Loading...
Staff ReportSTAFF REPORT: Meeting Date: November 24, 2009 TO: Mayor and City Council ~ ~~~~~ FROM: Bill Parsons, Associate City Planner 208-884-5533 ~ µ~',~F~TVF~ Scott Steckline, Land Development Supervisor 208-898-5500 NOV 19 2009 SUBJECT: FP-09-007 -Bayside Taylor Commerce Park ~'TY OF CiC~f~^~ ;IYY CL~r;:}~ ~ r;~~lrc APPLICATION SUMMARY & LOCATION The applicant, Tealey's Land Surveying, has applied for final plat approval of 14 industrial building lots on 10.06 acres of land for Bayside Taylor Corrnnerce Park. The City Council approved the preliminary plat (PP-09-001) on June 9, 2009. The proposed subdivision is zoned I-L (Light Industrial) and is located at 1100 W. Taylor Avenue in the SW `/ of Section 12, T. 3N., R. 1 W. STAFF RECOMMENDATION The submitted final plat substantially complies with the approved preliminary plat. Staff reconnnends approval of the Bayside Taylor Commerce Park Final Plat subject to the conditions noted below. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council. SITE SPECIFIC CONDITIONS 1. Applicant is to meet all terms of the previous approvals for this site including the approved preliminary plat (PP-09-001) application for this subdivision. 2. If the City Engineer's signature has not been obtained on this final plat by June 9, 2011, the preliminary plat shall become null and void. 3. Prior to submittal for the City Engineer's signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. Revise the notes on the face of the plat prepared by Tealey's Land Surveying, stamped on October 26, 2009 by Patrick A. Tealey, prior to signature of the final plat by the City Engineer, as follows: • Add a note addressing the maintenance responsibilities of the 10-foot wide landscape buffer adjacent to N. West 10`x' Street and West Taylor Avenue. • Graphically depict a 10-foot wide landscape buffer easement adjacent to N. West 10`x' Street and West Taylor Avenue. 5. The landscape plan prepared by South Landscape Architecture, labeled as sheet L-1, dated January 30, 2009, submitted with this application, is approved as subritted. 6. The applicant shall submit applications for design review concurrent with each building Certificate of Zoning Compliance. 7. Adjust the water easement between Lots 8 and 9 to cover the water main. Prior to signature of the final plat by the Ciry Engineer, the applicant shall provide a letter from the United States Postal Service stating that the applicant has received approval for the location of mailboxes. Contact the Meridian Postmaster, Richard Buttram, at 887-1620 for more information. 9. All areas approved as open space shall be free of wet ponds or other such nuisances. All stormwater detention facilities incorporated into the approved open space are subject to UDC 11- 3B-11 and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated surface materials shall not be used in open space lots, except as permitted under UDC 11-3B-11. If the stormwater detention facility cannot be incorporated into the approved open space and still Bayside Taylor Commerce Park FP.doc PAGE 1 meet the standards of UDC 11-3B-11, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of final construction. 9. The applicant shall provide a master address kiosk at the entrance of the development that depicts a directory map and addressing of the buildings within the development. Said signage and any additional requirements (i.e. addressing, maps, number and letter sizes) shall be approved by the Meridian Fire Department. 10. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat does not relieve the Applicant of responsibility for compliance. GENERAL REQUIREMENTS Per UDC 1 I-3A-6 all irrigation ditches, laterals or canals, exclusive of natural waterways, that intersect, cross or lie within the area being subdivided shall be covered. Plans will need to be approved by the appropriate irrigation drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department prior to plan approval. If lateral users association approval can not be obtained, alternate plans will be reviewed and approved by the City Engineer. 2. A portion of this development lies within the Meridian Floodplain Overlay District. The applicant shall submit a Floodplain Development Permit and secure approval before any construction can begin. Permit approval may require development of Base Flood Elevations, mapping of the floodplain and / or floodway boundaries, and analysis of the effect of the development on the floodplain. Reference the City Flood Damage Prevention Code and coordinate with the Floodplain Administrator to verify requirements. 3. Street signs are to be in place, water system shall be approved and activated, fencing installed, sewer line shall be installed and passed air test and video inspection, final plat recorded and road base shall be approved prior to applying for building permits. 4. A letter of credit or cash surety in the amount of 110% shall be required for all uncompleted fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. 5. All development improvements, including but not limited to water, sewer, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy, or as otherwise allowed by UDC 11-SC-1. 6. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. 7. The applicant shall provide a 20-foot easement for all public water/sewer mains new or existing, outside of public right of way (include all water services and hydrants). The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11"map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to construction plan approval. Bayside Taylor Commerce Park FP.doc PAGE 2 9. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 10. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 11. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. 12. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. 13. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9-4-8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells maybe used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 14. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9-4-8. Contact Central District Health for abandonment procedures and inspections (208)375-5211. 15. The applicant's design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or the ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 16. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. EXHIBITS A. Vicinity/Zoning Map B. Approved Preliminary Plat C. Proposed Final Plat D. Proposed Landscape Plan Bayside Taylor Commerce Park FP.doc PAGE 3 Exhibit A -Vicinity/Zoning Map _ ~:-C~ Rl f~ ~ ~ih~~~~~ 3 ~ ~ -4 o ~ ~ ~ ~ ~ t~ ~ ~ e. ,. ' ~ ~ , w _ ~ ~ ~.: I,-~ w 0 - R-4 L-n Z R-15 ~/ BIDDICK ST W B i ~i ~ ~ dm R( ~ ~ ~ ~ s6 ~h UNION PACIFIC RXR ; RUT L-O W MARCON LN )(-l. R1 C-G C-C ~ w C-N 0 RI Z W BARRETT DR 5 ~' W W TAYLOR AVE F- 0 __ .- ~, _i-.. _ N __y W 3 Z _Q -c CREST WOOD DR ~ ~.-O a -1 T C-G Bayside Taylor Commerce Park FP.doc PAGE 4 Exhibit B -Approved Preliminary Plat Ff i~t.....; i t ; I. £-_ = ? 1.. ;! _ e.,.'s_ .