ARTICLE 1. SCOPE OF SERVICES
ENGINEER will perform the Scope of Services set forth
in Attachment A.
ARTICLE 2. COMPENSATION
OWNER will compensate ENGINEER as set forth in
Attachment B. Work performed under this
AGREEMENT may be performed using labor from
affiliated companies of ENGINEER. Such labor will be
billed to OWNER under the same billing terms
applicable to ENGINEER's employees.
ARTICLE 3. TERMS OF PAYMENT
OWNER will pay ENGINEER as follows:
3.1 Invoices and Time of Payment
ENGINEER will issue monthly invoices pursuant to
Attachment B. Invoices are due and payable within 30
days of receipt.
3.2 Interest
3.2.1 OWNER will be charged interest at the rate of
1-1/2% per month, or that permitted by law if lesser, on
all past-due amounts starting 30 days after receipt of
invoice. Payments will first be credited to interest and
then to principal.
3.2.2 In the event of a disputed billing, only the
disputed portion will be withheld from payment, and
OWNER shall pay the undisputed portion. OWNER will
exercise reasonableness in disputing any bill or portion
thereof. No interest will accrue on any disputed portion
of the billing until mutually resolved.
3.2.3 If OWNER fails to make payment in full within
30 days of the date due for any undisputed billing,
ENGINEER may, after giving 7 days' written notice to
OWNER, suspend services under this AGREEMENT
until paid in full, including interest. In the event of
suspension of services, ENGINEER will have no liability
to OWNER for delays or damages caused by OWNER
because of such suspension.
ARTICLE 4.OBLIGATIONS OF ENGINEER
4.1 Standard of Care
The standard of care applicable to ENGINEER'S
Services will be the degree of skill and diligence
normally employed by professional engineers or
consultants performing the same or similar Services at
the time said services are performed. ENGINEER will
reperform any services not meeting this standard
without additional compensation.
4.2 Subsurface Investigations
In soils, foundation, groundwater, and other subsurface
investigations, the actual characteristics may vary
significantly between successive test points and sample
intervals and at locations other than where
observations, exploration, and investigations have been
made. Because of the inherent uncertainties in
subsurface evaluations, changed or unanticipated
underground conditions may occur that could affect total
PROJECT cost and/or execution. These conditions and
cosUexecution effects are not the responsibility of
ENGINEER.
4.3 ENGINEER'S Personnel at Construction Site
4.3.1 The presence or duties of ENGINEER'S
personnel at a construction site, whether as onsite
representatives or otherwise, do not make ENGINEER
or ENGINEER's personnel in any way responsible for
those duties that belong to OWNER and/or the
construction contractors or other entities, and do not
relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including,
but not limited to, all construction methods, means,
techniques, sequences, and procedures necessary for
coordinating and completing all portions of the
construction work in accordance with the construction
Contract Documents and any health or safety
precautions required by such construction work.
4.3.2 ENGINEER and ENGINEER'S personnel have
no authority to exercise any control over any
construction contractor or other entity or their
employees in connection with their work or any health or
safety precautions and have no duty for inspecting,
noting, observing, correcting, or reporting on health or
safety deficiencies of the construction contractor(s) or
other entity or any other persons at the site except
ENGINEER's own personnel.
4.3.3 The presence of ENGINEER's personnel at a
construction site is for the purpose of providing to
OWNER a greater degree of confidence that the
completed construction work will conform generally to
the construction documents and that the integrity of the
design concept as reflected in the construction
documents has been implemented and preserved by the
construction contractor(s). ENGINEER neither
guarantees the performance of the construction
contractor(s) nor assumes responsibility for construction
contractor's failure to perform work in accordance with
the construction documents.
FORM 398
REVISED 12199
For this AGREEMENT only, construction sites include
places of manufacture for materials incorporated into
the construction work, and construction contractors
include manufacturers of materials incorporated into the
construction work.
4.4 Opinions of Cost, Financial Considerations, and
Schedules
In providing opinions of cost, financial analyses,
economic feasibility projections, and schedules for the
PROJECT, ENGINEER has no control over cost or price
of labor and materials; unknown or latent conditions of
existing equipment or structures that may affect
operation or maintenance costs; competitive bidding
procedures and market conditions; time or quality of
performance by operating personnel or third parties; and
other economic and operational factors that may
materially affect the ultimate PROJECT cost or
schedule. Therefore, ENGINEER makes no warranty
that OWNER's actual PROJECT costs, financial
aspects, economic feasibility, or schedules will not vary
from ENGINEER's opinions, analyses, projections, or
estimates.
