TO: Mayor Tammy de Weerd
Members of the City Council
FROM; Brent A. Blake, Sr.
Engineering: Technician. tI
DATE: 12/03/2009
Mayor Tammy de Weerd
City Council Members:
Keith Bird
Brad Hoaglun
Charles Rountree
David Zaremba
SUBJECT; TASK ORDER #tD14S WITH CIVIL SURVEY CONSULTANTS,INC. (MASTER.
AGREEMENT DATED 11-14-2006), FOR ENGINEERING. CONSULTING
SERVICES IN CONJUNCTION WITFI THE. EAGLE/VICTORY ROAD
INTERSECTION UTILITY IMPROVEMENTS PROJECT FQR A NOT TO
EXCEED AMOUNT OF 11,905:00 DOLLARS,.
(NEXT AVAILABLE CONSENT AGENDA)
RECOMMENDED ACTION
A. Move to:
1. Approve task order # 10145 with Civil Survey Consultants, inc. for engineering.
services for a not to exceedamount of i 1,90.5' dollars.
2. Authorize the Mayor to sign the task order.
Il. DEPARTMENT'CONTACT PERSONS
Brent Blake, :Engineering Technician Jl (Project Manager) 4$$-1349
Kyle Radek, Asst. City Engineer 4$9-1.343
Warren Stewart, PW Engineering Manager 4$9-1350
Tom Barry, Director of Public Works 489-1372
Page I of 2
III. DESCRIPTION
A. Background.
The City of Meridian periodically implements 'utility upgrade projects in conjunction
with Ada County Highway District (ACRD}roadway projects.
In 2004 the City of Meridian contracted with Civil Survey Consultants, Ina for design
services related to the EagleNictory Intersection. Utility Improvements project.
However, in 2006 ACRD put the construction phase of the project out for bid and
ultimately rejected all bids due to the inflated bid amounts. However, ACRD is now
ready to move forward and put the construction phase of the project out for bid again.
Since 2006. there .have :been many revisions to the City of Meridian, ACRD, and the
Idaho Standards for Public WorksCanstruction (1SPWC} specifications. 'These revisions
have made it necessary to update. the original plans and specifications.
B. Proposed Project
The scope of services in the attached task order will include revamping the 2004 plans to
adhere to the current City of Meridian, ACHU, and_ISPWC specifications.
I V. IMPACT
A. Strategic Impact:
This project will meet our mission requirement: of indentifying and prioritizing work to
anticipate,. plan .and provide public services/facilities that support the needs of our
growing community. This project will also ensure that we are prepared to build modern
reliable facilities while maintaining financial stewardship.
B. Servi¢e/Delivery [m~act:
Thais task. order will guarantee that we (Public Works Department} are prepared to
.construct sewer and water utilities in conjunction with the ACRD project entitled
EagleNictory Intersection.
C. Project Costs
Consultant Agreement $1.1,905.00
D. Project Fundne
Remaining Unobligated Enterprise Fund for Water Line Extensions $205,000.00
V, LIST OF ATTACHMENTS
A. Task Qrder # 10145 ,.-1
i i
I~
+! +
Approved far Council Agenda:
tu'~~ ,oy
D$te
Page 2 of 2
TASK ORDER NO. 1:0145
CITY OF MEIZIDAN (OWNER}
AND
CIVIL SURVEY CONSULTANTS INC. (ENGINEER)
This Task Order is issued by Owner and accepted by the Engineer pursuant to the mutual
promises, covenants, and conditions contained in the Agreement between the above
named parties dated November 8, 2006..
CITY OF MERIDIAN
EAGLE 1tOAD (RIDENBAUGH CANAL TO'VICTORY ROAD}
AND
EAGLE ROAD AND VICTORY ROAD INTERSECTION
UTILITY IMPROVEMENTS
PURPOSE
The Engineer's scope of services, time of completion, and compensation shall be as set
forth herein. Services shall generally be described as Engineering Consulting. Services.
TASK 10145 -DESIGN AND CONSTRUCTION
Per the City's request, the Engineer will provide professional engineering services related
to the design of utility improvements to be constructed in conjunction with Ada County
Highway District Project No. 505043 RD203-17 and Project No. 303 141N277.
In 2006 ACRD put these two projects out to bid and based on the results AC;~iD rejected
all bids and Shelved the projects. ACHD is now preparing. new bid documents and
planningtorebid the projects.
The Engineer previously completed City of Meridian utility improvement construction
plans. and specifications that were included in ACHD's 2006 bid package. One set of
plans and specifications were prepared. for each. project.
This scope of services will include work required to make any required revisions to the
plans and to update each. set of plans to meet current ISPWC, ACHD, and City of
Meridian Standards.
The Engineer will send a letter to adjacent property owners and offer them the chance to
obtain a water service per current city policy. City staff will assist in identifying witch
property owners. will receive letters.
