HomeMy WebLinkAboutChange Order No. 1 with Civil Survey Consultants, Inc. for Well 28 DesignMemo To: Jaycee dolman; Tara Green From; Clint Worthington, P.E., Staff Engineer CC: Kyle Radek, P.E., Assist. City Engineer Warren Stewart, P.E., Engineering Manager Thomas Bany, P:E.G., Public Works Director 8edcy Licari, AdministrativeSecretary date: 8/25/2009 Re: Proposed Agenda Item far September 8, 2009 City Council Meeting The Public Works Department respectfully .requests the following item be placed on the September 8, City Council agenda, under Consent Agenda, for CounciPs consideration: Chanoe Order #1 with Civil Survev Consultants Inc -Well No 28 Pumping Facilities Desi n. Attached is a Change Order with Civil Survey Consultants Inc. for additional design services as it relates to the Well #28 Pumping Facilities Project. The Change Order is for the amount of $14,400. The additional design services are in response to changes in IDEA requirements and City additions to improve pumping facilities and save money in operations costs. These changes will be incorporated into future well designs. The change order will be paid using funds from the Enterprise Fund for Well #28 Pump Facilities Design (60-3490-96166}. Attached is a letter of request from Civil Survey Consultants Recommended Council Action: The Public Works Department recommends that City Council approves the Change Order with Civil Survey Consultants for an amount not to exceed $14,400 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if you have any questions. ° fo CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 1 Project Number: 0733a Date: 8/25/2009 Effective Date: CONTRACTOR: Civil Survey Consultants PROJECT: Well 28 Design The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desciption: 1) Obtaining building permit from Ada County 2) Addition of valuing and piping for automatic by-pass 3) Addition of chain link fence 4) Preliminary engineedng report required by IDEO 5) Plan revisions related to extension of fire sprinkler equipment 6) Plan revisions to add on-site chlorine generation 7) Revisions to electrical and mechanical plans for above items 8) Revisions to the SCADA programming associated with above items 9) Preparation of Piping and Instrumentation Diagram drawings Reason for Change Order: Change in Scope of work. Attachments: Letter of Request from Civil Survey Consultants CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $28,800.00 Odginal Contrail Completion Date: Odginal Contract Completion Days: Net changes from previous C.O.'s.: Net Days change form previous C.O.'s: No. 0 to 0 No. Q to 0 $0.00 Contract Price Pdor to this C.O.: Contract Completion Date before this C.O.: $28,800.00 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $14,400.00 Contract Price with all Approved C.O.'s: Contract Completion Date with all Approved C.O.'s: $43,200.00 RECOMMENDED: (C ONS TRUCTION MANAGER) ACCEPTE CTO ~ , / C~rr/T W ~ rL tHlh/hTb./ B /!Y" _" // y ~~/~( // ~ / y: Date: 8~Z5/O, !/~ By: /ry / / Date: g'~„Z•~~~ APPROVED: (CITY PURC SI GENT ,\\~~~~~~ IN O^j~CIL APPROVAL ~ q . vi' ,i By: Keith Watts Date: \ ~ ~~ ~. p ' ~~ DaR ~ ~ ~ _ / r : APPROVED~(61TY) _ _/~ ES ~ By: M or Tamm de eerd ~ ,y T tS :~ p Date: /: Bys IeEt, Jaycee Holman . r w ~ ,9 , -. O _4 P 8' O l q / \ Glenn K. Bennen. I'.L.ti. Presidcnl Timothy A. Burvcss, P.E. V se Presidcm Clint Worthington, PE City of Meridian 660 E. Watertower, Suite 200 Meridian, ID 83642 Civil Survey Consultants,~nc. 1400 E. rratertower Street Suite 100 Meridian, Idaho R3642 Re: Task Order l;o. 0733a - Wcll 28 Pumping Facilities Dear Clint: czos)xxxaa i z Eaz 88873?3 August 2S, 2009 As you know there are several issues that have come up related to the Well 28 Pumping Facilities that were not covered under the original scope of services. The following is a list of the additional work items and requested design fee increase for each: 1. Assistance in obtaining a building permit from Ada County for the addition to the existing pump house. I am requesting a design fee increase of $900 for this i[cmt. Any fees charged by Ada County will be paid by the City of Meridian. 2. Redesign oP the pumping equipment to include valuing and piping to automatically by-pass flow from the well on start-up Cor water quality purposes. There is currently no location to discharge the by-pass flows. The plans will terminate the piping at the north wall of the building addition for future connection to either a gravity pipeline or pressure pipeline. 