Loading...
HomeMy WebLinkAboutTask Order No. 10170 with Civil Survey Consultants, Inc. for Linder and Pine Intersection Utility Improvements~~i~E IDIAN~- Public IDAHO Works Department TD: Mayor Tammy de Weerd Members of the City Council FROM: Brent A. Blake, Sr. Engineering Technician II DATE: 11!01/2009 SUBJECT: LINDER/PINE INTERSECTION UTILITY IMPROVEMENTS (NEXT AVAILABLE CONSENT AGENDA) I. RECOMMENDED ACTION A. Move to: Mayor Tammy de Weerd Cliy ~ndl Masrb~ersr Keith Bird Brad Hoaglun Charles Rountree David Zaremba 1. Approve task order #10170 with Civil Survey Consultants, Inc. for engineering consulting services in conjunction with the Linder/Pine Intersection Utility Improvements project for the amount not to exceed $10,9SS.00, and; 2. Authorize the Mayor to sign Task Order #10170 II. DEPARTMENT CONTACT PERSONS Brent Blake, Engineering Technician II (Project Manager) Kyle Radek, Asst. City Engineer Warren Stewart, PW Engineering Manager Tom Barry, Director of Public Works 489-0349 489-0343 489-0350 489-0372 i Page 1 of 3 ~ III. DESCRIPTION A. Background The City of Meridian periodically implements utility upgrade projects in conjunction with Ada County Highway District roadway projects. Most of the projects implemented require adjustments to the City's existing utilities. The LinderlPine intersection Utility [mprovements project is an example of such projects. B. Proposed Project The consulting engineer previously provided the City with design services related to this intersection project under Task Order #1 -Utility Projects in. Conjunction with ACRD Projects. However, the Ada County Highway District (ACRD) recently expanded the limits after delaying the project for two years. Therefore, this scope of services will cover additional sewer and water improvements related to the project limits expansion and work required to upgrade the previous design to comply with -the City of Meridian's 2008 Supplemental Specifications to the ISPWC. The Engineer will prepare bid item notes and special provisions for the identified items and provide the notes and special provisions to ACHD to be included on their plans. The following are the identified items for this project: o Adjust approximately 3 existing water valves. o Adjust water mains and water services where conflicts exist with new storm drain or irrigation pipes. o Abandon fire hydrant adjacent to Biddick Street. o Install new fire hydrant assembly near Biddick Street. o Relocate two existing water meters behind the new sidewalk. o Update existing design to meet the City of Meridian's 2008 Supplemental Specifications to the ISPWC. o Coordination with ACHD's Consultant. o Pothole existing water main at 18 potenrial sites where it will cross the future storm. drain or imgation. IV. IMPACT A. Strategic Impact: This project meets our mission requirements to indentify and prioritize work to anticipate, plan and provide public services and facilities that support the needs of our growing community and ensure modern reliable facilities while maintaining financial stewardship. Put~e 2 of 3 B. ServicelDelivery Impact: This project will save money for the Public Works Department by implementing the design of our utilities into the ACRD design plans. Hence, it would cost more money to have our consultant produce AutoCAD plans rather than having ACHD's consultant produce them. Money will also be saved due to the fact that the City will be working under ACHD's Storm Water Pollution Prevention Plan. C. Fiscal Impact: Project Costs Consultant Agreement $10,955.00 Project Funding Enterprise Fund for Water Line Extensions $205,000.00 V. TIME CONSTRAINTS Council's approval will allow implementation of the City's utility design into ACHD's design for this project. VI. LtST OF ATTACHMENTS A. Task Qrder #10170 Approved for Council Agenda: Tom Barry, Director of Public Works Date Page 3 oj3 TASK ORDER NO. 10170 CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS -INC. (ENGINEER) This Task Order is issued by Owner and accepted by the Engineer pursuant to the mutual promises, covenants, and conditions contained in the Agreement between the above named parties dated November 8, 20fl6. CITY OE MERIDIAN LiNDER ROAD AND PINE STREET INTERSECTION UTILITY IMPROVEMENTS PURPOSE The Engineer's scope of services, time of completion, and compensation shall be as set forth herein. Services shall generally be described as Engineering Consulting Services. TASK l 0170 -DESIGN AND CONSTRUCTION Per the City's request, the Engineer will provide professional engineering services related to the design of new and relocated water and sewer system improvements to