HomeMy WebLinkAboutBear Creek No. 6 FP 03-046MAYOR
RoeERTD. CoRR>E
COUNCn. MFTARFR4
WII.LL4M L.M. NARY
KEIrxBrnn
TAMMY DE WEERD
CI~RIfi MOCANDLESs
RURAL FntE ConuvnssioNFSCs
RICHARD GREENS
TERRY LEIGHTON
STEVEELLIOrr
CITY OP ~~!~
C~ri~ir~n
t{ IDAHO
KEN W. BOWERS
DEPUTY CIIIEF - FmR PREVENTION
JOSEPH SILV A
DEPUTY CHI - TRAIMNG
BII,L JOHNSON
540 East Franklin Road
Meridian, ID 83642
(208)888-1234
Fax (208) 895-0390
MERIDIAN CITY/RURAL FIRE DEPARTMENT
RECEIVED
August 21, 2003 AUG 2 1 2003
City Of Meridian
City Clerk Otlice
TO: Mayor, City Council & Meridian Planning & Zoning Commission
FROM: Joseph Silva, Deputy Chief, Fire Prevention
SUBJECT: Bear Creek No. 6 FP 03-046
The following will be the requirements and/or concerns to provide minimum levels of fire
protection for the proposed project:
1. That afire-flow of 1,000 gallons per minute be available to service the entire project.
Fve hydrants shall be placed an average of 500' apart. 1997 UFC Appendix III-A
2. Operational fire hydrants and temporary or permanent street signs are required
before combustible construction begins. UFC 901.4.2 &901.3
3. Acceptance of water supply for fire protection is contingem upon acceptance of the
water system by the City of Meridian for water quality.
4. All radii shall be 28' inside and 48' outside radius.
5. The proposed project lies outside the five-minute response zone goal. Achievement
of this goal is subject to budgetary constrairns and is imended to enhance the
probability of a favorable outcome on a request for Basic Life Support. The budget
constraints are typically defined as capital outlay for facilities that are located within
1.5 miles from a given location and sufficiem operational funds to staff the facilities.
6. According to a report completed by Fire & Emergency Services Consulting Group in
February of 2000 our requests for service are projected to reach 2800 in the year 2005
and 3800 by the year 2010, this is up from 2069 responses in the year 2000.
7. Any dead-end exceeding 150' in length as the result of a phasing process will require
an approved turn-around.
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
19 August, 2003
William Berg
City of Meridian
33 East Idaho Ave.
- i~Aeridiw~n, lD- 83642 - - - _
RE: FP03-046 Bear Creek No. 6
Dear Will:
Phones: Area Code 208
OFFICE: Nampa 466-7867
SHOP: Nampa 466-0663
~'~~~I~T~I)
AUG 2 2 2003
pity Of Meridian
City Clerk Office
Nampa & Meridian Irrigation District requires a Land Use Change Application be filed for
review prior to final platting. All laterals and waste ways must be protected. All
municipal surface drainage must be retained on site. If any surface drainage leaves the
site, the Nampa & Meridian Irrigation District must review drainage plans. Please
contact Donna Moore at 466-7861 for further information.
The developer must comply with Idaho Code 31-3805. It is recommended that irrigation
water be made available to all developments within the Nampa & Meridian Irrigation
District.
Thank you,
~~~
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: Water Superintendent
Steve Arnold, Briggs Eng.
File -Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CENTRAL
•• DISTRICT
HEALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
Environmental Health Division ^ Boise
^ Eagle
Preliminary /Final /Short Plat
^ 1. We have No Objections to this Proposal.
^ Garden City
Meridian
^ Kuna
^ ACZ
^ Star
AUG 19 2003
^ 2. We recommend Denial of this Proposal.
City Of Meridian
-^ 3: Specific knowledge as tathe-exaottype of asemust-beprovicted-before~me carrcomment ~~ai --
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ or bedrock from original grade ^ other
^ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
^ 8. After written approval from appropriate entities are submitted, we can approve this proposal far:
^ central sewage ^ community sewage system ^ community water well
^ interim sewage ^ central water
^ individual sewage ^ individual water
^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of Environmental Quality:
^ central sewage ^ community sewage system ^ community water
^ sewage dry lines ^ central water
^ 10. Run-off is not to create a mosquito breeding problem.
^ 11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 13. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas
^ beverage establishment ^ grocery store
^ 14.