1 am requesting a design fee increase of $2,500 for this item. 3. Add chain link perimeter security fencing to pump house site. i am requesting a design fee increase of $600 for this item. 4. Prepare a preliminary engineering report now required by iDEQ. tam requesting a design fee increase of $2.100 for this item. 5. Plan revisions related to relocation of the fire sprinkler equipment that has been added to the existing booster pump building afrer the original plans were developed. We will show the reiocated position of the fire sprinkler controls, backfiow prevention equipment, and building connections on the plans. We will include a bid item for relocation of this equipment, and design of modifications required for the well room addition to the building by a licensed fire sprinkler contractor. 1 am requesting a design fee increase of $1,300 for this item. 6. Plan revisions to add on-site chlorhte generation equipment to the pump house. [ am requesting a design fee increase of $4,200 for this item. Revisions to the electrical and mechanical plans associated with the above items. 1 am requesting a design fee increase of $1,200 for this item. See 8/21/09 demo from DC Engineering. 8. Revisions to the SCADA programming associated with the above items. 1 am requesting a design Fee increase of $400 for this item. See 8/21/U9 Memo from DC Engineering. Worthington August 25, 2009 Page 2 of 2 9. Prepare Piping and Instrumentation Diagrams (P8&1D) drawings for the project. I am requesting a design fee increase of $1,200 for this item. See 8/21/09 Memo from DC Engineering. Task order has anot-to-exceed amount of $28,800. I am requesting an additional $14,400 to cover the additional services as outlined about for a revised total not-to-exceed amount of $43,200. Sincerely, CIVIL SURVEY CONSUI:fANTS, INC. Tim Burgess, P.E. ~C EER/NG Memo To: From emu: Re: Tim Burgess! Civil Survey Brent McMillen/DC Engineering ar2srzoos Well 28 scope changes 440 E. Corporate Drive Suite 103 Meridian, Idaho 83642 Phone: 208.288.2181 Fax: 208.288.2162 Subject: Rlackruck (Well 28) Pump Station Kev~sions l.~ 1'ktartk you very much for t}te opportunity to provide additional engineering on the Blackrock (We1128) Pump Station. The following is our proposed fee based nn the information that you have providexl to us. Projtt~t Understanding Rased upon your email dated August 18, 2009, the Collowing changes am rtxluired: L Consider whether we want to continue to limit the VPD to Toshiba, or allow ahernates? Provide additional specifications to avoid the issues raised dtuing the Well 27 bid. 2. W'e need to nut the new plans through the Ada County building department to get a building permit for the addition. Add any time necessary to acatmplish this task. 3. Afire sprinkler system has been installed in the building. We need to relocate ilte service and control panels from the west wall of the existing pump mom to the west wall of the new pttmp room and add sprinklers to the new pump room. My thought is w require [he contractor to hire a fire sprinkler tympany to do all of this work. [s tttc fire sprinkler relocation something your mcx hanical staff can design? The following is a list of plan changes 1 have made that affect your design: I . :Moved the ViT) to south wall. 2. Moved 11VAC unit west to make room for the chlorine equipment. 3. Moved water level monitor to the west side of the pump. DC Engineering 4. Changed flow meter fmm the propeller type to a mag meter. 5. Added on-site hypochlorite generation equipment to the project, The chlorination equipment is located on the east waU of the pump [room as shown. 6. Added a chlorine residual analyzer in the northwest corner of the pump mom. 7. Added a sokmoid controlled valve at northwest comer ofthe pump room. 8. "I'he conduits on the outside of the existing building at the southwest comer now have telephone service in than that must be relocated. 9. Added a mag meter in existing piping to the PRV in the existing pump room. Schedule • It is anticipated to take approximately 2 weeks to develop revised documents once authorization to pmceed has been given. Fee We are requesting a change in fee of $1200 to incorporate the changes listed above. In addition this will impact pmg~amming and we would request $400 (Four Hundred Dollars) in additional progrartrning fees. Optional P&ID Fce DC F.nghteering would like to propose a fee for generating P&ID drawings for the project. Ttus is based nn the City of Meridians desire to develop the P&IDs for all the well systems. These drawings can be produced on a time and material basis not to exceed $1,200 (One Thousand "I'wo I lundred Dollars). "flunk you again for the opportunity to work with you. Tf you have any quc~sticros, or require additional information, please do not hesitate to ask. Thanks 13rcnt Mc.NTillen PG DC Engineering