be constructed in conjunction with the Ada County Highway District Project No. 306007. The engineer previously provided the City with design services related to this intersection project under Task Order #1 -Utility Projects in Conjunction with ACHD Projects. However, the Ada County District recently expanded the limits and delayed the start of the intersection project. This scope of services will cover additional sewer and water improvements related to the project limits expansion and work required to upgrade the previous design to comply with the City of Meridian's 2008 Supplemental Specifications to the ISPWC. The Engineer will prepare bid .item notes and special provisions for the identified. items and provide the notes and special provisions to ACHD to be included on their plans. A separate plan set will not be prepared by Civil Survey Consultants. The Engineer's scope of services is as follows: Task 1 -Design Water and Sewer System Improvements 1.1 Adjust approximately 3 existing water valves. 1 of 3 1.2 Adjust water mains and water services where conflicts exist with new storm drain or irrigation pipes. 1.3 Abandon fire hydrant adjacent to Biddiek Street. 1.4 Install new fire hydrant assembly near Biddick Street. 1.5 Relocate two existing water meters behind the new sidewalk. l.ti Update existing design to meet the City of Meridian's 2008 Supplemental Specifications to the ISPWC. 1.7 Coordination with ACHD's Consultani. 1.8 Fothole existing water main at 18 sites where it will cross the future storm drain or irrigation. `Task 2 -Construction Document Preparation and Review 2.1 Revise existing bid item notes and special provisions. to meet the City of Meridian's 2008 Supplemental Specifications to the ISPWC. 2.2 Provide ACHD's consultant with bid item notes and special provisions. 2.3 .Submit Z full size physical copies oi'ACHD's 99°lo-plans and the special provisions to City Engineering for review and QLPE, Engineer to revise plans as necessary. Task 3 -Construction Services 3.1 Provide one set of construction stakes for the new fire hydrant assemblies. 3.2 Attend pre-construction meeting. 3.3 Answer any 1ZFl's from the contractor about the design. 3.4 Prepare record drawings meeting the City of Meridian Acceptance of RecordlElectronic Drawings, dated August 26, 2049. Construction changes will be noted on a hard copy of ACHD's construction plans and then submitted to the City along with the required CD's. It will be the City's responsibility to negotiate and execute the Joint Tiffort Agreement for construction with. ACHD. TIME OF COMPLETION Engineering services will be completed as needed to construct improvements in conjunction with ACHD Project No. 305007. 2of3 COMPENSATION The Not-To-Exceed amount for this Task Order No. 10170 is Ten Thousand Nine Hundred Fifty Five dollars ($10,955). The hourly rate for services and direct expenses is per the previously approved Prevailing Fee Schedule effective October 1, 2006, and by reference made part hereof. CITY OF MERIDIAN ENGINEER BY: ~~r~i '~- 13Y:. TAn de WEERD, MAYOR \\`~~•~'y ~p~"R~~®®®~'•,~~o~ Attest: ~ ,' ~' ~,o~~TFO =, ~+;~11a - JAYC HOLMAN %~~i9 T ts~ •~°'o ~~.~'~ O 9~ Approved by City Council: ~~~~' iui ~ `~~~~ (Date) 3 of 3 Man-Hour And Fee Estimate City of Meridian Linder Road and Pine Street Intersection Task Description Project Mona er -Chief of Su Project En ineer Design En ineer 1 Technician) GPS Total Hours Task Cost Task 1 - Desl n Im rovements 1.1 Ad'ust Water Valves 2 2 $170.00 1.2 Ad'ust Mains and Services 4 4 $340.00 1.3 Abandon Fire H rant 2 2 $170.00 1.4 New Fire H dram Assembl 2 2 $170.00 1.5 Relocate- Water Meters 4 a $340.00 1.6 U date Exisitin Desi n 8 8 $680.00 1.7 Coordination with ACHD 3 3 $255.00 1.8 Pothole Water Main 4 2 2 8 $560.00 Task 2 -Plan Pre ration 8 Review 2.1 Revise Notes and S ifications 2 4 6 $550.00 2.2 Submit to ACHD 2 2 $170.00 2.3 Desi n Review a~ A rovat 8 8 $680,00 Task 3 -Construction Services 3,1 Construction Stakin 2 t3 8 18 51,050.00 3.2 Preconstruction Meeting 2 2 $170.00 3.3 RFI Questions 4 4 $340.00 3.4 Record Drawin S 8 4 4 16 $1,120.00 Toial Man-Hours 2 0 0 59 14 14 89 56,765.00 Classification Hours Rate Total Project Mana er 2.00 $105.00 $210.00 Chief of Surv 0.00 $105.00 $0.00 Prci ect En ineer 0.00 $95:00 $0.00 besi n En inset 1 59.00 $85.00 $5,015.00 Desi nlSurve Technician I 14.00 $70.00 $980.00 Labor Subtotal 75.00 $6.205,00 Classification HrslMiles Rate Total Misc. Printin $50.00 GPS 14.00 $40.00 $560.00 Patholin - Circle H Construction 18.00 $230.00 $4,140.00 Direct Subtotal $4,750.00 Subtotal Total Estimated Fees $10,955.00 $10,955.00 taskorder10170.x1s