Loading...
HomeMy WebLinkAboutProfessional Services Agreement with Cole Associates Architects for Bear Creek RestroomsRECEIVED CONSENT ADGENDA ITEMS Storey Park phase 2 construction JAN - 2 2002 City of Meridian City Clerk Office Request for approval for J.G.T architecture of Nampa Idaho to provide design, plans and construction documents for the phase 2 renovation of Storey Park. The fee for services is $ 5750.00 ~- Bear Creek Restrooms Request for approval for Cole and associates architects of Boise for design, plans and construction documents for bathroom construction at Bear Creek Park. The fee for services is $ 11000.00 __ M lassociates architects, P.A. 960 BROADWAY - SUITE 240 BOISE, ID 83706 208.331.3200 208.331.3244 fx email: scole~colearch.com December 5, 2002 Mr. Elroy Huff Parks Superintendent City of Meridian 11 W. Bower Street Meridian, Idaho 83642 RE: Architectural Services New Prototype Mid Size/Bear Creek Restroom Building and Maintenance Storage Building Meridian Parks and Recreation Dear Elroy: Thank you for requesting the services of Cole ~ Associates Architects for the above referenced project. We look forward to working with you on this project. Scope of Work The scope of work will include the following: A new restroom building and maintenance storage building for the City of Meridian Parks located at Bear Creek Park. The restroom facility will provide 3 water closets and 2 sinks for women and 2 water closets, 2 urinals and 2 sinks for men. The facilities will be designed to meet ADA requirements. The new facility will have the following: CMU for the exterior and interior partition walls, trussed roof with metal roofing material. The floor will be a concrete slab. Utilities (water, sewer, and electrical power) are located on site within the general area of the proposed building. Scope of Services Our services will be broken into the following: Conceptual Design, Construction Documents, Bidding, and Construction Administration. Conceptual Design Cole ~ Associates Architects will provide the City of Meridian Parks Department with a conceptual design for the proposed building that will include the following items: site plan, floor plan and exterior elevations. Construction Documents Upon approval of the Conceptual Design Cole ~ Associates Architects will provide Meridian Parks Department with computer generated Construction Documents for the proposed building that will include the following items: A. Site Plan B. Architectural Floor Plan. C. Exterior Elevations. D. Building Sections. E. Wall Sections and Details. F. Roof Plan and Details. G. Schedules (Door, Window, Finish). H. Structural Design and Details. I. Mechanical Design and Details. J. Plumbing Design and Details. K. Electrical Design and Details. L. Specifications. `` The following items area not included in our fee proposal and will be considered additional services: civil engineering, geotechnical engineering and reports, and landscape. Biddin Cole ~ Associates Architects will assist Meridian Parks Department with distribution of documents, pre-bid conference, and response to correspondence during the bidding phase of services. Construction Administration Cole ~ Associates Architects will assist Meridian Parks Department during the construction phase of services. Cole ~ Associates Architects will visit the site to review construction progress, provide field reports, review contractor payment request, and provide necessary response and correspondence for change order requests, request for information, proposal requests. Cole ~ Associates Architects will assist the Owner with close out documents and determination of Substantial Completion. Owner Responsibilities 1. The Owner will provide the Architect with a legal description of the property. 2. T'he Owner will provide a topograhpic and boundary survey for the property. 3. The Owner will pay for all required permits and fees. 4. The Owner will provide and pay for geotechnical investigations and reports. 5. The Owner will pay for all necessary special inspections. 6. All other engineering consultants not provided in this proposal are to be the responsibility of the Owner. Reimbursable Ezpenses 1. Travel expenses for mileage at .41 cents per mile. 2. Computer plots, blue prints, and photocopies All items except mileage and travel will be invoiced at cost plus 10%. Additional Services 1. The services of disciplines other than described in the scope of services above. 2. Preparations of design options, which differ, form the scope of work described above. 3. Any other services not included in the above described work, and as noted in the Standard Form of Agreement Between Owner and Architect (AIA B141-1997), Article 3, "Additional Services". All additional services will be invoiced per our standard hourly rates: Our hourly rates are: Principal 90.00/hour Project Manager 80.00/hour Project Architect 70.00/hour CADD 65.00/hour Clerical 45.00/hour Fee Cole ~ Associates Architects, PA would like to propose that AIA standard contracts for Architectural services be used for this project. Our fee for the above-described services will be as follows: Basic Services Architectural 7,000.00 Structural (Pinnacle Engineering) 1,200.00 Electrical (Mulder Engineering) 1,200.00 Mechanical (Musgrove Engineering) 1,600.00 Total Basic Services 11,000.00 _~ We look forward to the successful completion of this project. If you have any questions, please do not hesitate to call. I have enclosed two original copies of the proposal. Please sign and date both copies, retain one for your record and return the other for our record copy. Respectfully Submitted, ~ ~ Stanley A. Cole President, Cole ~ Associates Architects, PA ~. tYa~o3 Signature ate `R~~~~tr-~rri~ttrrr~ri ~p ~ /' CC: file (02-225fee.docs) ~.~ G~ ~pOR,q T •~ ~ - ~~ ` F~ y C.7 ~iJ Cl~l~ SLAL ~ ~~ ~~ 9~ O~ ~~ '~. 90 Usr ~s~ • ~.~~ rte! t ~ > I `ref ~ `~ 4` F 4 2 ' ~ ~\`` ~~~rfl f,l$'p,7 r+J r s fti','41~r,\ C,hjC~~~ ~ 7 03