November 29, 1995
Shari Stiles, Planning Director and Zoning Administrator
City of Meridian
33 East Idaho Avenue
Meridian, Idaho 83642
RE: Chem-Lawn
2393 E. Commercial St.
Dear Shari:
This letter is in response to your comments dated November 10, 1995.
1. There is a slight discrepancy in the scale. The noted scale is 1 in = 20 ft. and all
the dimensions of the buildings and between the buildings are called out.
2. Center line of E. Commercial is shown on revised plot plan attached.
3. Sidewalks changed to 5 ft. wide.
4. Screened trash areas shown on plans.
5. We have 15 feet from property line to curb. Landscaping shown to extend
the 15 ft. width.
6. There will be an underground trickle irrigation system.
7. There is a chain-link fence extending full length of South Boundary, the fence is
located on the property line and does not encroach on railroad right-of-way.
8. Additional parking is added to show 27 total spaces.
9. Asphalt areas depicted on plot plan.
10. Parking dimensions changed to meet ordinance.
235 WEST IDAHO AVENUE ^ P.O. BOX 85 ^ ONTARIO, OREGON 97914 ^ FAX: (503) 889-4419 ^ (503) 889-5411
EDWARDS
ENGINEERING
SERVICES
Page 2 of 2
11. Detailed landscaping plan shown on 1
plantings.
12. Handicapped parking moved to next
Attached is revised plot plan which pertains to item,
If you have any additional questions please contact ~
Respectfully submitted,
f ~
~_
_t-
-Stewart R. Edwards
Professional Engineer
Attachment: Revised plot plan
235 WEST IDAHO AVENUE ^ P.O. BOX 85 ^ ONTARIO, OREG~_....... _ .. _.. ,___, __. .... _ ,___, __. _ .. .
P~(yF'4~S~~L
444 W. Karcher Rd.
I Nampa, ID 83687
:'"""~ aYlllg Asphalt Co. Phone (208) 466-4051
PRUPfiSAI. SUBMITTED TO: pH1jNE DATE
Excel Ventures, Inc. 454-2785 4-8-96
STREET 1r)B NAMB
13366 Chicken Dinner Rd. Excel Ventures
t'I'I'1'. STA'I'}i ANU'!.0' CtJDL• JOB LOCATION
Caldwell, ID 83605 La ne Industrial Park
:Vit;Hr rEt;T DA'I'G OF PLANS 1+AX PHONE NLIMBER JUB PHONE NUMBER
Edwards En ineerin Services IO-20-95 454-6552
1 f'e hereb~~ sub»ut specifications and estimates for:
1. Cut-in ditch along West property line to feed storm water to drainage retention pond.
2. Excavate and shape retention pond, (Approximately 140' x 40' at top). Place filter- sand in
bottom.
3. Construct Swale for retention along South edge of Asphalt and tie-in to pond.
Note: No concrete structures or filter fabric included.
jj~/Ie ~'Jropose hereby to furnish material and labor -complete in accordance with above specifications, for the
sum of:
T1~tEE-THOUSAI~ID FIVE-1?Lt*:DP.ED DIL*:-il'-T~~lri) and i~ioi 100 dollars 92.00
Payment to be made as fa!lows: 100% upon completion mtd/or by mongtly paytneni requests. Progress estimates submitted by fire 25 ' o each month are
due by the 10°i of the following month. All unpaid bal.~tnces may accrue interest at highest legal rate.
.4ll matzrial is guaranteed to be as specified. All wotJc to be completed in a worlananlike
manner according to standard practices. Any alteration or deviation from above specifications
mvolvmg zatra costs will be executed otdy upon written orders, and will become an extra
charpz over mtd abovz the estvnate. All agreements contbtgent upon strires, accidents, or
dzlnys beyond our control. Owner to carry fire, tornado and other necessary utsurance. Uur
workers are fully covered by Worlanen's Compensation insurance.
Acceptance of Proposal: - T'he above prices,
specifications and conditions are satisfactory and are hereby
accepted. Payment will he made as outlined above.
Note: this proposal tnay be
withdrawn by us if not accepted within twenty (201 days.