1 of 3
The Engineer will prepare one set of construction plans, special provisions, bid schedule,
and construction estimate for each project.
It will.. be the. City's responsibility to negotiate and execute the Joint Effort Agreement for
construction. with ACHD.
It is anticipatedthat it will be necessary toobtain a License Agreement with Boise
Project Board of Control to extend the water main in Victory Road under the McDonald
Lateral. Engineer will. submit plans to Boise Project and coordinate .execution of the
agreement.
The Engineer's. scope of services is as follows:
1~ask 1 - Design Water and Sewer System Improvements
1.1 Review previous design.
1.2 Update plans to include revisions to ACHD plans.
I.3 Revise uti ity improvements per city requests.
1.4 Coordination with property owners..
l,5 Coordination with ACHD.
l.b Boise Project License Agreement.
"task 2 -Construction Document Preparation and Review
2.1 Develop. plans and specifications and bid chedule that meet current design
standards and standard specifications of the City and ISPWC.
2.2 Submit plans to ACHD :for review and .approval prior to construction...
2.3 Submit 2 full size physical copies of ACHD's 99% plans and. the special
provisions to City Engineering .for review and QLPE, Engineer to revise
plans as necessary.
2.4 Prepare final construction documents with inclusion of any addenda from
the bidding phase and. provide one physical copy'for City's use .and 10
physical copies for contractor's use.
Task 3 -Construction Services
3.1 Provide one set of construction stakes for the new water services and the
new water main in Victory Road east of Eagle Road.
3.2 Attend pre-construction meeting.
3.3 Answer any RFI's from the contractor about the design.
2 of 3
3.4 Prepare record drawings meeting the City of Meridian Acceptance of
RecordlElectronic Drawings, dated August 26, 2009.
Task 4 -Administration
4.1 This task includes duties associated with setting up the contract and
submitting monthly invoices.
TIME OF COMPLETION
Engineering services will be completed as needed to construct improvements in
conjunction with ACHD Project No. 505043 RD203-17 and Project No. 303014 IN277.
COMPENSATION
The Not-To-Exceed amount for this Task Order No. 10145 is Eleven Thousand Nine
Hundred Five dollars ($11,905). The hourly rate for services and direct expenses is per
the previously approved Prevailing Fee Schedule effective October 1, 2006, and by
reference made part hereof.
CITY OF MERIDIAN
B ~~%'~~~
TAM e WEERD,
MAY \`\``~~,~-~.....+~~~~,~,,,,~.
Attest:
r ;
~ Fo
~ L
AY E HOLMAN ~ ~C~, ~o~
;,,,,yon ~sT ts.~ • ~ ~.~p````,
Approved by City Council: ~' - ~ ~~
(Date
ENGINEER
BY: ~
3 of 3
Man-Flour And Fee Estimate
City of Meridian
Eagle Road. Utility Improvements
Task Description Project
Maria er Chief
of Surve 5 Project
En neer Design
En ineer 1 Technician I GPS Total
Hours Task
.Cost
Task 1 - Desi n Im rbvements
1.1 Review Previous Oesi n 4 A $340.00
1.2 U ate er ACHD"Revisions 8 t3 $680.00
1.3 Revase t Cit Re uests 8 t3 $680.00
1.4 Pro a .Owner Coordination ~ 4 4 $340.00
T.5 Coordination with ACHD 4 4 $340.00.
1:6 license A reement 6 6 $510.40
Task 2 • Plan Pre aration & Review
2.1 Plans and. S ecifications 16 16 $fi,360:00
2.2 AGHDReview and A royal 2 2 .$170:04
2..3 Desi n Review and Ap rovai S' 8 $6130.04
2.4 Fina! Gohsti•uction Documents 4 4 $340.00
'Task 3 -Construction Services
3,1 GonstrucGoh Stakin 16 16 32 $1,760:00
3.2 Preconstruction Meetin 2 2 .$170.00
3.3 RFLQuestions 3 3 $255.00
3.4 Record Drawin s 12 8 8 26 $1.900.00
Task 4 -Administration $0.00
4.1 Contract and Invoices t3 8 $680.00
Total Man-Hours 0 0 0 89 24 24 137 $10,205,00
Classification Hours Rate Total
Project Maria er 0.00 $105.00 $0.00
Chief of Surve s 0.00 $105,00 $0:00
Project Eri ineer 4.00 $95.00 $o.ao
Desi n En ineer t 89.00 $85:00 $7,565.00
Desi n/Surve Technician l :24:.00 $70.00 $1,680.00
Labor Subtotal 113.00 $9,245.00
Classification Hrs/Miles Rate Total
Misc: Printin $200.00
GPS 24.00 $40.00 $960.00
LicenseA reementFees $1,500:00
Direct Subtotal $2,660.00
Subtotal $11,905:00
Total Estimated Fees $1.1,905.00