~5.
^ child care center
Date:~~l~l~
Reviewed By: a^~J'"~bd~
Review Sheet
CDH09N0Ikc
Please see attached stormwater management recommendatations
YO CI~P
ROBERT D. CORR[E KEN W. BOWERS
COUNCE. MEbIDERS ~ DEPUTY CHIEF - FIRP. PREVENTION
WII.LL4M L.M. NARY JOSEPH SILVA
KEITH BII1D ~ DEPUTY CHIEF - TRARdING
TAMMY DE wEERD CITY OP
Bna JOHNSON
CHERaI McCnNDLESS py
~
~
RURAL FIRE COMMISSIONERS V / l
l~
~ 540 Fas[ F[anklin Road
Rtcxaxn GREHNE 1°~ Mr3idim~, ID 83642
TERRY LEIGHTON ~C (208) 888-1234
STEVEELL[oTr s•'r. -,,.w ~~ Fax (208) 895A390
MERIDIAN CITY/RURAL FIRE DEPARTMENT
R~CENE
August 21, 2003
AUG 21 2003
City Of Meridian
City Clerk Office
TO: Mayor, City Council & Meridian Planning & Zoning Commission
FROM: Joseph Silva, Deputy Chief, Fire Prevention
SUBJECT: Bear CreekNo. 6 FP 03-046
The following will be the requirements and/or concerns to provide minimum levels of fire
protection for the proposed project:
1. That afire-flow of 1,000 gallons per minute be available to service the entire project.
Fire hydrants shall be placed an average of 500' apart. 1997 UFC Appendix III-A
2. Operational fire hydrants and temporary or permanent street signs are required
before combustible construction begins. UFC 901.4.2 & 901.3
3. Acceptance of water supply for fire protection is contingent upon acceptance of the
water system by the City of Meridian for water quality.
4. All radii shall be 28' inside and 48' outside radius.
5. The proposed project lies outside the five-mimrte response zone goal. Achievement
of this goal is subject to budgetary constraints and is intended to enhance the
probability of a favorable outcome on a request for Basic Life Support. The budget
constraints are typically defined as capital outlay for facilities that are located within
1.5 miles from a given location and sufficiem operational funds to staff the facilities.
6. According to a report completed by Fire & Emergency Services Consulting Group in
February of 2000 our requests for service are projected to reach 2800 in the year 2005
and 3800 by the year 2010, this is up from 2069 responses in the year 2000.
7. Any dead-end exceeding 150' in length as the result of a phasing process will require
an approved turn-around.
~ & 71 ~~~,~ I~ut>~iict
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
19 August, 2003
William Berg
City of Meridian
33 East Idaho Ave.
-- Msrid4an,-ID-83642- -
RE: FP03-046 Bear Creek No. 6
Dear Will:
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
-d1.8,~d.~34J.A_~i.9- V ~1 ~
AUG 2 2 2003
City Of Meridian
City C]erk Office
Nampa & Meridian Irrigation District requires a Land Use Change Application be filed for
review prior to final platting. All laterals and waste ways must be protected. All
municipal surface drainage must be retained on site. If any surface drainage leaves the
site, the Nampa & Meridian Irrigation District must review drainage plans. Please
contact Donna Moore at 486-7861 for further information.
The developer must comply with Idaho Code 31-3805. It is recommended that irrigation
water be made available to all developments within the Nampa & Meridian Irrigation
District.
Thank you,
~~~~
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
C: Water Superintendent
Steve Arnold, Briggs Eng.
File -Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT
.. DISTRICT Return to:
C HEALTH Environmental Health Division ^ Boise
DEPARTMENT
^ Eagle
Rezone # ^ Garden City
Conditional Use # ~ivleridian
Preliminary /Final /Short Plat >~P ~3 -Q~-/~ ^ Kuna
~Paf ~r~lt -~~ ^ACZ
^ Star
^ 1. We have No Objections to this Proposal.
AUG 19 2003
^ 2. We recommend Denial of this Proposal.
City Of Meridian
-° _---- -^ 3- Specific knovuledge as tmthe exaet-tgpesfvs we can comment o~~ --- -
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ or bedrock from original grade ^ other
^ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
^ 8. After written approval from appropriate entities are submitted, we can approve this proposal for:
^ central sewage ^ community sewage system ^ community water well
^ interim sewage ^ central water
^ individual sewage ^ individual water
^ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of Environmental Quality:
^ central sewage ^ community sewage system ^ community water
^ sewage dry lines ^ central water
^ 10. Run-off is not to create a mosquito breeding problem.