.-~uthorizzd n ~~
Accepted by:
Date:
Dennis R. Wells, Sec
~~~' -~
o~~ merv
irvc
~~~h,If /~;~~~~~ LANDSCAPE ARCHITECTS
MARCH 11, 1996
PROJECT: EXCEL VENTURES
PLANTS INSTALLED
OPTION #1
PROJECT' ESTIMATE
PLANT NAME ONTY SIZE ~ TOTAL
SUMMIT ASH 49 3" CAL $120.00 $5880.00
PLANT TOTAL $5$80.00
INSTALLATION & 1 YEAR GUARANTEE 3528.00
TOTAL FOR PLANTS INSTALLED $9408.00
OTHER CONSTRUCTION REQUIRED FOR SITE DEVELOPMENT
58 YDS LAVA INSTALLED
9450 SQ FT WEED FABRIC INSTALLED
DRIP IRRIGATION INSTALLED
FINE GRADING
TOTAL FOR OTHER CONSTRUCTION
TOTAL FOR OPTION #1
OPTION #2
PLANT NAME QNTY ~E ~
SUMMIT ASH 49 3" CAL $120.00
PLANT TOTAL
INSTALLATION & 1 `TEAR GUARANTEE
TOTAL FOR PLANTS INSTALLED.
OTHER CONSTRUCTION RE~UIRE1 FAR SITE D
9450 SQ FT SOD INSTALLED
SPRINKLER INSTALLATION
FINE GRADING
TOTAL FOR OTHER CONSTRUCTION
TOTAL FOR OPTION #2
$2610.00
1512.00
1775.00
47 0
$6372.00
$15780.00
TOTAL
55880.00
$5880.00
$2362.50
3095.00
0
"~$T~932.50 °~
5340.50
2528 N. CLOVERDALE RD. Y BOISE, IDAHO 83713
(208) 378-0418. Y FAX (208) 375-6173
SEPJT F1r':Narr,F•=, F~~.lir;? C~~. :11- 1-~S ~3::~7PM 2~~466~~?1-i_'~S~54o~~1 :>+ 1
suerw{TTEO to
BYi~ ~h~~ ~Oi,
CtTr, tTATE AND ZIP
-~.:_
ANCMIT[CT
Edwards
~~~~u~tt~ PfaBfa No. of Peps
aaa w. ItARCyarR Rp.
NAMFA, IDAHO 83687
PHONE (208) 488-405
PHONE ,4 rJ,4 ,• 2 7 $ ~
3 , Is1C .
roe
ginner Rd.
obi
__ 83!;05 _ ___
1 DATE OF PlAN9
ineerirr~ ~ervities
Wta herr:by submit tp~Cifipfbona and estimates for
auildirtg c.ornors 14Crae8d end atfYknd by othorta. From Hoachmark 4~Rt:~bliiih•Q by pthorq, NDA will
doaign for draliaega, asid Ot;tkf~ ftSr Huildia$ Pad 41pv~,tipri sxsc4 Atiphffalt; Ffiving rfalata8 itti,raa.
Building Pad Construction
-1- Excavate ~% subgrade for Building Pad construction.
Basis for excavat~.on: 1) approxitrately 57, 5p0 sf site area to be
excavated for building areas. (2 Material to ::amain on project site or
property contiguous thereto. (3 Excavat~.on depth to max. average cf 2.50'
-2- ,moor! and place Pit Run as subbase for three buildin~~ pads totalin~7 5^, 540 sf.
On site fill materials shall be used if more than 1.0' of fill is re;:ired to
FF minus 1/CC n.l.nus 4 " of 3 / 4 " road mix . Road Mix to be placed by ot: he ~ ; . Wi 11
deliver F48 J4kaitR for $6.50/cy.
Building Pads: Staking, Excavation, Fit Run Fill r.i~,593.04
Asphalt Paving Construction
-1- Excavate to subyrade for Asphalt Paving Gonstructian. Basis for exca•~a'_icr.: i)
approximet';ely 90,000 sf site area tv b~l excavated for Asphalt Paving. (2
Material to remain on project site ox' property contiguous thereto. (3
Excavation depth to max. average of 1.50'
-2- Import and place Pit Run, (up to 1,0'), as subbase for Asphalt areas.
W'e are using ~0,00~ sf as basis for our paving est..mate.
-3- Import and place 4't of 3/4" Road Mix as base for A>?tphalt Paving.
