HomeMy WebLinkAboutPermit Approval Notice State of Idaho for Silverstone Sub Well 23State of Idaho
DEPARTMENT OF WATER RESOURCES
1301 North Orchard Street, Boise, ID 83706 - P.O. Box 83720, Boise, ID 83720-0098
Phone: (208) 327-7900 Fax: (208) 327-7866 Web Site: www.idwr.state.id.us
September 28, 2001
CITY OF MERIDIAN
33 E IDAHO
MERIDIAN ID 83642
RE: Permit No. 63-31281
Dear Permit Holder:
Permit Approval Notice
DIRK KEMPTHORNE
Governor
KARL J. DREHER
Director
~ ~ 1 ~ V~ YS }'OIA ~. yV~
~No• 23~
The Department of Water Resources has issued the enclosed .permit authorizing you
to establish a new water right. Please be sure to thoroughly review the conditions of
approval and remarks listed on your permit.
The permit is a PRELIMINARY ORDER issued by the Department pursuant to Section
67-5243, Idaho Code. It can and will become a final order without further action by the
Department unless a party petitions for reconsideration or files an exception and/or
brief within fourteen (14) days of the service date as described in the enclosed
information sheet.
As a permit owner you must commence the excavation or construction of the diverting
works within one year of the date the permit was issued, and you must proceed
diligently until the project is completed. The date shown under condition no. 1 is the
date when the project must be completed.
The Department will send you a'Proof Due Notice' approximately 60 days prior to the
above referenced date requesting you to file either a Proof of Beneficial Use form or a
Request for Extension of Time form.
The right to drill a well is not a part of this permit to appropriate water. Beginning in
July of 1987, a statute was enacted which requires a drilling permit for new well
construction and deepening of existing wells. If the well(s) proposed for use under this
water right permit were drilled or deepened after July 1, 1987, a separate drilling
permit must be obtained from this Department. Please contact the Ground Water
Protection Section located here at this office or our regional office nearest you.
Also, please note that water right owners are required to report any change of water
right ownership and/or mailing address to the Department within 120 days of the
change. Failure to report these changes could result in a $100 late filing fee. Contact
any office of the Department or visit the Department's homepage on the Internet to
obtain the proper forms and instructions.
If you have any questions, please contact me at 208-327-7946.
Sincerely,
Shelley W. een
Water Rights Supervisor
SWK:kIt
Enclosure(s)
CERTIFICATE OF MAILING
I hereby certify that on September 28, 2001 I mailed a true and correct copy,
postage prepaid, of the foregoing PRELIMINARY ORDER(Approved Permit) to the
person(s) listed below:
RE: WATER RIGHT NO. 63-31281
CITY OF MERIDIAN
33 E IDAHO
MERIDIAN ID 83642
Kari Lynn Townsend
Secretary
State of Idaho
Department of Water Resources
Permit to e4p~propriate Water
NO. 63-31281
Priority: 08/10/2001 Maximum Diversion Rate: 5.00 CFS
This is to certify, that CITY OF MERIDIAN
33 E IDAHO
MERIDIAN ID 83642
has applied for a permit to appropriate water from:
Source: GROUND WATER
and a permit is APPROVED for development of water as follows:
BENEFICIAL USE 'PERIOD OF USE RATE OF DIVERSION
MUNICIPAL 01/01 to 12/31 5.00 CFS
LOCATION OF POINTIS) OF DIVERSION:'
GROUND WATER NE'/.NW'/<NW'!. Sec: 21, Twp 03N, Rge 01 E, B.M. ADA County
GROUND WATER NE'/NW'/NW''/ Sec. 21, Twp 03N, Rge 01 E, B.M. ADA County
CON4ITIONS OF APPROVAL
1. Proof of application of water to beneficial use shall be submitted on or before October 1, 2006.
2. Subject to all prior water rights.
3. Project construction shall commence within one year from the date of permit issuance and shall
proceed diligently to completion unless it can be shown to the salisfaction of the Director of the
Department of Water Resources that delays were due to circumstances over which permit holder
had no control.
4. The issuance of this right does not grant any right-of-way or easement across the land of another.
5. Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code.
6. The Director retains jurisdiction'to require the right holder to provide purchased or leased natural
flow or stored water to offset depletion of Lower Snake River flows if needed for salmon migration
purposes. The amount of water'required to be released into the Snake River or a tributary, if
needed for this purpose, will be determined by the Director based upon the reduction in flow caused
by the use. of water pursuant to this.permit.
7, After specific notification by the Department, the right holder shall install a suitable measuring
device or shall enter into an agreement with the Department to determine the amount of water
diverted from power records and shall annually report the information to the Department.
8. The right holder shall not provide water diverted under this right for the irrigation of land having
appurtenant surface water rights as a primary source of irrigation water except when the surface
water rights are not available for use. This condition applies to all land with appurtenant surface
water rights, including land converted from irrigated agricultural use to other land uses but still
requiring water to irrigate lawns and landscaping.
9. Water bearing, zone to be appropriated is 350 to 800 feet.
10. Place of use is located within the service area of the City of Meridian municipal water supply.
This permit is issued pursuant to the provisi of Section 42-204, Idaho Code. Witness the signature of
the Director, affixed at Boise, this in d of , 20 ~ ~.
KARL J DREHER, Director