If OWNER wishes greater assurance as to any element
of PROJECT cost, feasibility, or schedule, OWNER will
employ an independent cost estimator, contractor, or
other appropriate advisor.
4.5 Construction Progress Payments
Recommendations by ENGINEER to OWNER for
periodic construction progress payments to the
construction contractor(s) will be based on ENGINEER's
knowledge, information, and belief from selective
sampling that the work has progressed to the point
indicated. Such recommendations do not represent that
continuous or detailed examinations have been made
by ENGINEER to ascertain that the construction
contractor(s) have completed the work in exact
accordance with the construction documents; that the
final work will be acceptable in all respects; that
ENGINEER has made an examination to ascertain how
or for what purpose the construction contractor(s) have
used the moneys paid; that title to any of the work,
materials, or equipment has passed to OWNER free
and clear of liens, claims, security interests, or
encumbrances; or that there are not other matters at
issue between OWNER and the construction
contractors that affect the amount that should be paid.
4.6 Record Drawings
Record drawings, if required, will be prepared, in part,
on the basis of information compiled and furnished by
others, and may not always represent the exact
location, type of various components, or exact manner
in which the PROJECT was finally constructed.
ENGINEER is not responsible for any errors or
omissions in the information from others that is
incorporated into the record drawings.
4.7 Access to ENGINEER's Accounting Records
ENGINEER will maintain accounting records, in
accordance with generally accepted accounting
principles. These records will be available to OWNER
during ENGINEER's normal business hours for a period
of 1 year after ENGINEER'S final invoice for examination
to the extent required to verify the direct costs
(excluding established or standard allowances and
rates) incurred hereunder. OWNER may only audit
accounting records applicable to acost-reimbursable
type compensation.
4.8 ENGINEER's Insurance
ENGINEER will maintain throughout this AGREEMENT
the following insurance:
(a) Worker's compensation and employer's liability
insurance as required by the state where the work is
performed.
(b) Comprehensive automobile and vehicle liability
insurance covering claims for injuries to members of the
public and/or damages to property of others arising from
use of motor vehicles, including onsite and offsite
operations, and owned, nonowned, or hired vehicles,
with $1,000,000 combined single limits.
(c) Commercial general liability insurance covering
claims for injuries to members of the public or damage
to property of others arising out of any covered
negligent act or omission of ENGINEER or of any of its
employees, agents, or subcontractors, with $1,000,000
per occurrence and in the aggregate.
(d) Professional liability insurance of $1,000,000
per occurrence and in the aggregate.
(e) OWNER will be named as an additional
insured with respect to ENGINEER's liabilities
hereunder in insurance coverages identified in items (b)
and (c) and ENGINEER waives subrogation against
OWNER as to said policies.
ARTICLE 5.OBLIGATIONS OF OWNER
5.1 OWNER-Furnished Data
OWNER will provide to ENGINEER all data in
OWNER's possession relating to ENGINEER's services
on the PROJECT. ENGINEER will reasonably rely upon
the accuracy, timeliness, and completeness of the
information provided by OWNER.
5.2 Access to Facilities and Property
OWNER will make its facilities accessible to ENGINEER
as required for ENGINEER's performance of its services
and will provide labor and safety equipment as required
by ENGINEER for such access. OWNER will perform, at
no cost to ENGINEER, such tests of equipment,
machinery, pipelines, and other components of
OWNER's facilities as may be required in connection
with ENGINEER's services.
5.3 Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services,
OWNER will obtain, arrange, and pay for all
advertisements for bids; permits and licenses required
by local, state, or federal authorities; and land,
easements, rights-of-way, and access necessary for
ENGINEER's services or PROJECT construction.
5.4 Timely Review
OWNER will examine ENGINEER's studies, reports,
sketches, drawings, specifications, proposals, and other
documents; obtain advice of an attorney, insurance
counselor, accountant, auditor, bond and financial
advisors, and other consultants as OWNER deems
appropriate; and render in writing decisions required by
OWNER in a timely manner.
5.5 Prompt Notice
OWNER will give prompt written notice to ENGINEER
whenever OWNER observes or becomes aware of any
FORM 398
REVISED 12199
development that affects the scope or timing of
ENGINEER's Services, or of any defect in the work of
ENGINEER or construction contractors.