-4- pave all asphalt areas with 3" compacted Asphalt Concrete.
Asphalt Pav:.ng: Complete X,800.00
Note: Final billing for Asphalt Paving mast be more t3:' less. Final amrun
to be arziveri at with finished ;ab m:~asuxoment bil:.fad at $i . u2/sf .
estimated Early Start: ].0/30/95
Late Start: it/06/9S
,tote: proposal does not include any, Pipe/Drainage work, Footing Ex yr Backfil,
Concrete work, resting or Sterilizat:ton.
Owners are req~i~-ed to secure all necessary permits.
~P ~rp~lp~p ~?•reby to furnish material and labor -complete in accordanre with above spetificetiong, for fhe sum of
E-HUNDRED TWEfITY-FGLr~ THOU3AtQD FOUR-IiUNDRED NINE.Y-THREE and No,'100dollars (~ 124, 493.00 ~
byment to lK mrdo ss 1nltotRs
100~s upon completion and/or monthly progress estimates. Unpaid balance tn~~_
accrue interEStr at legal rate.
AI{ mraNrill }f 4uhAntNd to ba }r fpeC,6id. Alt work td ba Completed m ! «erkmtrnliks
mrrnnrtr trecardint to lt~rdird pratiCq. Any a~IHrltlon or OVwltion tram lDOVR spaelfkl. AutAori2ttd
dons Involvlnt .sqa costa w81 ~ ~^acutad only upon wrgtsn ord.rs, and w11t beeo.na !e S,gnalurb -~-~------
raelyd ehlr*o Orr •ne lbbva tM l~ii!xt,?- All nrNminta cenUnttnt upon strAn, !ee'rdenrs L°:1211 B R . W e 118 , s e C .
er detlys bhrond our control. Ctiera !e Bury iln, tornsdo !ne other n.cvaalry ~nwr.crce. Not,. Thie propctsl may be*
Our workers are lolly eevarld by +h'arkman's CompranLtion tnsurrrnee. withdrawn tiY u6 if cot dCCtl~ttDd Withh diaW en~iay ~~'~~ ddrK•
_. .,, _. .
.xa.i.aa
DATE
11-01-95
res
j~
f
x~1~-
FENCE CO.
(208) 888-9197
CDMttFACIAI 8 INDUSTRIAL
2115 FAIRVIEW • MERIDIAN, IDAHO 83642
T DAT /.Z r• ~"
SOLD TO___ G ~ ~ ~' r I "~./ /~ A r ^s HOME PHONE
ADDRESS ~-+e WORK PHONE~r ~ ~ ~ r~ 1
JOB LOCATION - DIG LINE NO.
FT. l~t~ FT. HIGH FENCE /~ GA. ~~ '~% ~-~~~'''- • DIAGRAM ~~ ~' -~-° '--
FT. FT. HIGH FENCE GA. / ~ ~'/ ~C'~' ~ - ~~ ~
FT. RAZOR RIBBON
TERMINALS SIZ ~ ~ GA. -' ' • l~
TERMINALS SIZE ~ ~ GA. %%- t ~1
TERMINALS SIZE GA.
WALK QATES
WALK GATES
~DOUBLE/DRIVE ~~ ~ K
DOUBLE/DRNE
SLIDE GATE
SLIDE GATE
OTHER WORK
,r ': / f
~( `
~~
i
~ ~
K ~ ~
~ ~~~
r~
AMOUNT
~~
v ~ Y~
~~
r ~
41
,~
CONTRACT CONDITIONS
ACCEPTANCE: The above proposal when acxepted by the Campeny, at its mdn ofAc:e, bec~mmes a contract between TAX
two party and Is not aublect to cancellation, Silence on the pert of the Company afrell riot be construed ae an accept-
arrce of this proposal. Incase Paym~t Is not made as aPecffled in (Terms of Payment) tte Prq~Y ~'~ exPr~Y TOTAL
gives the Company or Its assignee the right to carne on Ms property to repossess e1 materlais used on tMa lob without
recourse, and the property owner further agrees to ea~pt all responaibfUty for any damages caused by this reposaessian. DOWN
ALL FENCE AND LABOR IS PROPERTY OF, VIKINQ FENCE CO., UNTIL PAID IN FULL. PAYMENT
AM work wip bs performed in • worknremlike manner ~ aocor~darrce wNh standard practlcs.
