HomeMy WebLinkAboutProfessional Services Agreement with Keller Assoc for WWTP Tertiary Filter Bypass Piping Design~~ fro KELLER C~ 131 S.W. 5th Avenue, Suite A • Meridian, ID 83642 April 17, 2002 Brad Watson, P.E. City Engineer City of Meridian Department of Public Works 660 West Watertower, Suite 200 Meridian, ID 83642 Re: Filter Bypass Piping Dear Brad: I have reviewed the requirements for the filter bypass piping and estimate that it would take approximately 8 hours of my time and 16 hours of designer time to complete a drawing sufficient for obtaining quotes on the work. I propose that the work- be completed on an hourly rate basis per the attached rate schedule, with an upper limit: of $2,500, unless the scope changes. The above estimated man-hours do not include formal bidding documents. 'The construction value of the work will probably be in the $20,000-$25,000 range; so bidding should not be necessary. If the cost exceeds $25,000, a change order could be processed with Turnkey, if we can get a reasonable price. If the above meets with your approval, please indicate the City's agreement by executing the attached signature page. Sincerely, KELLER ASSOCIATES, INC. Dennis M. Suihkonen, P.E. DMS/cw cc: John Shawcroft File 02026/02-179 A Company of Professional Engineers and Scientists Ph: (208) 288-1992 • Fax: (208) 288-1999 SIGNATURE PAGE IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date first above written. CLIENT: CITY OF MERIDIAN CONSULTANT: KELLER ASSOCIATES, INC. By; By. r_ ~,~,~7~~ ~ ~~~ -~ obert D. Corrie es L. Keller Title: Mavor Attested: ~ //"' ` ~ 1~ ~ .,,> By: William G. Ber Jr' ~~ ""~'~°: fair>, T4, Y" ~~ ~~ Title: Cit Clerk = ~ ~ .: ~ - ~ ~ , :,. ;; , ,. "~~ Approved By City Council: ~` Date: '7 - Z 3 "' B Z Title: President Attested: ~..~-,~-~ m . By: Dennis M. Suihkonen, P.E. Title:. Project Engineer 02026/02-179 ~Q KELLER ASSOCIATES, INC. TITLE CODE BILLING RATES Janua 1,2002 Personnel Hourl Rate Principal: Jim Keller, P.E. $113.00 Project Managers: Rod Linja, P.E. $107.00 Dennis Suihkonen, P.E. Susan Burnham, P.E. $107.00 $98.00 Chief Engineer: David Kinzer, P.E. $107.00 Project Engineers: Donn Carnahan, P.E. $81.00 James P. Mullen, P.E. $81.00 __ Ryan Adelman, P.E. $71.00 Bryan R. Phinney, P.E. $71.00 Mike Anderson, E.I.T. $62.00 James Bledsoe, E.I.T. _ $62.00 _ Ross Erickson, E.I.T. $62.00 Grant Sanders, E.I.T. $62.00 j Marla Vik, E.I.T. $62.00 Designers: Ian Crane $53.00 _ Alan Jones $53.00 Technicians/Inspection $48.00 Drafting $45.00 Clerical $40.00 Two-Man Survey Crew $85.00 Three-Man Survey Crew $105.00 Mileage Cost $0.31/mile 02026/02-179 /Q I ,