HomeMy WebLinkAboutTime ExtensionE IDIAN,
March 17, 2008
Becky McKay
Engineering Solutions, LLP
1029 N. Rosario Street, Suite 100
Meridian, Idaho 83642
RE: Time Extension for Ventana 43 Subdivision
Dear Ms. McKay:
Mayor Tammy de Weerd
City Council Members:
Keith Bird
Joe Borton
Charles Rountree
David Zaremba
Per the findings of the attached staff report for Ventana #3 Subdivision, I am granting approval of an 18 -
month time extension as requested. You have until September 15, 2009 to obtain the city engineer's
signature on this Final Plat.
If you should have any questions regarding this matter, please don't hesitate to call Sarah Wheeler at 884-
5533.
Si cere y,
C \ Y
�.
AnnVorcheN rs Canning, AICP
Planning Director
CITY OF MERIDIAN PLANNING DEPARTMENT STAFF REPORT
DATE: March 17, 2008
TO: Anna Canning, Planning DirectorEC�IDIAN-_�—
IDAHO
FROM: Sarah Wheeler, City Planner
SUBJECT: Ventana Subdivision No. 3 Time Extension
Request for an 18 -month Time Extension to Obtain City Engineer's Signature on the Final Plat
for Phase 3 of Ventana Subdivision Consisting of 70 Single -Family Residential Building Lots
and 4 Common Lots on 18.21 Acres in an R-8 Zone by Ventana, LLC (File # TE -08-005)
We have reviewed this submittal and offer the following comments:
APPLICATION SUMMARY
The applicant, Ventana, LLC, has requested approval of a time extension to obtain the City Engineer's signature
on the final plat for Ventana Subdivision No. 3. The subject final plat consists of 70 single-family residential
building lots and 4 common lots on 18.21 acres in an R-8 zoning district. The Applicant has been unable to meet
the time requirements specified in Unified Development Code (UDC) 11-6B-7 and 11-5B-6. According to the
Applicant the delay resulted because the current slump in the housing market hindered the developer's ability to
continue platting Phase 3 (see Applicant's letter dated March 12, 2008).
The annexation (AZ -04-019), preliminary plat (PP -04-026), and conditional use permit (CUP -04-028) for
Ventana Subdivision was approved by the Meridian City Council on January 25, 2005. The final plat for
Ventana Subdivision No. 3 (FP -06-055) was approved by City Council on January 16, 2007. The City Engineer
signed the Ventana Subdivision #2 Final Plat on September 19, 2006. Per UDC 11 -6B -7B, Ventana Subdivision
#3 would otherwise expire on March 15, 2008.
The City of Meridian's Unified Development Code (UDC 11-6B-7) allows the Director to authorize one
administrative time extension to record the final plat, not to exceed 18 -months, when the applicant files a written
request for an extension prior to the expiration of the plat. The Applicant has filed a written request for an 18 -
month time extension one day before the final plat expired, meeting the necessary deadline. Additional time
extensions up to 18 -months as determined and approved by the City Council may be granted.
With all extensions, the City may require compliance with the current provisions of the UDC as a condition for
granting a time extension (UDC 11 -6B -7C). Staff believes that there are no additional conditions that should be
added to those approved by the City Council with the final plat for this subdivision; the current conditions of
approval shall remain in effect.
LOCATION
Ventana Subdivision No. 3 is located north of East McMillan Road and .east of North Meridian Road in a
portion of the SW '/4 of T. 4N., R. 1 E., Section 30.
STAFF RECOMMENDATION
Staff recommends approval of an 18 -month time extension to obtain the engineer's signature on the final plat for
Ventana Subdivision No. 3, to expire on September 15, 2009.