°~'..~a.g ,; F t - s .- BAYSIDEIMIAYR6RPCOM ERCE -_3 r ~ - ~ = ° - - PARK SUBDIVISION ~ ~ VAw ..epye Wws p,' A IKYI~OX 3M - R_ R SY . B ~ 'CC11W I$. r.rr is AEROIAf+. ADA CQh~r_ IDAHO . ,. f 2009 .~ . ~ -.-a - ~-- _...g 3CE .~ ~ .......r. ~a i ~, ~ . .~ _ ' c . ,. t ... _,,,,,.. ._rsa.~umA.. --t- ~ ~~~_ ~ Y x r - ! _-° , A~ ~. ~° ¢ r .... y~- J. 1 - ~ d ~_ ~ ~~ ,~ a .Ff. `~ i - ~ ~ '~F _Y ~ 1' ws~..~aee~~"w~.o~.o"ii. ss q ` ~ ~•.:... ,.. '~ ~"~ _ PHASE 4 ~ ~:`s~---~ . ~£Y ecaea W ,» .[KS •e•,• •, :•, ,: ~ t -• s •. ~ ,t I n _ ~ *`J ~9 Is s :a ,asan,.r~cs:orss; • ,,. . B qtr :x. ~ ~ ~ ~ i .I i i - s h ~ r ~ ~ ~ ~ ~' .~r'n°i.~iw~uro.~-asnc,A ~~ iro..n Q '. E :~ , r~ i ~ •, ~ ~aMAK.-6ID[I M[K w i C .. ,' . _.__ i i _. 1 PHASE 2 - ' ~ ; ~ _\l . ~ .~~ ~ ~ ~ E ~ - r~ ~ h f ~ • t 4 *a<<~.ti.,U.,~t roc A ~~ .. ~ ... ~ 15 $ y*Q ~ ~J ~R J~IfR MOT~ I~~ ~±P MME+~I/r YPO b iYrxc v 2 4.. sid1A OPU~.4t { MOYFACMIS'oR PAN ~o •c.0 "'Q >: U , `~ !1 s _~ ~~~ 1~ ~~: :iJ Af MG ~sIM~ ~ ~~ ~ G L~ a~ A.~ 2 r bay Bayside Taylor Commerce Park FP.doc PAGE 5 Exhibit C -Proposed Final Plat (labeled Sheets 1-3, prepared by Tealey's Land Surveying, stamped on 10/26/09 by Patrick A. Tealey) -- K~ 8 _-__31.T ~" e 5 I dv`.'~r :irN'.a'° I L-1 1 lOCbd~ •u-f--Ei- w,iT~k~T ~1°w '~M~ o., - ~ ~ru4d.F- - s 0 _~ ~ .~ .- I-' 4 rl e ~ ~~ [ ~ I 1 ~ = 's$ ~ f q _ ~o ~g s -~~ ~_ f ~. ~ ~. ~s $ p & ' I __i a ~ e- _ 'y ~`' I' 9 - -+.x.13+-_ _ __ R 8':~ mrr m..,~ u..w ee , ~ srw.w ti li PLAT OF WAYSIDE TAYLOR COMhIERCE PARK SCIBDIV151O'V ~ Tama, ar TfE ~T ~/z Sw ~/~. SECt~ u s T.,A7., R1N, &Y, ~~ a.ox aAi.auAO ~ IiFDIAII, 11~A COlM1Y, OAHO F ¢ " 20'I O ~~66'7?~6 I333f $ _c 'f~ ovScd' ,gam ... _.-:-~ se - _ _ / Sc. l -_ ... ~9 ! -- ----~ f -- I w y 1 ~~KI i$ B 12 _._., .f...~~.-i L• l 19'0'0~W 63? •~- w Flo a 'r+b ~ ra u~ WESTrIRANfLM ROAD BASIS Oi BEARRIL -__ nw ru ~ _ I i - _ _ LEGEND ~ •OYONY ~K f ~ ' 6.O:g111 !WONT I I V }! [~ C[NT[R tYIC f I ~ ~ vrr S FWO O1A36 CID 6 rOUO AL1MI4111 Vr P9uo sie• aRN r•I _ ~r ~ Pr • sl vs• r »• •aN wc.iuP IN ., cAC Ox+rw run wr szr ~ ~ • 6f i VT . Yf' •9M rM ..CM g '. ~ .. .. ~ n ., w.u a ncalm ~ ' I~ dpWYL PNQL/~Oi LK ~~_ _ ,g ---/ wrul+af+r c~oi:Nr; srT lg ~ .. NOTES •li' 1 n I ~ I ~ I w,.a•.cmw I ~ ccTrn w6u ~ rM x..x. a .,v'~, w'cwow mlroN+x .x ~: i. I ,~w..u..nvc ~. c..u .. ra rk a r.T ~;~ 'R .~ n~,~ m.weun I ' v. cmrs n n.c cu u.rrn~n I .' • •J, _ ~ i .aer~nz mw a ,. u . ~~c°6anev.~rrY:cr'. ~'~~i. a 1 - I c..r•o~ a.~e. wwx na um w craw u..Tn. ra r.• ~ I • ftf rfc0~ S d•.Fr K ffrp rEP..NY[9.4 •JNiv YJNIMrW I w ~ I Mo ~A6~: Or1~R(/.ra fK_M yrM ns .tKLSP[Ne n M6 . _ - .~,~ _U _ _ L___ ___ .~py!r ••a4MUOfICS fwu •! Kr . ~ o ~ rti"`~wex .s~aamsv wur save.crer rur`. n 11EbT TAYLOR AVENUE ,• ohir 4p BPS. afs «Nr •wcf r AAw+•VM~NCf ~ ° a wa. N RuM~ ~~ralu~Dw w.narcu r~ w~a N00'01'00' Y 11039 ~_- -~ V L' _. ._.. ___ . (]y~~ oar r ~ IIrCL],Ir ~', w... c. v.c. ~ .r ,. ~ ~ ~''~.~-~-`"' .«n... a rw .,:` _ ..~,w n.,ro, ,,, .o ~'0 b° ~~ N. -fsT qM srREET~~~ TE_ALEY'6 LAND SURYEY918 _. -_ ~___ -_-~ ~9 ProMc<NO. a~u •~•~• SNeN i or J Wayside Taylor Commerce Park FP.doc PAGE 6 Exhibit D -Proposed Landscape Plan (labeled Sheet L-1, prepared by South Landscape Architecture, dated 1/30/09) ~4 .._ '~---~--`--____~ ~----~-~--------- ' I -- 7 _._ - _ i;~ .. _ .. ,, M Exg!M!o "9 ,.. ~ __ ;W. ~_ ~ i w J p.__. ... `. ._. ~_ (~ ~iNVrp~pgf ~. OMM{n DMIA 1 €_ n 1 9 ~ao eEO ~~ . rz w.~wr ec _ 'r.:.1 ~ _., J....... ..,.. ..`~. . R~X11NG NOTEB Bayside Taylor Commerce Park FP.doc PAGE 7