TOTAL BALANCE
~~~
ON COMPLETK)N
~ r~~ ~ r'r'_r: .
NOTICE*""We are not responsible for any damages to underground installations such as wiring, pipes, ubing,
conduits, drains or such unless location of such installations are plainly marked or staked off above ground as
to their exact location. Property owner is soley responsible for locating, staking and clearing fence lines.
TERMS: FULL PAYMENT ON COMPLETION OF JOB /Read Above Before Signing!
AccEI~TTEO
~~
i
'~~
~'~- ,~,f
EXCEL ~ENTITRES, lnc.
Bonding Requirements
Chem-Lawn Building UNLY
WiII, l told them they could bond for 1%3 of the total amount for the Chem-Lawn temporary
occupancy. Bob Renfro or Ja~ln Ambrose should be calling you if they need information.
Bid
Drainage Pond $ 3,592.00
Landscaping 15,340.50
Asphalt 91,800.00
Fencing 4 00
Total $115,977.50
3 $38,659.17
Letter of Credit @ 110% $42, 525. U8
Bond @ 120% X46,391.00
Letter of creditBond should state'`For completion of all drainage, landscaping, irrigation, paving,
striping, handicap accessibility, fencing, etc., as shown on approved plans."
Pf~se ter T~ know he can saga off the temporary occupancy once ~ rye the approved
shy. I have already done a cursory irton, so he just needs to go to the job shack in tl~e
frocrt .and, sign. off on tempoorary. He daes ncrt need to find pleas and the .
~~~5~~
,~
ti~
~~
~~
G~~~
G ,i
CITY OF MERIDIAN BUILDING DEP'T'.
TRANSMITTAL DATE : [ O~ d
PROJECT: ~~'/Pwf - ~AGUy( Z3~ ~~ ~GA.vr
~+~lc°+rC i q / S~~
PLEASE MAKE YOUR COMNf~ENTS OR CORRECTIONS TO THE BUILDING
DEPARTMENT BY ~~ ~d
ZONING ADMIN:
WATER DEPT.:
SEWER DEPT.:
FIRE DEPT.:
ENGINEERING:
~ro~e~
s~dw c~-~-%~
if!n^
~' s• alPw~~/~s ~~~u, ~~~~
' G'.~ QC~~SSi 6/~ s ~/~i
QLG.ess ~ - S/~ ~ ~'~/ ~ G
~G/~
r ~
~~~s~~~~
~ ~~oss P~.~~C S~
~~~G+n
~~~ ~~~~ ~~ r~
~~~ II ~%`~
r ~V ~p~ ~,~~- Gm`s no f s~•-~
P~~~CI~~'~~ ~Gi•a~Sc~C ~.~- .~°U'~
~D
e c~ ,~~~5 ~ 6~ ~e~f ~ dw;~:~
r~
~~
~~~ ~ ~
~~~r L~
~~ ~
~ ~ ~~„ shows ~~-~~ a~' ~o~
. ~~ ~~
,.~
u, ~~/ L~- 5 ~~ / .~~ lam' ~sc~~,~ 5 ~~~~/ ~~
~~ ~ ~ ~
~_,~ ~ f ~~
~~E'P 5
f l ~ /l~ ~~~ S~ar..~h
a~~ ~~°'~~ ~~
ss ~~ s ~~
~~ ~~~P
~~ ~
FI ~ ~ ~ ~~ s ~~~ ~ h
~ .~~~~~
~ ~~ ~ ~~
~ ~ ~'~°~5
~~-~ ~~~I
j ~0
~,~~~S~Gp' `~ ~d
~~~-~ ~ a
~e.~ ~~ ~ ~ /
~ ~ ~ ~~r~'~- ~ f Cdr s~i~~ ~ ~ ~ ~ ~ D' ~~-~i`v
~ ~~C~ ~ ~~
~~~ ~c ~ ~ ~ a / ~~~'~ ~~~
~ ~ ~' ~oG~d a ~
~~~af
~. ~ ~
~~
/.~ ~,~~
_~~~~~ s~
~-~ ~
~~ ~y~'`s
ate- gam- ~~ 3 ~-~~
~ S y aa~ ~ ~~~ - y~l