inclusion in the Plan. • Up to one day of on-site meetings and interviews by two (2} MSA. staff will be conducted with City O&M staff. Deliverables • A draft O&M section will be prepared as part of this subtask. Task 9 -Facilities Design & Construetfon Standards The City currently has a number of formal .and informal standards for the design and construction of facilities. MSA will pmvide a high level of review of these standards and pravide recommendations on where further standardization and formal development is warranted, Of specific interest is in regards to the development of a well design standard. Review will focus on water system related features including; piping, wells, booster pumps, reservoirs, PRVS, SCADA, general appurtenances as well as lot size for different facilities. Assumptions • Up to forty (40) hours of time has been budgeted to provide review and recommendations on the City's existing standards. If additional effort is anticipated to adequately review all existing information the City will be notified prior to exceeding the task budget. Deliverables • A design and construction standards review summary will be developed as part of this task. Task 1 Q -Capital Improvement Plan Task 10 will be focused an the development of a capital improvement plan {CIP) for the next twenty (20) years but will focus on the next five (5). There are two primary pieces to this task; the development of the unit costs that are applied to each of the identified project and the CIP prioritization workshop. Subtasd XO.I - Development of Unit and Project Costs Based on the recommendations from Tasks 5, 6, 7, and 8, a list ofproposed projects based on hydraulic deficiencies, conditions. related issues or O&M items will be generated. Unit costs far pipelines, wells and reservoirs in particular will be developed for ,generating project specific order of magnitude casts. Each project will be described in terms of the reason for City of Meridian, Idaho MIIRRAY, SMITH & AS30CIATES, INC. water Hasler Plan January 2010 Engi~ersJPlanners I S of 2 t • the improvement, the location, its size and extent, as well as the total project cost including engineering and construction. Corresponding figures will be generated showing the improvement. along with a unique identifier that will also be populated in the hydraulic made). MSA will compare the capital improvements identified within the City's existing CIP with those generated as part of this PIan. Where project costs are different, these differences will be reviewed and incorporated into the Plan where appropriate. Where possible, a demand threshold will be identified that defines when a specific project is required, that will also be associated with a projected timefratne. Assumptio~ts • The City will provide bid tabs for any water projects constructed over thepast ten (1Q) Y~~- • The City will provide the existing water system capital project list. • MSA will utilize cost estimating conducted for other Idaho and northwest utilities cost estimate references (e g. RS Means) and the current Engineering flews Record {ENR) indices. • Order of magnitude cost estimates in 2010 dollars that are accurate to within plus 50% and minus 30%. Deliverables • A draft CIP will be developed as part of this subtask. Subtask XO.Z -CIP Prioritization Tfi~orkshop MSA will conduct a prioritization workshop based. on the draft CIP. MSA will work with the City to develop criteria for the prioritization based on a aumber of factors including; whether it is an existing deficiency or not, the extent of the deficiency, number of customers impacted, type of customer impacted, whether it addresses both a hydraulic aad condition deficiency, and others. Projects to be implemented in the first five (5) years will be identified first, then those in the 5 to 10 year range and finally those between 10 and 20 years. The CIP documentation developed in Subtask 1.0.1 will be updated at the conclusion of this subtask. Assumptions • A full day on-site workshop has been budgeted for this task. Appropriate MSA task leads and City staff will be required. • MSA will leverage City stafl'and existing City C1P documentation where possible and appropriate. Ilelivsrables • A draft prioritized CIP will be developed. City of Meridian, Idaho MITRRAY, sMITII & ASSOCIATItiS, INC. Water Master Pian January 2010 F,ngineene/Planners l6 of 21 • Task 11-Financial Anatysis MSA will utilize the CIP developed as part of Task 10 to identify the funding requirements by year. The City will provide a copy of their existing water rate model to MSA. The model will be used to project the required rates and hook-up fees for the City to gay for the proposed Plan CIF. If the City's existing rate and hook-up fee. structure is not projected to be adequate, recommended percent increases. will be provided.. MSA will also provide a review and recommendation on the appropriate depreciation rate t© use in its .rate calculations. Ultinrlately a summary document will be produced that provides a discussion on the adequacy of the City's current rate structure to pay for the identified improvements. Assurfeptlons • The structure and assumptions within the City's existing rate model will not be reviewed as part of this scope. • Costs for capital versus operations and maintenance will differetatiated in the analysis. • The City will provide a copy of the rate model in an Excel format for use by MSA. • An initial meeting will be held for City staff to review the existing rate model