5.6 Asbestos or Hazardous Substances
5.6.1 If asbestos or hazardous substances in any
form are encountered or suspected, ENGINEER will
stop its own work in the affected portions of the
PROJECT to permit testing and evaluation.
5.6.2 If asbestos is suspected, ENGINEER will, if
requested, manage the asbestos remediation activities
using a qualified subcontractor at an additional fee and
contract terms to be negotiated.
5.6.3 If hazardous substances other than asbestos are
suspected, ENGINEER will, if requested, conduct
tests to determine the extent of the problem and will
perform the necessary studies and recommend the
necessary remedial measures at an additional fee
and contract terms to be negotiated.
5.6.4 Client recognizes that CH2M HILL assumes no
risk and/or liability for a waste or hazardous waste
site orignated by other than CH2M HILL.
5.7 Contractor Indemnification and Claims
5.7.1 OWNER agrees to include in all construction
contracts the provisions of Article 4.3, ENGINEER'
Personnel at Construction Site, and provisions providing
contractor indemnification of OWNER and ENGINEER
for contractor's negligence.
5.7.2 OWNER shall require construction
contractor(s) to name OWNER and ENGINEER as
additional insureds on the contractor's general liability
insurance policy.
5.7.3 OWNER agrees to include the following clause
in all contracts with construction contractors, and
equipment or materials suppliers:
Contractors, subcontractors, and equipment and
material suppliers on the PROJECT, or their sureties,
shall maintain no direct action against ENGINEER,
ENGINEER's officers, employees, affiliated
corporations, and subcontractors for any claim arising
out of, in connection with, or resulting from the
engineering services performed. OWNER will be the
only beneficiary of any undertaking by ENGINEER."
5.8 OWNER'S Insurance
5.8.1 OWNER will maintain property insurance on all
pre-existing physical facilities associated in any way
with the PROJECT.
5.8.2 OWNER will provide for a waiver of
subrogation as to all OWNER-carried property damage
insurance, during construction and thereafter, in favor of
ENGINEER, ENGINEER's officers, employees,
affiliates, and subcontractors.
5.8.3 OWNER will provide (or have the construction
contractor(s) provide) a Builders Risk All Risk insurance
policy for the full replacement value of all PROJECT
work including the value of all onsite OWNER-furnished
equipment and/or materials associated with
ENGINEER's services. Such policy will include
coverage for loss due to defects in materials and
workmanship and errors in design, and will provide a
waiver of subrogation as to ENGINEER and the
construction contractor(s) (or OWNER), and their
respective officers, employees, agents, affiliates, and
subcontractors. OWNER will provide ENGINEER a copy
of such policy.
5.9 Litigation Assistance
The Scope of Services does not include costs of
ENGINEER for required or requested assistance to
support, prepare, document, bring, defend, or assist in
litigation undertaken or defended by OWNER. All such
Services required or requested of ENGINEER by
OWNER, except for suits or claims between the parties
to this AGREEMENT, will be reimbursed as mutually
agreed.
5.10Changes
OWNER may make or approve changes within the
general Scope of Services in this AGREEMENT. If such
changes affect ENGINEER's cost of or time required for
performance of the services, an equitable adjustment
will be made through an amendment to this.
AGREEMENT.
ARTICLE 6. GENERAL LEGAL PROVISIONS
6.1 Authorization to Proceed
Execution of this AGREEMENT by OWNER will be
authorization for ENGINEER to proceed with the work,
unless otherwise provided for in this AGREEMENT.
6.2 Reuse of PROJECT Documents
All reports, drawings, specifications, documents, and
other deliverables of ENGINEER, whether in hard copy
or in electronic form, are instruments of service for this
PROJECT, whether the PROJECT is completed or not.
OWNER agrees to indemnify ENGINEER and
ENGINEER'S officers, employees, subcontractors, and
affiliated corporations from all claims, damages, losses,
and costs, including, but not limited to, litigation
expenses and attorney's fees arising out of or related to
the unauthorized reuse, change or alteration of these
PROJECT documents.
6.3 Force Majeure
ENGINEER is not responsible for damages or delay in
performance caused by acts of God, strikes, lockouts,
accidents, or other events beyond the control of.
ENGINEER. In any such event, ENGINEER'S contract
price and schedule shall be equitably adjusted.
