HomeMy WebLinkAboutStaff ReportSTAFF REPORT: Meeting Date: September 22, 2009
TO: Mayor & City Council E IDIAN;--~-
FROM: Sonya Watters, Associate City Planner
208-884-5533
Scott Steckline, Land Development Supervisor
208-898-5500
SUBJECT: FP-09-006 -Bainbridge Church Subdivision
APPLICATION SUMMARY & LOCATION
The applicant, Brighton Corporation, has applied for final plat approval of 1 building lot and 2 common area lots on
5.02 acres of land for Bainbridge Church Subdivision. The proposed subdivision is currently zoned R-8 (Medium
Density Residential); however, a request to rezone the property to L-O (Limited Office) is in process and will be
heard by City Council at the same meeting as the subject application. The property is located on the west side of N.
Ten Mile Road, approximately 1/3 mile south of W. Chinden Boulevard, in the NE `/ of Section 27, T. 4N., R. 1 W.
The City Council approved the preliminary plat (PP-OS-002) for Bainbridge Subdivision on April 19, 2005. The plat
contained 389 single-family residential building lots, 22 other/common lots, 1 church lot, and 1 lot to be developed/re-
subdivided in the future on 152.68 acres of land zoned R-8 (146.83 acres) and L-O (5.85 acres). A planned
development (CUP-OS-002) was also approved at that time for single-family homes, a future neighborhood park, and
a church with reduced minimum lot frontages, reduced minimum lot sizes, and increased maximum block length. A
development agreement was required with annexation (AZ-OS-001) of this property, recorded as Instrument No.
109061598. There have been 3 time extensions granted to obtain the City Engineer's signature on the first final plat
for this subdivision and commence the use as approved with the CUP.
This is the first final plat proposed for Bainbridge subdivision. The applicant has until October 19, 2010 to obtain the
City Engineer's signature on the final plat and commence the use approved with the CUP, as approved with the latest
time extension (TE-09-014).
Staff has reviewed the proposed final plat for consistency with the approved preliminary plat. The proposed final plat
depicts one large lot where approximately 13 single-family residential lots were originally proposed. The large lot
(Lot 2, Block 1) is planned for a church. Per UDC 11-6B-3C.2, because there are fewer building lots, the proposed
plat is determined to be in substantial compliance with the approved preliminary plat. The applicant has submitted an
overall site plan showing their plans for development of the property with the proposed changes in lot configuration
(see Exhibit E). Note: A narrow strip of R-8 zoned land exists between the subject property and the out parcel owned
by the Johnson's to the south that is not part of the subject rezone area or the proposed final plat for this property.
This piece of land is covered by an agricultural access easement benefitting the Johnson property. Unless a property
boundary adjustment is approved in the future to transfer this land to the Johnson 's, this area will need to be included
in a subsequent final plat as common area_for the subdivision. Council should determine if this area should be
included in the subject final plat for the church property.
Note: The preliminary plat for Bainbridge depicts a stub street for future access to the out parcel owned by the
Johnsons from the south subdivision boundary. When the preliminary plat was approved, the stub street to the south
aligned with a stub to the north preliminary platted with Volterra subdivision. However, in 2008, a large portion of
the Volterra development south of the subject property was rezoned and a revised concept plan was approved. The
north easterly stub street to the north boundary shown on. the Volterra concept plan that provided access to the out-
parcel now does not appear to exist. Future phases of Bainbridge will be required to provide local street access to the
Johnson property (parcel #S0427142323).
STAFF RECOMMENDATION
Staff recommends approval of the Bainbridge Church Subdivision final plat subject to the conditions noted below.
These conditions shall be considered in full, unless expressly modified or deleted by motion of the City Council.
Bainbridge Church Sub FP.doc PAGE 1
SITE SPECIFIC CONDITIONS
Applicant is to meet all terms of the approved annexation (AZ-OS-001), development agreement (Instrument
#109061598), preliminary plat (PP-OS-002), and conditional use permit/planned development (CUP-OS-002)
applications for this subdivision.
2. If the City Engineer's signature has not been obtained on this final plat by October 19, 2010, the preliminary
plat shall become null and void unless a time extension is obtained in accordance with UDC 11-6B-7C.
3. Prior to submittal for the City Engineer's signature, the Certificate of Owners and the accompanying
acknowledgement shall be signed and notarized.
