HomeMy WebLinkAboutTimberfalls Sub No 2 FP 03-043MAYOR
RoEeRr D. CORRIL
COUNCIL MEMBERS
WILLIAM L.M. NARY
KEITH BIRD
TAbIMY DE WEERD
CHERIE MCCANDLE55
RURAL FIRE COMMISSIONERS
RICHARD GREENE
'I~RRY LEIGHTON
STEVE ELLIOTr
C r
exrv nP' ~m_
~~}
err~t~n „
IDAHCJ ~l
~'r
- I ieka
CHIF.P
KEV W'. BOWERS
DEPOI'Y CH[eF -FIRE PREVEN~noN
JOSEPH SILVA
DEPUTY CMEF- TRAINIn'G
BILL JOHNSON
540 Fast Franklin Rmd
Mcridlan IU 33642
tzos~ sssaz34
Fas (208) 89i-0390
MERIDIAN CITY/RURAL FIRE DEPARTMENT
RECEIVED
August I1, 2003 AUG 1 t 2003
City Of Meridian
City Clerk Office
TO: Mayor, City Council & Meridian Planning & Zoning Commission.
FROM: Joseph Silva, Deputy Chief, Fire Prevention
SUBJECT: Timberfalls Subdivision No. 2 FP 03-043
The following will be the requirements and/or concerns to provide minimum levels of fire
protection for the proposed project:
One and two family dwellings will require afire-flow of 1,000 gallons per
minute available for duration of 2 hours to service the entire project. Fire
hydrants shall be placed an average of 400' apart. 1997 UFC Appendix
III-A
2. Acceptance of the water supply for fire protection will be by the Meridian
Water Department.
Final Approval of the fire hydrant locations shall be by the Meridian Fire
Department.
4. The phasing plan may require that any roadway greater than 150' in length
that is not provided with an outlet shall be required to have a hirn around.
All roads shall have a turning radius of 28' inside and 48' outside.
6. Operational fire hydrants and temporary or permanent street signs are
required before combustible construction begins. UFC 901.4.2 & 901.3
The proposed 19-lot subdivision with an estimated 2.9 residents per
household would have a total estimated population of 55 residents at build
out. The Meridian Fire Department has experienced 2069 responses in the
year 2000 and 2251 calls for service in 2001. According to a report
completed by Fire & Emergency Services Consulting Group in February of
2000 our requests for service are projected to reach 2800 in the year 2005
and 3800 by the year 2010.
9. The proposed project lies outside the five-minute response zone goal.
Achievement of this goal is subject to budgetary constraints and is intended to
enhance the probability o f a favorable outcome o n a r equest for Basic L ife
Support. The budget constraints are typically defined as capital outlay for
facilities that are located within 1.5 miles from a given location and sufficient
operational funds to staff the facilities.
10. Paint the curb red 10' on either side of all fire hydrant locations.
Robert D.
CITY COUNCIL~fLF 1B
Tammy de Weerd
William L. M. Nary
Cherie McCandless
Kei[h Bird
zone for TimberFalls Subdivision No. 2
LEGAL DEPARTMENT
(208) 466-9272 • FAX 4GG-4405
PARKS & RECREATION
(208) 888-3579 • Fax 898-5501
PUBLIC WORKS
(208) 898-5500 • Fax 887-1297
BUILDING DEPARTMENT
(208) 887-2211 • Fax 887-1297
PLANNING & ZONING
(208) 884-5533 • Fax 888-6854
TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS
WITH THE CITY OF MERIDIAN
To insure that your comments and recommendations will be considered by the Meridian City
Council please submit your comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by: August 12, 2003
Transmittal Date: July 18, 2003 Hearing Date: August 19, 2003
File No.: FP 03-043
Request: Final Plat approval of 18 building lots and 3 other lots on 14.31 acres in an R-8
By:
Location
Wood
or Project:
CITY OF y,..;_°' '..-. .