6.4 Limitation of Liability
6.4.1 To the maximum extent permitted by law,
ENGINEER's liability for OWNER's damages will not, in
the aggregate, exceed $1,000,000.
6.4.2 This article takes precedence over any
conflicting article of this AGREEMENT or any document
incorporated into it or referenced by it.
6.4.3 This limitation of liability will apply whether
ENGINEER's liability arises under breach of contract or
warranty; tort; including negligence; strict liability;
statutory liability; or any other cause of action, and shall
include ENGINEER's officers, affiliated corporations,
employees, and subcontractors.
6.5 Termination
6.5.1 This AGREEMENT may be terminated for
convenience on 30 days' written notice, or for cause if
either party fails substantially to perform through no fault
of the other and does not commence correction of such
nonperformance within 5 days of written notice and
diligently complete the correction thereafter.
FORM 398
REVISED 12199
6.5.2 On termination, ENGINEER will be paid for all
authorized services performed up to the termination
date plus termination expenses, such as, but not limited
to, reassignment of personnel, subcontract termination
costs, and related closeout costs.
6.6 Suspension, Delay, or Interruption of Work
OWNER may suspend, delay, or interrupt the Services
of ENGINEER for the convenience of OWNER. In such
event, ENGINEER's contract price and schedule shall
be equitably adjusted.
6.7 No Third-Party Beneficiaries
This AGREEMENT gives no rights or benefits to anyone
other than OWNER and ENGINEER and has no third-
party beneficiaries.
6.8 Indemnification
6.8.1 ENGINEER.agrees to indemnify OWNER for
any claims, damages, losses, and costs, including, but
not limited to, attorney's fees and litigation costs, arising
out of claims by third parties for property damage or
bodily injury, including death, to the proportionate extent
caused by the negligence or willful misconduct of
ENGINEER, ENGINEER's employees, affiliated
corporations, and subcontractors in connection with the
PROJECT.
6.8.2 OWNER agrees to indemnify ENGINEER from
any claims, damages, losses, and costs, including, but
not limited to, attorney's fees and litigation costs, arising
out of claims by third parties for property damage or
bodily injury, including death, to the proportionate extent
caused by the negligence or willful misconduct of
OWNER, or its employees or contractors in connection
with the PROJECT.
6.9 Assignment
This is a bilateral personal Services AGREEMENT.
Neither party shall have the power to or will assign any
of the duties or rights or any claim arising out of or
related to this AGREEMENT, whether arising in tort,
contract or otherwise, without the written consent of the
other party. Any unauthorized assignment is void and
unenforceable. These conditions and the entire
AGREEMENT are binding on the heirs, successors, and
assigns of the parties hereto.
FORM 398
REVISED 12199
6.11 Waiver
OWNER waives all claims against ENGINEER,
including those for latent defects, that are not brought
within 2 years of substantial completion of the facility
designed or final payment to ENGINEER, whichever is
earlier.
6.12Jurisdiction
The substantive law of the state of the PROJECT site
shall govern the validity of this AGREEMENT, its
interpretation and performance, and any other claims
related to it.
6.13Severability and Survival
6.13.1 If any of the Provisions contained in this
AGREEMENT are held for any reason to be invalid,
illegal, or unenforceable, the enforceability of the
remaining provisions shall not be impaired thereby.
6.13.2 Limitations of liability, indemnities, and other
express representations shall survive termination of this
AGREEMENT for any cause.
6.14 Materials and Samples
Any items, substances, materials, or samples removed
from the PROJECT site for testing, analysis, or other
evaluation will be returned to the PROJECT site within
60 days of PROJECT close-out unless agreed to
otherwise. OWNER recognizes and agrees that
ENGINEER is acting as a bailee and at no time
assumes title to said items, substances, materials, or
samples.
6.15Engineer's Deliverables
Engineer's deliverables, including record drawings, are
limited to the sealed and signed hard copies. Computer-
generated drawing files furnished by ENGINEER are for
OWNER or others' convenience. Any conclusions or
information derived or obtained from these files will be
at user's sole risk.
6.16 Dispute Resolution
The parties will use their best efforts to resolve amicably
any dispute, including use of alternative dispute
resolution options.