4. Revise the notes on the face of the plat prepared by James R.Washburn, stamped on August 24, 2009, prior to
signature of the final plat by the City Engineer, as follows:
a. Add a note prohibiting direct lot access to N. Ten Mile Road (per UDC 11-3A-3A)
b. Include the recorded instrument number for the license agreement with ACHD.
The subject property shall be subdivided prior to issuance of any building permits.
6. Revise the landscape plan prepared by The Land Group, dated August 11, 2009, submitted with this
application, as follows:
a. A 35-foot wide landscape street buffer is required to be constructed on the property along N. Ten Mile
Road, an arterial street and entryway corridor, per UDC Table 11-2A-6 and preliminary plat condition of
approval #5. If the required sidewalk is placed outside of the right-of--way and within the landscape
buffer, the buffer width shall be increased to 40 feet, per preliminary plat condition #S.
b. Direct lot access to N. Ten Mile Road is prohibited; revise landscape plan accordingly.
c. A minimum 5-foot wide detached sidewalk is required along N. Ten Mile Road; revised plan accordingly.
d. Include a pedestrian pathway/access at the west and south boundaries for future interconnectivity with the
residential neighborhood, per requirement of the development agreement approved with RZ-09-003.
7. A 35-foot wide landscape street buffer is required along N. Ten Mile Road, an arterial street and entryway
corridor per UDC Table 11-2A-6 and preliminary plat condition of approval #5; widen Lot 1, Block 1 and the
buffer easement shown on the plat accordingly. If the sidewalk is placed within the street buffer, the width of
the street buffer shall be increased to 40, feet, per preliminary plat condition of approval #S.
8. A minimum 5-foot wide detached sidewalk shall be constructed along N. Ten Mile Road and E. Broadbent
Drive in accordance with the standards listed in UDC 11-3A-17. If the sidewalk is placed within the street
buffer, a permanent public pedestrian easement shall be noted on the plat.
9. A minimum 20-foot wide landscape street buffer, including a minimum 5-foot wide detached sidewalk, is
required on the north side of E. Broadbent Drive, a collector street, per preliminary plat condition of approval
#5. If there is not adequate space for it to be provided in a future final plat within the area preliminary platted
as Bainbridge Subdivision, the buffer shall be provided upon future development of the property to the north.
10. If permanent perimeter fencing is not installed around the perimeter of the site, temporary construction
fencing is required to be installed to contain debris during construction prior to issuance of building permits.
11. Prior to signature of the final plat by the City Engineer, the applicant shall provide a letter from the United
States Postal Service stating that the applicant has received approval for the location of mailboxes. Contact
the Meridian Postmaster, Richard Buttram, at 887-1620 for more information.
12. All areas approved as open space shall be free of wet ponds or other such nuisances. All stormwater detention
facilities incorporated into the approved open space are subject to UDC 11-3B-11 and shall be fully vegetated
with grass and trees. Sand, gravel or other non-vegetated surface materials shall not be used in open space
lots, except as permitted under UDC 11-3B-1 L If the stormwater detention facility cannot be incorporated
into the approved open space and still meet the standards of UDC 11-3B-11, then the applicant shall relocate
the facility. This may require losing a developable lot or developable area. It is the responsibility of the
Bainbridge Church Sub FP.doc PAGE 2
developer to comply with ACRD, City of Meridian and all other regulatory requirements at the time of final
construction.
13. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat does not relieve the
Applicant of responsibility for compliance.
GENERAL REQUIREMENTS
1. Per UDC 11-3A-6 all irrigation ditches, laterals or canals, exclusive of natural waterways, that intersect, cross
or lie within the area being subdivided shall be covered. Plans will need to be approved by the appropriate
irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval
submitted to the Public Works Department prior to plan approval. If lateral users association approval can not
be obtained, alternate plans will be reviewed and approved by the City Engineer.
2. Street signs are to be in place, water system shall be approved and activated, fencing installed, sewer line shall
be installed and passed air test and video inspection, final plat recorded and road base shall be approved prior
to applying for building permits.
3. A letter of credit or cash surety in the amount of 110% shall be required for all uncompleted fencing,
landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat.
4. All development improvements, including but not limited to water, sewer, fencing, micro-paths, pressurized
irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy, or as
otherwise allowed by UDC 11-SC-1.
