Loading...
HomeMy WebLinkAboutTask Order No. 10060B with Brown & Caldwell for Reclaimed Water Booster Station and Reservoir ProjectGnU 1{sttit Rinrp:u-k Lane, Suite 3111 Rlasc, l~xho 8.;7DG fcl: ZIIR-33G 134U Pas: 2f IR- 3i~3-(IH25 ++ a•o•.bru+rnandtaldmcll.com ~~E IDIZ IAN;- ~J PURCHASING AGENT 33 E. Broadway Ave, Meridian,, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER N0.10060B Between CITY OF MERIDIAN AND BROWN AND CALDWELL This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated December 12, 2006. Reclaimed Water Booster Station and Reservoir Project On-Call City Representative services Task Order 100fi0B SCOPE OF WQRK 'Task 1 -- On Call Serviices This is an open Task to be used at the City's discretion, but will generally involve the following work: • attend the pre-proposal meeting; • answer questions in writing during the proposal period; 1lssist City in procurement ofDesign-Build Contractor including written technical comment on proposal substantiation package; • Review and provide written comment an design substantiation packages; • Re~rie~v and provide written comment on construction substantiation packages; • Attend weekly meetings with llesign-Builder; • Assist City with startup and commissioning; • Review and provide tx~ritten comment on (;hinge orders and pay requests. ~: ~. i` Y 9 Il 7i J! i .! i 1: t; 1l 1- - ~ r - a +i ,. , , i7 f f ~ ', t • 600 East Riverpark Lane, Suite 210 Boise, Idaho 83706 Tel: 208-336-1340 Fax:208-344-0825 www.brownandcald~vell.com a7CriE The On-call tasks will be on an as-needed basis as determined by the City during the Design-Build process generally between December, 2009 and May, 2010. FEE ESTIMATE The following table provides a summary fee estimate for the scope of services proposed in this task order. The fee estimate is based on the assumptions developed from our conversations with City staff. These assumptions are presented in the following section. Brown and Caldwell proposes conducting this work on atime-and-materials basis with a multiplier of 3.2 applied to our direct labor rates and a 10 percent mark-up.on materials and supplies used as part of this effort. On-call Sendces ~ $24,000 ASSUMPTIONS The following assumptions were made in preparation of the scope of work and fee estimate: ® The cost presented in the fee table is on atime-and-materials basis, not to exceed $24,000. When the budget is 80% spent, Brown and Caldwell will notify the City and mutually decide on requirements for additional funds, if needed. CITY OF MERIDIAN BROWN AND CALDWELL ,: TAMMY de WE ,MAYOR BY: Jeffre o n on Dated: 1- i a - a0 ! l7 Dated: ~ 2~2G ~~ Approved by City Council: ~~~ {~,,,~ ., O ~ Attest: ;~~~\ ~~ oapp~ ~®®~~ ~~'/''i O JAYCEE HOLMAN, CITY CLERIf ~~~~ -9G ~~ _Q Approved as to Conte ~%, -~ ~LST ts'~ KEIT ATTS, PURCHASIN AGENT ~ii~iinn~~~-~` Dated: / ~ ~~ ~ ` Approval TITLE: r!~s;s+~ C.~ EnQ;n~~ Dated: ~ Z~z~~9 E n v i r o fr nz e ra t a l E n ~; i n e e r ~~ E~ C o ~a ,r u l t o n t .r