ARTICLE 7. ATTACHMENTS, SCHEDULES, AND
SIGNATURES
This AGREEMENT, including its attachments and
schedules, constitutes the entire AGREEMENT,
supersedes all prior written or oral understandings, and
may only be changed by a written amendment executed
by both parties. The following attachments and
schedules are hereby made a part of this
AGREEMENT:
Attachment A--Scope of Services
Attachment B--Compensation
IN WITNESS WHEREOF, the parties execute below:
For OWNER, City of Meridian, Idaho
dated this day of N ~ ve!'Y1bQY ~ 'l ~a
Signature ~;;~ , " ~ Signature
Name (printed) ~ Q/r ~ hI'/L j Name (printed) ~%`~/LQlT1
Title ~ Q~Or' Title L%T[,
~~
For ENGINEER, CH2M HILL INC.,
dated this `~ day of ~~,~ ,~
Signature ~~/,~j~~~jb'~/`~" Signature
Name (printed) ~~?jA~ Name (printed)
Title /IXf~ ~ihYAf.~2 Title
. ~~ `~ Tr-
L..,~UNtllil/r,,,
~'
j~ W
T 1~ • ~ `~C' ;"`
.+".
~~~( be
.. ~~/f~ ~ ~._.aR,r
FORM 398
5
REVISED 12199
ATTACHMENT A - SCOPE OF SERVICES
This attachment is to the AGREEMENT between CH2M HILL, INC., ("ENGINEER"), and
City of Meridian. Idaho ("OWNER"), for a PROJECT generally described as: Meridian Tank Painting Project.
ARTICLE 1. SCOPE OF SERVICES
ENGINEER agrees to furnish OWNER the following specific services:
See attached SCOPE OF SERVICES.
Form 398A
REVISED: 7/97
City of Meridian
Meridian Tank Painting Project
SCOPE OF SERVICES
Provide the following:
1. Design Services
a) Review previous coating inspection reports for the tank and develop
recommendations for interior and exterior painting systems to repaint
the tank. Recommendations will be summarized in a letter report to the
CITY. We have assumed the CITY will maintain the same Color Scheme
and lettering and no time or budget has been included to develop
alternate color schemes or public involvement issues.
h) Review results of paint chip testing for the interior and exterior of the
tank. The City will submit paint chips obtained front the interior and exterior of
the tank to a local lab to test for lead content. Paint chips will be collected by the
CITY.
c) Prepare a Contract Document, to competitively bid the re-coating of the
tank. The Document will include Bidding Requirements, Contract Forms,
Conditions of the Contract, Technical Specifications, and Drawings.
d) Prepare an opinion of cost to re-coat the tank.
e) Meet with the CITY to review the Contract Document requirements at
the start of the design process and at the completion of the design.
f) Design Services are for coatings improvements only and do not include
structural improvements or upgrades to the existing tank and its
s~~stems.
2. Bid Period Services
a) Assist the City in preparing addenda to interpret, clarify, or expand the
Bidding Documents. The Citt~ will print and bind the final Contract
Document and provide document mailing and pre-bid services, such as
preparation of advertisements, distribution of plan-holders lists, and issuing of
addenda.
h) Review results of the Contractor pre-qualification process and provide
continents to the City. The City will receive and c:orrtpile the Co~ntracto~r pre-
qu.alification submittals fi~om~ interested Contractors and ~notifi~ Co~nt~r~actors of
the results.
SCOPE"I.DDC
c) The City will attend and coordinate a pre-bid rneeti~ng with interested
Contractors and the CITY at the project site.
d) Assist the CITY in reviewing construction proposals. TI2e City will receive
the proposals, prepare bid tabulation sheets and award tJ~ie Contract fo~r~
co~nstr~uction.
e) Assist the City in preparing four sets of Contract Documents from the
successful Contractor's proposal/submittal for execution by the CITY
and Contractor. The Citp will coordinate execution of the Contract with t11.e
Contractor.
3. Services During Construction
a) Attend and coordinate apre-construction meeting with the Contractor
and the CITY at the project site.
b) Issue interpretations and clarifications of the Contract Documents, and
evaluate requested deviations from the approved design or
specifications. In connection therewith, prepare up to two work change
directives and change orders.
c) Assist in negotiating with the Contractor the scope and cost of up to two
contract change orders. Prepare such change orders and submit them to
the CITY for review.
d) Review and approve (or take other appropriate action in respect of) Shop
Drawings, samples, and other data that Contractor are required to
submit, but only for conformance with the design concept of the
PROJECT and compliance with the information. given in the Contract
Documents. Such reviews and approvals or other action shall not extend
to means, methods, techniques, sequences, or procedures of construction
or to safety precautions and programs incident thereto.
e) Supervise the work of the ENGINEER'S onsite representative personnel
and other field personnel of the ENGINEER.
f) Make a final inspection of the construction to determine, in general, if the
work has been completed in conformance with the intent of the Contract
Documents. The CITY may furnish a representative to jointly make the
final observation of the construction.
