CONTRACT CHANGE ORDER
CHANGE ORDER NO. 1
PROJECT NO.
DATE: i 0119/09
EFFECTIVE DATE: 101199
CONTRACTOR: APEX INTEGRATED SECURITY SOLUTIONS
PROJECT: MERIDIAN CITY HALT SECURITY ADDITIONS
Tire Contractor is hereby directed to make the following changes from tfre Contract Documema and PMns.
Desciption: Addidon of 11 Access Control Devices per the attached Scope of Work,
Reason for change order: Additional access control points per Council recommendation
Attaehema~: Scope Of WOrk
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Ori®Inal Conract Prit;e S 34,35D,00 Origtnal Contract Times:
Net d+anges form previous Change Orders Net changes form previous Change Orders
No._ to _ No._ to _ (calendar days)
$0.00
Contrail Price Prier to this Change Order. Contrail Times prior to this Change ONer.
(calendar days)
$34,350.00
Net Increase (deu+ease) of this Change Order: Net Increase (decease) of psis Change Order:
{eate~ar days)
$38,16x.00
Contrail trice with all Approved Change Orders: Contrail Times rin'9ti aq Approved Change Orders:
(calendar days)
$72,510.00
RECOMMENDED: (Canawdcn Manager) APPROVED' (CITY PU
RC
HASING AGENT)
-UUiu I,
I
~,; \``~++-
U ~. K alt ""
'
Date:
~~~\\~ ~ ~ ~+~~
~~ - ~ r
~ ii
V
ACCEPTED: (Contwctorj OVER BY COUNCIL
O
~~~ NOS NATCRE
EQUIRED
R'
Date: // /~ _ /
~
DA I V
APPROVED: --°"" ~ ~ _
~ o
/ _._ _
a)~Tamnry de
d .
~~ii~~
C^e .a ~ C~jl~Clerk, Jayue~. Holman
_
~
,,'
,
Date: l~~
Attachment A
SCOPE OF WORK
Add 11 additional access control devices to the new City Hall Site, three (3)
on the basement level of the building, five (5) on the first floor of the
building, one (1) on the second floor of the building, and two (2) on the 3`~
floor of the building per the following specifications. To include all required
Lenel Licensing. Required cabling must be run in the cable trays located in
the access flooring.
BASEMENT LEVEL ACCESS CONTROL DEVICES
Door # 242 Women's Lockers
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
"Magnetic Lock
1 Labor. Installation, Programming and Testing Total: $3,085.00
Door # 418 Exercise Room
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
"' Electric Hinge
'` Electric Lockset
1 Labor. installation, Programming and Testing Total: $3,115.00
Door # 414A Clerks Fife Rvom
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
• Electric Hinge
* Electric Lockset
1 Labor. Installation, Programming and Testing Total: $3,115.00
FIRST FLOOR ACCESS CONTROL DEVICES
Door #: 135A Chambers Left Side - Electrified Locking Hardware,
No Reader
1 Lenel Access Control Hardware (No Reader)
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
`Electric Hinge
"Electric Lockset
1 Labor. Installation, Programming and Testing Total: $2,685.00
Door #129 Receiving Interior Door
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
* Electric Hinge
* Electric Lockset
1 Labor: Installation, Programming and Testing Total: $3,115.00
Door #128 Mail Room
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
* Electric Hinge
Electric Lockset
1 Labor. Installation, Programming and Testing Total: $3,115.00
Door #1356 Chambers Door (right entry only)
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
* Auto Operator
'' Electric Hinge x2
* Elec#ric Rail x2
1 Labor. Installation, Programming and Testing Total: $7,160.fl0
Door #152 Cashier to OfFce
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Lacking Hardware -Provided by ABS
`' Electric Hinge
* Electric Lockset
1 Labor. Installation, Programming and Testing Total: $3,i 15.00
SECOND FLOOR ACCESS CONTROL DEVICES
Door #224 East Corridor to Hall
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
Electric Hinge
* Electric Lockset
1 Labor. Installation, Programming and Testing Total: $3,115.00
THIRD FLOOR ACCESS CONTROL DEVICES
Door # 321 Attom®y Reception
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
* Magnetic Lock
1 Labor. Installation, Programming and Testing Total: $3,270.00
Door # 325 Mayors Reception
1 Lenel Access Control Hardware
1 Misc. Materials and Supplies
1 Locking Hardware -Provided by ABS
* Magnetic Lock
1 Labor. Installation, Programming and Testing Total: $3,270.00
Attachment B
MILESTONE !PAYMENT SCHEDULE
A. Total and complete compensation for this Agreement shall not exceed
$38,160.00.
TASK DESCRIPTION AMOUNT
A, Door # 202 Women's Lockers $3,085.00
g, Door # 018 Exercise Room $3,115.00
C• Door # 014A Clerks File
Raom
$3,115.00
D Door #: 135A Chambers Left
Side -Electrified Locking
Hardware, No Reader
$2,685.00
E• Door #129 Receiving Interior
poor
_..
$3,115.00
F. Door#128 Mail Room $3,115.00
G• Door #1358 Chambers Door
(right entry only)
$7,160.00
H. Door #152 Cashier to Office $3,115.00
I• Door #224 East Corridor to
Hail
$3,115.00
~- Door # 321 Attorney
Reception
$3,270.00
K, Door # 325 Mayors Reception ~ $3,270.00
TOTAL $38,1f0.00