5. A written certificate of completion shall be prepared by the landscape architect, landscape designer or
qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The
Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler
installation, are in substantial compliance with the approved landscape plan.
6. The applicant shall provide a 20-foot easement for all public water/sewer mains (new or existing) outside of
public right of way (include all water services and hydrants). The easements shall not be dedicated via the
plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement
shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form
available from Public Works), a legal description, which must include the area of the easement (marked
EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both
exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note
to the plat referencing this document.
7. Applicant shall be required to pay Public Works development plan review, and construction inspection fees,
as determined during the plan review process, prior to any construction plan approval.
8. The applicant will be required to abandon any services that are not utilized with final construction. Contact
Meridian Public Works for requirements.
9. Compaction test results must be submitted to the Meridian Building Department for all building pads
receiving engineered backfill, where footing would sit atop fill material.
10. Applicant shall be responsible for application and compliance with any Section 404 Permitting that maybe
required by the Army Corps of Engineers.
11. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be
required by the Environmental Protection Agency.
12. All development features shall comply with the Americans with Disabilities Act and the Fair Housing Act.
13. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees,
being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not
be considered as replacement trees for those trees that have to be removed.
14. Any existing domestic well system within this project shall be removed from domestic service per City
Ordinance Section 9-1-4 and 9-4-8 contact the City of Meridian Engineering Department at (208)898-5500
for inspections of disconnection of services. Wells maybe used for non-domestic purposes such as landscape
Bainbridge Church Sub FP.doc PAGE 3
irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190.
15. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-
4 and 9-4-8. Contact Central District Health for abandonment procedures and inspections (208)375-5211.
16. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above
the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl
spaces of homes is at least 1-foot above.
17. The applicant's design engineer shall be responsible for inspection of all irrigation and/or drainage facility
within this project that do not fall under the jurisdiction of an irrigation district or the ACHD. The design
engineer shall provide certification that the facilities have been installed in accordance with the approved
design plans. This certification will be required before a certificate of occupancy is issued for any structures
within the project.
18. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of
Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of
a certification of occupancy for any structures within the project.
EXHIIBITS
A. Zoning/Aerial Map of Subject Property
B. Approved Preliminary Plat
C. Proposed Final Plat
D. Proposed Landscape Plan
E. Conceptual Site Plan
Bainbridge Church Sub FP.doc PAGE 4
Exhibit A -Zoning/Aerial Map of Subject Property
~; ':'`
k ~* F
.t,
~~~,'. ,~
"r r,;"
"` `:~
..,;~
.. y
Cad I'.;ii~~~~
ffi:, ~,tp x,_xL
~r,,,~?~+~.
Bainbridge Church Sub FP.doc PAGE 5
Exhibit B -Approved Preliminary Plat
.. k',
~ J
i. •.i.i ` ' TY _, ~ ~a es .~i•~ls ~ un n~, ~~.~ x~~ai ri~itu
~aa x
t _=`.~iv~xa is---' ".a ~~~ea+.w aw. _ts-_~.~.ae __ X5.'4.'°3' ...... y~>p
i' _.. _.....
H~
~i_1~~~~ ~ ~;4
'I -1r~i ~ I_l_ ~ .n
1E ~ i _ ~_ t ;-~-~~ ~ ~~ , ~, ~ ~ 6
t ,+
i ~ m
_ ~ ~ ~,
~ 4 --7 ~I -
,i.,w
. i_J I I'q' _ I _L .~, d.. ~ 4
4
. ~ ~ ,_ ._
L i
.,, ~ , ~ ,
t
~ K~
r ( q( I(( -
,l
i
~~ I ~
.~ s ~ ... ..,.._ ~ .-
., _ , ,. ~, ~ __ _~_ . ~ , , ~ ~ t ~ Ta_
I ~'~
4 a ~ t _ ~ iii i ~~C1"!°.1~ ~~` _ ~T- _j r
~~ s,
,.
~~
- . , ,.
~ 'at ~ ~ ~ t ~~ ~
,_
--
,-~:
~..._.
.(n:niCC: iu iiE !.~/[ a n~ urn/~. , 8+~tlpIC1GE 9JBp M99N
.' 5~{q'ffiaEtfri~C N07Yh West LLC y >Hn n.F nrt ,r i>F vccion 7r. isu, rwti.wn.re. ~.,.~
.,...,, daB;~ "- "' q.I M_, B.Y., ht7A CWNiY yp~r a{pj
~~
~ a li
~~
~•
~.