^ 11. This Depanment would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 13. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
^ 14. Please see attached storm,/water managem/e~nt recomm""e~/ndat/ations Date: ~ILI~
~5. C~Is~O ~: c wed ~~ ~.~-.~ ,~/ra` Reviewed By: _ ~k~~~~'~=6"'~
Review Sheet
coHC s~os i~
MAYOR
Rober[ D. Conie
CITY COUNCIL MEMBERS
Tammy de Weerd
William L. M. Nary
Cherie McCandless
Keith Bird
.>e ~~.
P `fig l•
r_=„@y~
~.~Vl eY1G~IG~YI ~:~""
Il IDAHO
LEGAL DEPARTMENT
(208) 466-9272 • FAX 466-4405
PARKS & RECREATION
(208) 688-3579 • Fax 898-5501
PUBLIC WORKS
(208) 898-5500 • Fax 887-1297
BUILDING DEPARTMENT
(206) 887-2211 • Fax 887-1297
PLANNING & ZONING
(208) 884-5533 • Fax 888-6854
TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS
WITH THE CITY OF MERIDIAN
To insure that your comments and recommendations will be considered by the Meridian City
Council please submit your comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by: August 26, 2003
Transmittal Date: August 7, 2003 Hearing Date:
File No.: FP 03-046
Request: Final Plat appro~
R-8 zone for Bea
By: Bear Creek, LLC
Location of Property or Project:
of 31 building lots and 2 other lots on 10.49 acres in an
6
west of Meridian Road and south of Overland Road
David Zaremba, P/Z p+o vaa, vaG r-r~
Jerry Centers, P2 rNO vaq vac FaI
Leslie Mathes, P!Z rNO vaa, vac, r-rI
Michael Rohm, P/Z ravovaa, vacFnl
Keith Borup, P/Z mw vat vac rmi
Robert Corrie, Mayor
Bill Nary, C/C
Tammy deWeerd, C/C
Keith Bird, C/C
Cherie McCandless, C/C
Water Department
Sewer Department
Sanitary Service rroovaR, vac Fri
Building Department
Fire Department
Police Department
City Attorney
City Engineer
City Planner
Parks Department
Your Concise Remarks:
2003
Meridian School District rnmFrl
Meridian Post Office rFamvoarrl
Ada County Highway District
Ada County Development Services
Central Distdct Health
Nampa Meridian Irrig. District
Settlers Irrigation District
Idaho Power Co. (Faiavomrl
U. S. West (FP/PPOnIy)
Intermountain Gasrrrmvo,~ryl
Bureau of Reclamation rr~ianmur!
Idaho Transportation Department rNOr-~
Ada County raz onHl
Ada County Assess. Land Records tw~vr onryl
Meridian Development Corporation
Historical Preservation Commission
RECEIVED
AUG 1 1 10D3
City of Meridian
City Clerk Office
33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433
City Clerk Ottice Fax (208) 888-4218 Human Resources Fax (208) 8848723 Finance & Utility Billing Fax (208) 887-4813
AY
Rob t D. orrie
CITY CO L MEMBERS
Tammy de Weerd
William L. M. Nary
Ch ~ McCandless
r
~a
,~.
