Loading...
HomeMy WebLinkAboutEmail by Jason DensmerPage 1 of 1 Machelle Hill From: Sonya Watters Sent: Tuesday, October 13, 2009 2:20 PM To: Machelle Hill; Jaycee Holman Subject: FW: Cavanaugh Ridge -Revised Preliminary Plat Attachments: PP 091012 Cavanaugh Ridge PrePlat 109095.pdf 8'h" x 11" reduction of the revised plat. From: Jason Densmer [mailto:jason@thelandgroupinc.com] Sent: Monday, October 12, 2009 4:25 PM To: Sonya Watters; Peter Friedman Cc: Ashley Ford; highmark.development@gmail.com Subject: Cavanaugh Ridge -Revised Preliminary Plat RECF,TVFD OCT 14 2009 CITY OF C~f~ DID^~- CITY CLERKS OFFICE Sonya & Pete: I am attaching a .pdf copy of the revised preliminary plat for the Cavanaugh Ridge project. Revisions have been made in response to our meetings with you on Tuesday of last week, and with ACRD on Wednesday. In summary, the western area of the project has been re-designed to: 1. Eliminate previous stub street to the south property line, which was a recommended revision of your staff report. In our meeting with ACHD, their staff indicated this removal would be acceptable to the District. 2. The previous 40-ft access easement along the westerly boundary was replaced with a public street. Please note, the street is provided with 50-ft ofright-of--way adjacent to the Cavanaugh Ridge west property line. As discussed with ACHD, we are proposing that construction by Cavanaugh Ridge include the easterly half of the street and 12-ft of pavement on the west side. The remainder of the street on the west side would be constructed by the adjacent developer at the time of a future development application. This complies with ACHD policies. 3. Roadway, lot layout and open space configurations are revised to accommodate the street added at the west property line. In total, these revisions altered the lot distribution. Updated totals are shown on sheet P100; there are now 282 total lots, 255 of which are single-family and 27 are common areas. 4. The multi-use pathway along the Ridenbaugh Canal has been adjusted to cross the common area of Lot 1, Block 3 and intersect Locust Grove Rd. at W. Wrightwood Drive. The pathway also continues along the westerly wide of Locust Grove Rd. from Wrightwood Drive to the Ridenbaugh Canal. 5. A multi-use pathway has been added parallel with the westerly boundary (lying along the easterly side of the added street) to provide a connection to the Farr Lateral pathway. Please advise me on how many printed hard-copies of the revised preliminary plat are necessary, and I will have them delivered. Should you have any questions, please don't hesitate to let me know. Thanks, Jason Densmer, PE Principal 462 E. Shore Drive, Suite 100 Eagle, ID 83616 ph. 208-939-4041 ext. 125 fax. 208-939-4445 email. jason@thelandgroupinc.com www.thelandgroupinc.com Think Green -please do not print this email unless necessary 10/14/2009