HomeMy WebLinkAboutIndependent Contractors Agreement with Custom Electric for WWTP LightingSTANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated the ~ day of ~.~ .,. a in the year 2002 by and between City of
Meridian, Ada County, Idaho (hereinafter called OWNER) and CHS~o~ ~ ~RC'F'Y~~-; =1r~~
(hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Articlc 1 WORK
The CONTRACTOR will complete all Work as specified or indicated in the Agreement. The WORK is generally
described as follows:
The project includes purcahse and instalation of eight light poles and electricals at the Waste Water Treatement
Plant.
The Project for which the Work under the Agreement is described as follows: 2002 WWTP Lighting Project.
All replacement materials and workmanship will meet the City of Meridian Standard Specifications and
Drawings. The Contractor should become familiar with the specifications.
Detailed Description of Work
The locations of each of the light poles are shown in the Drawings.
Item 1 -Mobilization
Item 2 -Install 8 light poles as shown in Drawings: Purchase add install all equipment as shown in Drawings
1 to 4.
Article 2 ENGINEER
The City of Meridian Public Works Department will be the ENGINEER. The City of Meridian Public Works
Department is to act as OWNER's representative, assume all duties and responsibilities and have the rights and authority
assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the
Contract Documents.
Article 3 CONTRACT TIME.
The Work will be completed within forty five (45) calendar days from the date when the Contract Time commences to
run. Time is of the essence.
Article 4 CONTRACT PRICE.
OWNER will pay CONTRACTOR for completion of the Work in current funds as follows: $22,500.00
Article 5 PAYMENT PROCEDURES.
The CONTRACTOR will submit an Application for Payment upon completion of the Work. Applications for Payment
must be submitted to the Public Works Department.
W WTP Lighting Project Page 1 of 4
Payments. The OWNER will make progress payments on account of the Contract Price on the basis of
CONTRACTOR'S Application for Payment as recommended by the Public Works Department, on or about the 15"' day
of each month during construction for Applications submitted to the Public Works Department prior to the 1st day of that
month. All progress payments will be on the basis of the progress of the work measured by the schedule of values
established in Article 4. The OWNER may retain up to 5% of the amount of the payment until final completion and
acceptance of all Work covered by this Agreement. Upon completion and acceptance of the Work, payment will be
made in full, including retained percentages, less authorized deductions, within thirty (30) days.
Article 6 INTEREST.
All moneys not paid when due will bear interest at 12% per annum or the maximum rate allowed by law at the place of
Project, whichever is less.
Article 7 CONTRACTOR'S REPRESENTATIONS.
In order to induce the OWNER to enter into the Agreement, the CONTRACTOR makes the following representations:
7.1 The CONTRACTOR has familiarized itself with the nature and extent of the Work, site, locality, and all local
conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of
the Work.
7.2 The CONTRACTOR has studied carefully all drawings of physical conditions.
7.3 The CONTRACTOR has given Public Works Department written notice of all conflicts, errors or discrepancies that
he has discovered and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
Article 8 CONTRACT DOCUMENTS.
The Contract Documents, which comprise the entire agreement between the OWNER and the CONTRACTOR
concerning the Work, consist of the following:
8.1 This Agreement.
8.2 Exhibits to this Agreement .
8.3 Information For Bidders.
8.4 Drawings.
8.5 CONTRACTOR'S Quote.
8.6 1999 Idaho Standards for Public Works Construction, including Division 100, except as superseded by the
Information For Bidders, contained herein.
8.7 Revisions to the Standard Specifications and Special Provisions.
8.8 Documentation submitted by CONTRACTOR prior to Notice of Award.
8.9 The documents listed in paragraph 8.2 above are attached to this Agreement (except as expressly noted otherwise
above).
There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may only be
amended, modified or supplemented by written Change Order.
Article 9 MISCELLANEOUS.
W WTP Lighting Project Page 2 of 4
9.1 No assignment by a party hereto of any rights under or interest in the Contract Documents will be binding on
another party hereto without the written consent of the party sought to be bound; and specifically but without
limitation moneys that may become due and moneys that are due may not be assigned without such consent (except
to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary
in any written consent to an assignment no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents.
9.2 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the
other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants and
obligations contained in the Contract Documents.
Article 10 OTHER PROVISIONS.
None
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One counterpart
each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the Contract Documents have
been signed or identified by OWNER and CONTRACTOR or by ENGINEER on their behalf.
The Agreement will be effective on ~1 v wG ~ ~ , 20 O L
Owner
By:
Name:
Attest:
Approv
WWTP Lighting Project Page 3 of 4
Exhibit A
Bodiford Construction
Unit Price Total Price
Item escri tion Quantit Units
1 obilization 1 LS 500.00 500.0
2 Install 8 Light Poles 1 Ls 22,000.00 22,500.0
otal Price 22,500.00
VVW'CP Lighting Project Page 4 of 4