- ~ ~„
eri~i~n ~f ~~~
~~
IDAHO j
.yFC /~
FM v
R ~• TgE:tiSURE V A>~ SINCE
~ 1900
David Zaremba, P/Z (NUVaR,vac,FP)
Jerry Centers, P/Z (NO VAR, VAC. FP)
Leslie Mathes, P/Z (Na VAR, VAC, FP)
Michael Rohm, P/Z (NO VAR, VAF FP)
Keith Borup, P/Z (NOVaR, vao, Pq
Robert Corcie, Mayor
Bill Nary, C/C
Tammy deWeerd, C/C
K ' Bird, C/C
herie McCandless, C/C
Water Department
Sewer Department
Sanitary Service (NO vaR, vac, FP)
Building Department
Fire Department
Police Department
City Ariomey
City Engineer
City Planner
Parks Department
Meridian School District Mo W)
Meridian Post Office (FP/PP ONy9
Ada County Highway District
Ada County Development Services
Central District Health
Nampa Meridian Ircig. District
Settlers Ircigation District
Idaho Power Co. (FFrPP«,rn
tJ.S. West ~P/PP OiYy)
Intermountain Gas fFPiPP «Ey)
Bureau of Reclamation tFPmPOny)
Idaho Transportation Department (NO FP)
Ada County (az w,pg
Ada County Assess. Land Records (FP/PP oM7
Meridian Development Corporation
RECEIVED
JUL 2 1 2003
City Of Meridian
City Clerk Office
33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433
City Clerk Oftice Fax (208) 888-4218 Human Resources Fax (208) 884-8723 Finance & Utility Billing Fax (208) 887-4813
MAYOR
Rober[ D. Cowie
CITY COUNCIL MEMBERS
Tammy de Weerd
Winiam L. M. Nary
Cherie McCandless
Keith Bird
},j~.,~
CITY OF f,R1~~~°'-'
C~eri~i~nJ ~~
~l IDAHO
Meridian School District (NO FP)
Meridian Post Office tFP~PP OMr1
Ada County Highway District
Ada County Development Services
Central District Health
Nampa Meridian Irrig. District
Settlers Irrigation District
Idaho Power Co. rFwPPOng9
U.S. West rFP~PPO~yi
Intermountain Gas (FPrvP Unryg
Bureau of Reclamation (FP/PP UMr)
Idaho Transportation Department ~~)
Ada County Iazomr)
TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS
WITH THE CITY OF MERIDIAN
To insure that your comments and recommendations will be considered by the Meridian City
Council please submit your comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by: August 12, 2003
Transmittal Date: July f 8, 2003 Hearing Date: August 19, 2003
File No.: FP 03-043
Request: Final Plat approval of 19 building lots and 3 other lots on 14.31 acres in an R-8
zone for Timberfalls Subdivision No. 2
By: pan Wood
Location of Property or Project: south of East Ustick Road and west of North Locust Grove Road
David Zaremba, P/Z (NO VAR, VAC, FP)
Jerry Centers, P/Z (NO vart vac, FP1
Leslie Mathes, P/Z lNO VAR, vac, FP)
Michael Rohm, P/Z Qun vAR Vac, w1
Keith Borup, P2 tnrovaR,vAC,FPI
Robert Corrie, Mayor
Bill Nary, C!C
Tammy deWeerd, C/C
Keith Bird, C/C
Cherie McCandless, C!C
ater Department
Sewer Department
Sanitary Service MovaR,vaar-~
Building Department
Fire Department
Police Department
City Attorney
City Engineer
City Planner
Parks Department
LEGAL DEPARTMENT
(208) 466-9272 • PAX 46G4405
PARKS & RECREATION
(208) 888-3579 • Fax 898-5501
PUBLIC WORKS
(2D8) 898-5500 • Fax 867-]297
BUILDING DEPARTMENT
(208) 887-2211 • Fax 887-1297
PLANNING & ZONING
(206) 884-5533 • Fax 888-6854
Ada County Assess. Land Records (FwPP OnM
Meridian Development Corporation
Historical Preservation Commission
Remarks: Al...~ -
City Of Meridian
City Clerk Office
Ta~CEI~ RECEIVED
~'~ JUL Z 12003
ti
WASTEWATER DEPT.
33 EAST IDAHO AVENUE • MERIDIAN, IDAHO 83642 • (208) 888-4433
City Clerk Office Fan (208) 888-4218 Human Resources Fax (208) 884-8723 Finance & Utility Billing Fax (208) 887-4813
MAYOR
Robert D. Cowie
CITY COUNCIL MEMBERS
Tammy de Weerd
William L. M. Nary
Cherie McCandless
Keith Bird
2003
TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS
WITH THE CITY OF MERIDIAN
To insure that your comments and recommendations will be considered by the Meridian City
Council please submit your comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by:
Transmittal Date: July 78, 2003 Hearing Date: August 19, 2003
File No.: FP 03-043
Request: Final Plat approval of 19 building lots and 3 other lots on 14.31 acres in an R-8
zone for t I
By: Dan wood
Location of Prooertv or P
No. 2
~~
~~,,QQ ,,~~'' CITY OF _ -
~.~VIt 8Y1G~IGf-Yl ~'
tl IDAHO
LEGAL DEPARTMENT
(208) 466-9272 • FAX 4664405
PARKS & RECREATION
(208) 888-3579 • Fax 898-iSOI
PUBLIC WORKS
(2D8) 898-5500 • Fax 887-1297
BUILDING DEPARTMBNT
(208) 887-2211 • Fax 887-1297
PLANNING & ZONING
(208) 884-5533 • Fax 888-6854
DavidZaremba,P/Z MnVAR,VAC,FPJ
Jerry Centers, P2 Ina vart vac PP)
Leslie Mathes, P/Z IROVan, vaq FP)
Michael Rohm, P/Z (NO VAR, VAC, FPf
Keith Borup, P/Z (Na VAR, VAC, FPf
Robert Corrie, Mayor
Bill Nary, C/C
Tammy deWeerd, CIG
Keith Bird, C/C
Cherie McCandless, C/C
Water Department
Sewer Department
Sanitary Service r"o vA2 vAC, F~
Building Department
Fire Department
Police Department
City Attorney
City Engineer
City Planner
ZParks Department
Your Concise Remarks:
Meridian School District woFq
Meridian Post Office (FP/PP OnIyJ
Ada County Highway District
Ada County Development Services
Central District Health
Nampa Meridian brig. District
Settlers Irrigation District
Idaho Power Co. (FPiPromy)
U.S. West IFProPOmyl
Intermountain Gas rFP~PPO~~
Bureau of Reclamation rFPmPOPy~
Idaho Transportation Department (RO FP)
Ada County roomy)
Ada County Assess. Land Records 1mmPOmy)
Meridian Development Corporation
Historical Preservation Commission
RECEIVED
JUL 2 2 2003
City of Meridtaa
City Clerk Office
33 EAST IDAHO AVENUE • 1~fERIDIAN, IDAHO 83642 • (208) 888-4433
City Clerk Office Fax (208) 888-4218 Human Resources Fax (208) 884-8723 Finance & Utility Billing Fax (208) 887-4813
CENTRAL
•~ DISTRICT
HEALTH
DEPARTMENT
Rezone #
Conditional Use #
CENTRAL DISTRICT HEALTH DEPARTMENT Return to:
Environmental Health Division ^ Boise
^ Eagle
Preliminary /Final /Short Plat f /" D3 - D S~.