spreadsheet and explain its structure and functionality • A meeting will beheld with City staff and MSA once the analysis has been completed to review the rate model results. Deliverables • A financial summary document will be developed as part of this task. Task 12 - ReporE Preparation As previously described, MSA will develop a Flan with the sections described in this scope and ultimately obtain Idaho DEQ approval. Task l 2 is intended to take the work products and findings from the previous. tasks and consolidate them into a single document. The Plan is anticipated to include the following major chapters: 1. Introduetion/Executive Summary 2. Existing Systems Description 3. Population and Demand Projections 4. Water Supply Planning a. Conservation Planning b. Interties c. Long Tetra Water Supply Options d. Water Supply Versus Demand City of Meridian, Idaho MLIRRAY, SMITH & ASSOCIATES, INC. Water Master Plan January 2010 EngineerelPlannera 17 of 21 ~J 5, System Analysis a. Model Development and Calibration b. Hydraulic Analysis and Deficiencies c. Condition Analysis and Deficiencies b. Water Quality and Regulations 7. Operations and Maintenance 8. Design and Construction Standards 9. Capital lmprovement Plan 10. Financial Plan l 1. Appendix Task 12 includes the generation of the drab and final Plans. The City and DEQ will provide review and comment on the draft prior to developing the final Plan. Review meetings are included with both the City and DEQ. What is included in the appendix for supporting documentation will be agreed upon by MSA and the City. ' A public council presentation will be provided by MSA once the draft has been reviewed by the City. The public council presentation will be held not only to present a summary of the plan to the City Council, but to meet DEQ requirements for public presentation of the Plan. A final document that incvrpviates al] final City {staff and council} and public comments will be prepared and submitted to the City and DEQ. Assumptions • Draft and final. deliverables will be in electronic format, except where requested by the City and DEQ. In those cases where printed versions are required, no more than. 5 total hard copies will be produced. • Review period for the draft submttal by the City has been scheduled to take no more than ten (10} work days. • Review period for the draft submittal by DEQ, has been scheduled tv take no more than twenty (20) work days. Deliverables • Draft and final versions of the document will be delivered to the City and DEQ. An electronic PDF version of the document will also be delivered to the City of both the draft and final. Task 13 --Out of Scope Work This task is to be utilized by the City to authorize MSA to complete discrete tasks that are not currently included in the overall Scope of Work related to the Plan. Once out of scope items City of Meridian, Idaho MURI~AY, SMITH & ASSOCIATI~S,111TC. Water Master Plan January 20l 0 EngiaeerslPlaaners 18 of 21 ~' • L' are identified, MSA will notify the City and prepare an email estimate of the level of effort. MSA will only commence work on the out of scope tasks once approval is provided by the City. Assumptlans • A $10,000 budget has been included for this task to be used at the City's direction. • The budget identified for this task may not be adequate to perform out of scope work depending on the level of effort requested by the City. Deliverables ~ To be determined. City of Meridian, Idaho MURRAY, SMITH & ASSOCIATES, IlVC. Water Master Plan January Zfl l0 EngineersiPlanmers 19 of 21 • • • BCTDGET The overall mot to exceed budget estimate for this project of $199,547 is shown in Table 1. The work pravided in this Task Order will be billed on a time and expense basis. Table 1 Total Project Fee Task Rows Subconsttlt aunt Cost Fee Task 1: Project Management & Meetings 104 $825 $15,231 Task 2: Data Collection 2g - $3,320 Task 3: Existing System Description 28 $2,984 Task 4: Population and Demand Projections 46 - $5,498 Task S: Water Supply Planning 164 $10.984 $32,444 Task 6: System Analysis 522 - $fiS,806 Task 7: Water Quality and Regulations 4g - $5,064 Task 8: Operations & Maintenance 70 - $8,270 Task 9: Facilities Design & Canstructioza Standards 42 - $6,084 Task 10: Capital Improvement Plan 112 ' $13,89b T 11: Financial Plan 70 - $8,690 Task 12: Draft and Final Plan Development 186 - $22,240 Task 13: Out of Scope Wark TBD $10,000 Project Total 1,420 $11,$09 $199,547 TIME OF PERFORMANCE The Plan is anticipated to be completed over a period. of approximately 12 months, beginning in February ZO10. MSA will make every effort to complete the work in a timely manner; however, it is agreed that MSA cannot be responsible for delays occasioned by factors beyond its control, nor by factors that could not reasonably have been foreseen at the time this scope was executed. An updated Schedule will be provided to the City at the kick-off muting and modified as required as the project progresses. City of Meridian, Idaho HURRAY, SMITH & ASSOCIATES, INC. Water Master Plan 3arroary 201Q EngiaeerslP'lamiers 24 of 21 Tammy de Date: Attest: ~ Jaycee dolman, City Clerk Date: ~~9 /~ J \ ```111111111111!////',, ~~~\\`\~-`~ ~ ~I '''iii ~r~o '~ SEAL ~~~ \ Public orks Date: ~ °~ ~~ ing Date: 2 - ~ ~ - ~ [J Approved by City Council: 02 ' 9 " ~ 0 Murray, Smith & Associates In . By: Title: _ ' ` 'Rno~, q ; rq rCi nC~ Date:~~~ ~ City of Meridian, Idaho HURRAY, SMITH & ASSOCIATES, INC. Water Master Plen January 2010 F,ngineeis/Planners 21 of 21