Loading...
HomeMy WebLinkAboutTask Order No. 10095 with Civil Survey Consultants, Inc. for McMillan & Locust Grove Utility Improvements~~i~E IDIAN Public IDAHO Works Department TO: Mayor Tammy de Weerd Members of the City Council FROM: Tim Curns, Transportation and Utility Coordinator DATE: October 7, 2009 SUBJECT: Task Order NO. 10495 with Civil Survey Consultants Inc I. RECOMMENDED ACTION A. Move to: Mayor Tammy de Weerd CNy CeansH Mewisar:e Keith Bird Brad Noaglun Charles Rountree Dati(d Zaremba 1. Approve the Task Order with Civil Survey Consultants for the McMillan Road and Locust Grove Road Intersection Utility Improvements, Not-To- Exceed amount of $15,725; and 2. Authorize the. Mayor to sign the agreement II. DEPARTMENT CONTACT PERSONS Tom Barry, Director of Public Works 489-0372 Warren Stewart, PW Engineering Manager 489-0350 Tim Curns, Project Manager 489-0342 III. DESCRIPTION Background The Ada County Highway District will begin reconstruction of the McMillan/Locust Grove intersection in the late fall of 2010. As part of the reconstruction, City of Meridian utilities will need to be adjusted to meet State required clearances. Also, the construction will allow the City to connect a section of water main that has not been possible before. The option of constructing utility stubs to neighboring properties can also be made available. Page 1 of 2 ------- 1 a' IV. IMPACT A. Strategic Impact: The project furthers the goal of Public Works to provide safe and reliable drinking water. B. Service/Delivery Impact: Additional customers may have access to City utilities. Also, the new water main connection will bring a section of infrastructure into utility corridor compliance, minimizing future utility conflicts. C. FiscalImpact: The Not-To-Exceed amount for Task Order No. 10095 is $15,725. V. ALTERNATIVES Council may choose not to approve the Task Order. However, this is not recommended as the project timeline is short and a design engineer must be contracted to design changes required by the ACRD construction. VI. TIME CONSTRAINTS The timeline for the intersection project being constructed by ACRD has been accelerated. The timeline for design is, therefore, tight and the City's utility plans will need to be completed by spring of 2010. VII. LIST OF ATTACHMENTS A. Task Order No. 10095 -Original Copy, signed by Consultant Approved for Council Agenda: Tom Barry, Director of Public orl la~~o~ar Date Page2of3 TASK ORDER NO. 10095 CITY OF MERIDIAN AND CIVIL SUKVEY CONSULTANTS INC. (ENGINEER) This Task Order is issued by Owner and accepted by the Engineer pursuant to the mutual promises, covenants, and conditions contained in the Agreement between the above named parties dated November 8, 2006. CITY OF MERIDIAN MCMILLAN ROAD & LOCUST GROVE ROAD INTERSECTION UTILITY IMPROVEMENTS PURPOSE "1'he Engineer's scope of services, time of completion, and compensation shall be as set forth herein. Services shall generally be described as Engineering Consulting Services. TASK 10095 -Design and Construction Per the City's request, the Engineer will provide professional engineering services related to the design of new and relocated water and sewer system improvements to be constructed in conjunction with the Ada County Highway District Project No. 307010. The Engineer's scope of services is as follows: Task 1 - Design Water and Sewer System Improvements 1.1 Adjust approximately 14 existing water valves. I.2 Adjust water mains and water services where conflicts exist with new storm drain or irrigation pipes. Adjust existing water mains under the two Lemp Canal box culverts. 1.3 > xtend approximately 20 feet of the 12 inch water main on the west leg of McMillan Road to connect with the existing stubbed main within the intersection with Locust Grove Road and abandon approximately the 65 feet of 12 inch water main traveling diagonally through the intersection. 1.4 Provide water and sewer service stubs to parcels 85147490700 and 85147490609, if requested by property owner. 1 of 3 Task 2 -Construction Document Preparation and Review 2.1 Develop plans and specifications and bid schedule that meet current design standards and standard specifications of the Gity and ISPWC. Plans to meet the following criteria: - Cover, general notes, plan and profile, key notes, and City standard detail sheets. - Scale of drawings: 1 "=40' -Existing utilities shown - Existing and proposed storm drain and roadway features shown -Adjacent property lines - Symbols legend - Layout and block to match ACHD's Plans 2.2 Submit plans to ACHD for review and approval prior to construction. 2.3 Submit 2 physical copies of full size plans and specifications for review at 100% design to City Engineering for review and QLFE, Engineer to revise plans as necessary. 2.4 Prepare final construction documents with inclusion of any addenda from the bidding phase and provide one physical copy for City's use and 10 physical copies for contractor's use. Task 3 -Construction Services 3.1 Provide one set of construction stakes for the service stubs to parcels 85147440700 and 85147490609. The city will provide Engineer with a complete set of ACHD's roadway design plans that show horizontal and vertical control points used for the roadway design. 3.2 Attend pre-construction meeting. 3.3 Answer any RFI's from the contractor about the design. 3.4 Prepare record drawings meeting the Cit3~ of Meridian Acceptance of Record/Electronic Drawings, dated August 26, 2009. It will be the City's responsibility to negotiate and execute the Joint Effort Agreement for construction with ACRD. Plans will be prepared once the City has provided Engineer with AutoCAD electronic files of the final design submittal to ACHD. The City will obtain permission from ACHD to use the electronic files for utility design purposes. All required work to lower the existing water mains under the realigned Lemp Canal will be performed under ACHD's agreement with the Irrigation District. The City will handle all coordination with ACHD and the Irrigation District. 2of3 It shall be the City's responsibility to contact the adjacent property owners and coordinate service stub requests. Engineer will design service stubs at the locations identified by the City. TIME OF COMPLETION Engineering services will be completed as needed to construct improvements in conjunction with ACHD Project No. 307010. COMPENSATION The Not-To-Exceed amount for this Task Order No. 10095 is Fifteen Thousand Seven Hundred Twenty Five dollars ($15,725). The hourly rate for services and direct expenses is per the previously approved Prevailing Fee Schedule effective October 1, 2006, and by reference made part hereof.. CITY OF MERIDIAN BY: L ~ /1 Cz-~_--- o ,4Cfi',.~ MAYOR , `\`\`~~~~~ uVFr~Qi~~ Attest: ,.~`~~~C~~y oAro®~y ~~~'-. .~' Fa ', J Y HOLMAI~ ~ ~ ~°j p Approved by City Counci~e~ %~~ ~.4~~) ENGINEER BY: 3 of 3