^ rden City
~leridian
^ Kuna
^ ACZ
^ 1. We have No Objections to this Proposal. Al)~ - fl 2003
^ 2. We recommend Denial of this Proposal. City Of Meridian
City Clerk Office
^ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
^ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ or bedrock from original grade ^ other
^ 6. This office will require a study to assess the impact of nutrients and pathogens tc receiving ground waters and/or
surface waters.
^ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
~@. After writt~approval from appropriate entities are submitted, we can approve this proposal for:
antral sewage ^ community sewage system ^ community water well
^ interim sewage central water
^ individual sewage ^ individual water
~9. The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of Environmental Quality:
central sewage ^ community sewage system ^ community water
^ sewage dry lines f~^ antral water
_ Run-off is not to create a mosquito breeding problem.
^ 11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^ 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^ 13. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas
^ beverage establishment ^ grocery store
Please see attached stormwater management recommendatations
^ 15.
^ child care center
Dater /
Reviewed By: ~
~oHD9f~,~ Review Sheet
RECEIVED
AUG - 5 2003
City of Meridian
City Qlerk OfficE
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
William Berg
City of Meridian
33 East Idaho Ave.
Meridian, ID 83642
RE: FP03-043 Timbertalls Subdivision No. 2
Dear Will:
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
Nampa & Meridian Irrigation District requires a Land Use Change Application be filed for
review prior to final platting.
All laterals and waste ways must be protected. The District's Onweiler Lateral courses
through this project. This easement must be shown on the final plat and must be
protected. Any encroachment of this easement, before any construction is started, is
unacceptable without a signed License Agreement and approved plan.
All municipal surface drainage must be retained on site. If any surface drainage leaves
the site, the Nampa & Meridian Irrigation District must review drainage plans. Please
contact Donna Moore at 466-7861 for further information.
The developer must comply with Idaho Code 31-3805. It is recommended that irrigation
water be made available to all developments within the Nampa & Meridian Irrigation
District.
Thank you,
~~~
Bill Henson
Asst. Water Superintendent
Nampa & Meridian Irrigation District
BH/dbg
cc: Water Superintendent '
Riders 2&3
Roy Johnson, Johnson Eng.
File -Office/Shop
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
25 July, 2003
RECEIVED
AUG - 5 2003
City of Meridian CU
''~I DD City Clerk Offices Y
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Roy Johnson
Johnson Engineering & Surveying
9225 Chinden Blvd., Suite J
__Garden City, ID _83714
RE: Land Use Change Application -Timberfalls Subdivision No. 2
Dear Mr. Johnson:
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nompa 466-0663
Enclosed please find a Land Use Change Application for your use to file with the Irrigation
District for its review on the above-referenced development. If this development is under a
"rush" to be finalized, I would recommend that you submit a cashier's check, money order or
cash as payment of the fees in order to speed the process up. If you submit a company or
personal check, it must clear the bank before processing the application.
Should this development be planning a pressure urban irrigation system that will be owned,
operated and maintained by the Irrigation District, I strongly urge you to coordinate with John P.
Anderson, Water Superintendent for the Irrigation District, concerning the installation of the
pressure system. Enclosed is a questionnaire that you must fill out and return in order to initiate
the process of contractual agreements between the owner or developer and the Irrigation
District for the ownership, operation and maintenance of the pressure. urban irrigation system.
If you have any questions concerning this matter, please feel free to call on me at the District's
office, or John P. Anderson, at the District's shop.
Sincerely,
Donna N. Moore, Asst. Secretary/Treasurer
NAMPA & MERIDIAN IRRIGATION DISTRICT
DNM/smc
cc: File
Water Superintendent
Will Berg, City Clerk, Meridian City
Dan Wood, D. W. Inc., 2025 E. Chateau St., Meridian, ID 83642
Shawn L. Nickel, Land Consultants, Inc., 52 N. 2ntl St., Eagle, ID 83616
enc.
APPROXIMATE IRRIGABLE ACRES
RIVER FIOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
31 July 2003