4. Onsite Project Representative
a) The presence of the ENGINEER'S Onsite Project Representative at the
construction site is for the purpose of providing to the CITY a greater
degree of confidence that the completed work will conform generally to
the Contract Documents and that the integrity of the design concept as
SCOPEIDOC
reflected in the Contract Documents has been implemented and
preserved by the Contractor.
b) Furnish Onsite Project Representative personnel to assist the CITY in the
CITY's relations with the Construction Contractor; to provide periodic
observation of the work as defined herein; to prepare periodic progress
reports on the work; to recommend the amounts of payment due the
Contractor as set forth in the Construction Contract. The amount of time
furnished will be 88 person-hours over a contract time of 60 calendar
days to complete the work so that it is ready for final payment as
evidenced by the ENGINEER'S written reconunendation for final
payment. We have assume an average of two visits per week at 5 to 6
hours per visit over an 8 week period. This does not include overtime
and contract time extensions, if required by the PROJECT or the
Contractor to achieve final completion. Overtime and contract time
extension, if deemed required by the CITY and the ENGINEER, will be
addressed in an Amendment to this Contract. The Onsite Project
Representative personnel will be under the supervision of the
ENGINEER and will have the limited responsibility and authority as
designated by the ENGINEER, this AGREEMENT, and the Contract
Documents.
Additional Services
The services enumerated herein will be performed only as authorized by the
CITY. Authorization to proceed will be as specified herein or in the form of a
Task Order specifying the work to be performed and basis of payment. Each
Task Order, after execution by both parties to this AGREEMENT, will
become a supplement to, and a part of, this AGREEMENT
a) Provide services resulting from identified changes in scope of the
PROJECT or its design, including, but not limited to, changes i.n size,
complexity, CITY'S schedule, or character of construction or method of
financing; and revising previously accepted studies, reports, design
documents, or Contract Documents when such revisions are due to
causes beyond ENGINEER's control.
b) Provide administrative and support services during construction that are
outside of the basic compensation for Final Design Services and Services
During Construction such as the following:
i. Investigations, meetings, and negotiations with the Contractor
involving claims and legal complaints, or a significant amount of
defective or neglected work of the Contractor.
ii. Additional work resulting from delinquency or insolvency of the
Contractor; or as a result of damage to the construction PROJECT
caused by fire, flood, earthquake, or other acts of God, all exclusive
of additional work resulting from litigation.
SCOPE~.DOC
iii. Processing Change Orders and Work Change Directives involving
CITY-requested changes in approved designs.
iv. Additional work resulting from strikes, walkouts, or other acts of
trade or labor unions or work required to resolve disputes or goals
involving minority involvement. Additional work resulting from
significant delays or acceleration of the work by the Contractor,
changes or price increases occurring as a direct or indirect result of
materials, equipment, energy shortages, or significant amount of
defective or neglected work by any Contractor.
c) Provide assistance in investigating the cause of malfunctions, failures, or
accidents.
SCOPE1.DOC
ATTACHMENT B -COMPENSATION
ARTICLE 2. COMPENSATION
Compensation by OWNER to ENGINEER will be as follows:
A. COST REIMBURSABLE (TIME AND EXPENSE)
B. BUDGET
A budgetary amount of Twenty Four Thousand Seven Hundred Ninety Seven Dollars ($24,797),
excluding taxes, is hereby established for services in ARTICLE 1. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep OWNER informed of progress toward that end so that the budget or work effort can be adjusted
if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as maybe adjusted, nor is OWNER obligated to pay
ENGINEER beyond these limits.
When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same
extent as if such costs had been incurred after the approved increase.
See attached Table 1, Budget Summary for Meridian Tank Painting Project.
Form 3988.1
REVISED: 7/97
Table 1
Budget Summary for
Meridian Tank Repainting Project
Task Labor $ Ex ense S) Total S
Desi n Services 9,257 733 9,989
Bid Period Services 1,556 132 1,688
Services Durin Construction 5,096 412 5,508
Onsite Project Re resentative 6,473 1,138 7,611
Tot~il 2~,' f#2 2,15' 24,797