TE -08-005 Ventana #3 Time Extension.doc PAGE I
RECEIVED
CRY OF
C�.� YLfiY1011GfY! -A MAR 111 2008 Planning Department
wC IDAHO City of MAiDJWISTRATIVE REVIEW APPLICATION
t,,Planning Department
1907
Type of Review Requested (check all that apply)
❑ Accessory Use
❑ Alternative Compliance
❑ Certificate of Zoning Compliance
❑ Conditional Use Permit Minor Modification
❑ Design Review
❑ Property Boundary Adjustment
❑ Short Plat
❑ Temporary Use Certificate of Zoning Compliance
El Time Extension (Director)
❑ Vacation
❑ Other
STAFF USE ONLY:
File number(s): -TE--09)
Project name: \Jmkv,✓�k TIS �5
Date filed:.3_1 ti -0 00 Date complete:
Assigned Planner: S,,,ra V,
Related files:'
CVP- d _p ti
Applicant Information
Applicant name: Ventana, LLC Phone: (208) 288-5560
Applicant address: 1977 E. Overland Road Zip: 83642
Applicant's interest in property: QOwn ❑ Rent ❑Optioned ❑ Other
Owner name: Same as Applicant Phone:
Owner address:
Zip:
Agent name (e.g., architect, engineer, developer, representative): Becky McKay, Planner
Firm name: Engineering Solutions, LLP Phone: (208) 938-0980
Address: 1029 N. Rosario Street, Suite 100, MeridianID Zip: 83642
Primary contact is: ❑ Applicant ❑ Owner CEJ Agent ❑ Other
Contact name: Becky McKay Phone: 1208) 938-0980
E-mail: es-beckymcz_gwest.net Fax: (208) 938-0941
Subject Property Information
Location/street address: N. of E. McMillan Road and E. of N. Meridian Road
Assessor's parcel number(s): S0530325410
Township, range, section: TAN., R.IE., Section 30 Total acreage: 18.21
Current land use: Vacant Current zoning district: R-8
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: \\\\\\.m�:ridiancit..or2
1
Project Description
Project/subdivision name: Ventana Subdivision No. 3
General description of proposed project/request: Request for 18 -month approval extension for Phase 3 of project,•
Phase 2 was signed by Meridian City Engineer on 9/15/06 requiring Meridian City Engineer signature for Phase 3
by 3/15/08. We are requesting that the date to obtain Meridian City Engineer signature be amended to 9/15/09
Proposed zoning district(s): R-8 (Existing)
Acres of each zone proposed: 18.21 R-8
Type of use proposed (check all that apply):
El Residential ❑ Commercial ❑ Office ❑ Industrial ❑ Other
Amenities provided with this development (if applicable): N/A
Who will own & maintain the pressurized irrigation system in this development? N/A
Which irrigation district does this property lie within? N/A
Primary irrigation source: N/A Secondary: N/A
Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): N/A
Residential Project Summary (if applicable)
Number of residential units: Number of building lots:
Number of common and/or other lots:
Proposed number of dwelling units (for multi -family developments only):
1 Bedroom: 2 or more Bedrooms:
Minimum square footage of structure(s) (excl. garage): Proposed building height:
Minimum property size (s.f): Average property size (s.f.):
Gross density (DU/acre-total land): Net density (DU/acre-excluding roads & alleys):
Percentage of open space provided: Acreage of open space:
Percentage of useable open space: (See Chapter 3, Article G, for qualified open space)
Type of open space provided in acres (i.e., landscaping, public, common, etc):
Type of dwelling(s) proposed: ❑ Single-family ❑Townhomes ❑ Duplexes ❑Multi -family
Non-residential Project Summary (if applicable)
Number of building lots: Other lots:
Gross floor area proposed:
Existing (if applicable):
Hours of operation (days and hours): Building height:
Percentage of site/project devoted to the following:
Landscaping:
Building:
Paving:
Total number of employees: Maximum number of employees at any one time:
Number and ages of students/children (if applicable): Seating capacity:
Total number of parking spaces provided:
Authorization
Print applicant name
Applicant signature:
Number of compact spaces provided:
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: «aNk.meridiancit,'.ora
2
EfGINEERNG
planning and engineering communities for the future
SOL UTIONSUP
March 12, 2008
Ms. Anna Canning
City of Meridian P&Z
660 E. Watertower
Meridian, ID 83642
Re: Ventana Subdivision No. 3
Dear Ms. Canning:
1029 N. Rosario Street, Suite 100
Meridian, ID 83642
Phone: (208) 938-0980
Fax: (208) 938-0941
E-mail: es-beckym@qwest.net
Ventana Subdivision No. 2 was signed by the Meridian City Engineer on 9/15/06. Per Meridian
City Ordinance 11 -6B -7B, the signature of the Meridian City Engineer must be obtained by
3/15/08 for Phase 3. The final plat for Ventana Subdivision No. 3 was submitted on 12/11/06,
with City Council approval given on 1/16/07. Due to the current slump in the housing market,
the developer is unable to continue platting of Phase 3 at this time.
Per Meridian City Ordinance 11 -6B -7C, we respectfully request a time extension of 18 months
to obtain the signature of the Meridian City Engineer (to 9/15/09). Attached are a vicinity map
and a check in the amount of $75.00 for the time extension filing fee. Please call if you have
questions or need additional information. Thank you.
Thank you.
Sincerely,
Engineering Solutions, LLP
Becky McK P ner
Planner
BM:ss
Attachments
cc: Ventana, LLC
CADocuments and Settings\2005\01\50131\timeextl.doc