Loading...
HomeMy WebLinkAboutChange Order No 1 with Civil Survey for Victory Road WaterlineCHANGE ORDER NO. 1 No. 1 DATE OF ISSUANCE EFFECTIVE DATE OWNER City of Meridian CONTRACTOR Civil Survev Contract: Victory Road Waterline ENGINEER Citv of Meridian You are directed to make the following changes in the Contract Documents: Description: Lower the waterline approaching Eagle Road. Also, relocate waterline to avoid gas main and delay for phone line not shown properly on plans. Reason for Change Order: Additional cost for work described above. Attachments: (List documents supporting change): March 19,2004 request from Civil Survey CHANGE IN CONTRACT PRICE: Original Contract Price $ 13.110.00 Net Increase (Decrease) from previous Change Orders No. to $ None Contract Price prior to this Change Order: $ 13,110.00 Net increase (decrease) of this Change Order: 2 000 Contract Price with all approved Change Orders: $ 15.110.00 CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: Ready for final payment: (days or dates) Net change from previous Change Orders No. _ to No. _ Substantial Completion: Ready for final payment: (days) Contract Times prior to this Change Order: Substantial Completion: Ready for final payment: (days or dates) Net increase (decrease) this Change Order: Substantial Completion: Ready for final payment: (days) Contract Times with all approved Change Orders: Substantial Completion: Ready for final payment: (days or dates) RECOMME ED: By: EN NEER (Authorized Signature) Date: ~~ EJCDC 1910-8-B (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. APPROVED: By: ~~~.- - cx Mayor De Wee ~y Date: _ ~' l_ ""~ 7 Attest ~i~- William Berg Jr., City Clerk ~ ~~~urrrurrrrrr,rr~// T~ ~ ~` C3` O~pdRq l~. 0 _ 3~rri~ - 9~j ~~q~ Q .;' ~'. 9Q ~~T 1 S'~ ~ ~ \\. .~,. ~~ '9 `,.~~~%~~cQCS~Y ~~\,,,, rrrrrarar nrrr"~ ~4 ~,...J y/fib ~ ._ Glenn K. Bennett, P.L.S. President Timothy A. Burgess, P.E. Vice President Civil Survey Consultants, Inc. 100 South Adkins Way Suite 101 Meridian, Idaho 83642 (208)888-4312 Fax 888-0323 March 19, 2004 Len Grady City of Meridian 660 E. Watertower Meridian, ID 83642 Re: Victory Road Water Line Dear Len: As you know the Victory Road Water Line Project has seen a number of revisions and modifications requested by Meridian to accommodate the ongoing needs of new developments in the area. These changes have resulted our work effort exceeding the current design budget. Therefore, I am requesting an increase of $2,000.00 for a total revised contract amount of $15,110.00. This requested supplement will cover all work through preparation of record drawings, unless the project scope changes again. Sincerely, Civil Survey Consultants, Inc. ~~~~~G~ Tim Burgess, P.E.