_~ : "~"?'
Bainbridge Church Sub FP.doc PAGE 6
Exhibit C -Proposed Final Plat
rt_ai '~HUWINU
~3AiNBRIDGF~ CHI'H('H Sh1;D1V1SI0N
LOCATED IN THE SEt/4 Of THE NE1/4 nE ECTION 27, T.4N., R.iW., B.M.
MERIpiAN, AD~A COUNTY, lDANO
a~ ~:. ~ 2009 .~~~
`~ Mme,, Bug~fueertng NorLhW98L LLC r y,,. +'"'"~
c~, 52? ~~~ BOISE IDAHO
,. z ~ zs
w_ rNNiptN ooutrvaN6n~s Hlo-l'xnv ao-gel say°2a
M -. :
~~
;.~z..~. a~scx z
-NTS-
Nn rE<,
i~anr
a xa~+n M. n n ,«rW M ,. "a ~.
u
~i cei r_ v n.F r.~,r wwt. sv it uu~~smn ~xnn wn
N u
Y`A
M.Y M usauw ~i
Ire r ~s„i~r4ra: ~
Ya
REAL POIN? OF ffCINNINf)
I
f
'^ <. r .-TE
~. SB919 18~E 1184 67\
'
~
~
1., i wxi
GYYP' 9 ~
~
__
r --T.,,_.__ E pIZOAUgEN7 OR. h
,: o
.. I I ~ , - _- ~-. ...
1 ~ -
. ~ r,~
1.._... _
,.: 1
1 1
nR~
{
,~
I
I
` ~xi'AI
5 I
O
I
I a
i 7
I .. M
3,
~ I
r~
~i I
I
~s ~ -~
i
I x
1r ~z
~<
~
~
U ~
i ~ rv
M ~ g
I
J
it
i
1 ~cGr r I
I "
~ i
(;
i
III
I
I ~`~
iG
I1
NCS'48'25'M 4p_ 5. y
' $
_ _ --~ ~ .I
~ ~
5
-==.p I
.~
11I
M: .
~.a~ yK i
~ ~Po"~~
~' i l~
i17 ~S28
-'4c
^w.
Q4.
A Wt
(J
!.
~~
SCALE: 1' 60'
ti L.E~H. r..uwr cu
~snc awn °n. z r4en
• ~,TM
.« ~e na.
. M.iru
C'7 ~~NH
H t I AIA
wvrl ' ~1,
+w
i , ~n,
i H
,t { ~
;.~ 11 P rs~
.~ 1
~t
~r I Irc» ~ IPt a. , tl
Bainbridge Church Sub FP.doc PAGE 7
Exhibit D -Proposed Landscape Plan
~ ,,.
_ ~. ____~_ y r
~,
.~~
___
.. ~m
i ~~~ '~
.,,
` ~'" ~~:.
~ ~
I ~' ++r^
..~..a ., .~..
I ~ ~ .~ ,.
i
_.~-~a~
a
~~~~~~d
.,... ~I ~ .,. ,. .~
a
M (XK )
...,...,...e,,,....,...,,.~...,~,_...,...._.
. »~s.`...,..e.~.. ,..... w.,... u.,M...:...... m. LAS
r ,..., .....,.
,.
~OwLLwie Fme Frv~_._ „
2
..e h~ w,~mix ,
f ~v , M ~. cr~rra '
A. ~ `s + ' I ~~ ~ anwmMrt~v mnw. w
J .,~ id ~ ,.~ yr.r^^^ ~
' .u ~
~ .....~..
OWNER DATA
/31~wm w, i... ,. _ . _.
,Landscape Plan.. _ u
0
N~
>~
~o
LL
m ~
~~
~U
m
a
)TES ~
,, a........, ».~ goo... , m
~....
.~~ e~ ..r.~ ~ r .
w J
P ~=
, ~~n-n.
•r Mrn. t~.s rt~n ~mr~.. ~+
Bainbridge Church Sub FP.doc PAGE 8
PROJECT
CALCULATIONS
Exhibit E -Conceptual Site Plan
EXHIBIT B
Bainbridge Church Sub FP.doc PAGE 9
.~ a- a_~-.-_. _. _ , ~~~1 --~--____