~a.. n
CITY OF ~~~~~ .k
C~ri~icn ~%
tl IDAHO
LEGAL DEPARTMENT
(208) 4GG-9272 • FAX 4GG-4405
PARKS & RECREATION
(208) 888-3579 • Fax 898-5501
PUBLIC WORKS
(208) 898-5500 • Fax 887-1297
BUILDING DEPARTMENT
(208) 887-2211 • Fax 887-1297
ene ~E~
~"aa•T ti5 RE V// , I ante PLANNING & ZONING
Kei[h Bird ~~ Itaoa (208) 884-5533 • Fax 888-6854
TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS
WITH THE CITY OF MERIDIAN
To insure that your comments and recommendations will be considered by the Meridian City
Council please submit your comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by: August Lt
Transmittal Date: August 7, 2003
File Na.: FP 03-046
Request: Final Plat approval of 31 build
R-8 zone for Bear Creek No. 6
2003
Hearing Date:
lots and 2 other lots on
acres in an
sy: Bear Creek, LLC
Location of Property or Projed: west of Meridian Road and south of Overland Road
David Zaremba, P/Z Movartvac,rw/
Jerry Centers, P/Z Mo vus vnc, r~~
Leslie Mathes, P/Z Movu+,vxtc,w)
Michael Rohm, P/Z p~uvu+,v~Grr)
Keith Borup, P/Z rwovars,vne,w~
Robert Come, Mayor
Bill Nary, C/C
Tam y deWeerd, C/C
K ' Bird, C/C
erie McCandless, C/C
Water Department
Sewer Department
Sanitary Service ao vw, vt0. r~
Building Department
Fire Department
Police Department
City Attorney Your
City Engineer
City Planner
Parks Department
Meridian School Distrid rr+aF~
Meridian Post Office (Fwarorlal
Ada County Highway Distrid
Ada County Development Services
Central Distrid Health
Nampa Meridian Irrig. Distrid
Settlers Irrigation Distrid
Idaho Power Co. r~~
U.S. West (Fgar«nq
Intermountain GaS rFwPP Onry9
Bureau of Reclamation tFa~a~•Rm
Idaho Transportation Department m•F~
Ada County wz«~m
Ada County Assess. Land Records (Fgvv om»
Meridian Development Corporation
uldnriral Preservation Commission
RECEIVED
AUG 112003
City of Meridian
City Clerk Office
2003
33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433
City Clerk Office Fax (208) 888-4218 Human Resources Fax (208) 884-8723 Finance & Utility Billing Fax (208) 887-4813
MAYOR
Robert D. Corrie
CITY COUNCIL MEMBERS
Tammy de Weerd
William L. M. Nary
Cherie McCandless
Keith Bird
To insure that your comments and recommendations will be considered by the Meridian City
Council please submit your comments and recommendations to Meridian City Hall
TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS
WITH THE CITY OF MERIDIAN
Attn: Will Berg, City Clerk, by: August 2
Transmittal Date: August 7, 2003
File No.: FP 03-046
~,~,d;'
~1~.._P" ... (N
CITY OF j.;4 ~lit~i_~ `.'
C~ri~i~€nW -
ti IDAHO
LEGAL DEPARTMENT
(208) 466-9272 • FAX 4GG-4405
PARKS & RECREATION
(208) B88-3579 • Fax 898-550!
PUBLIC WORKS
(208) 898-5500 •Faz 887-1297
BUILDING DEPARTMENT
(208) 887-2211 •Faz 887-1297
PLANNING & ZONING
(208) 884-5533 • Fax 888-6854
2003
Hearing Date:
2003
Request: Final Plat approval of 31 bui
R-8 zone for Bear Creek No.
By:
lots and 2 other lots on 10.49 acres in an
LLC
Location of Property or Project: west Of Meridian Road and south
David Zaremba, PIZ Mo vaa, vac, rr7
Jerry Centers, P/Z (rro vaa, vac, F~
Leslie Mathes, P/Z Mu vaR Vac, r~pl
Michael Rohm, P/Z Mo vars, vac, r49
Keith Borup, PIZ Mo vars, vac. ~
Robert Come, Mayor
Bill Nary, C/C
Tammy deWeerd, C/C
Keith B' ; C/C
Ch McCandless, C/C
ter Department
Sewer Department
Sanitary Service raovars,vac,F~
Building Department
Fin: Department
Police Department
City Attorney
City Engineer
City Planner
Parks Department
,~~E~
..
Meridian School District r~~
Meridian Post Office ra~vPO„~.~
Ada County Highway District
Ada County Development Services
Central District Health
Nampa Meridian Irrig. District
Settlers Irrigation District
Idaho Power Co. tFwrv~~
U.S. West rFViaa nnry)
Intermountain GaS(!<viarw,ry9
Bureau of Reclamation rFwarwy)
Idaho Transportation Department Mom
Ada County raz and
Ada County Assess. Land Records rwmr ony)
Meridian Development Corporation
RECEIVET~
Alo'"a ~ t ~~n~
C;~~ ~'?~.~",'~d city ut n ~ ~~
`g City C' - .,,iTice
33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433
City Clerk Office Fax (208) 888-4218 Human Resources Fax (208) 884-8723 Finance & Utility Billing Fax (208) 887-4813
Historical Preservation Commission