Loading...
HomeMy WebLinkAboutCherry Lane Expansion Proposal Correspondence~~~~~~~ f~AR 2 ~ 1'99 ~IT~I OF ~iFFI~~~~fi~ RESORT PLANNING INTERNATIONAL March 22, 1994 Mr. Grant P. Kingsford, Mayor CITY OF MERIDIAN 33 E. Idaho Ave. Meridian, Idaho 83642 RE: Cherry Lane Expansion Proposal Dear Mr. Mayor: Thank you for the opportunity to provide professional design services for the Cherry Lane Golf Course expansion. Based upon our meeting last week in your offices the services that you would like us to provide are as follows: Basic golf course design and working drawings to include: A. General grading Plan B. Plant massing concept C. Drainage concept D. Basic specifications as required Conceptual Clubhouse site plan and building floor plan to include: A. 4,000 - 6,000 s.f. building with: - small bar - small snack bar - restrooms - decks - cart storage below B. Separate maintenance building with employee parking C. Driving Range tee box D. Practice green E. 250 car parking lot The clubhouse work will be a continuation of the work that we will be providing to Brighton Corporation. As you know we are doing a basic study for them to determine the amount and location of ground needed for the clubhouse. It is understood that Wally knows someone that he would like to use for the irrigation design. Also, you have P.O. BOX 4240 McCALI„ IDAHO 83638 (PH) 208/634-4863 (FAX) 208/634-4951 mentioned that you would like to use the existing green details and specs for the expansion. This is fine but perhaps you would like to have us update them and create a little more interest. As we were meeting in your offices last week it became apparent to me that in order to really cut the expense of the expansion we must follow an iterative process whereby we continually monitor the potential construction costs as we create the design. What this means is that as we develop concepts we should continually track and modify both the costs and the plans until we collectively reach a consensus. For instance, the plan as it stands now has a fair amount of ponds to create fill material for course movement. If we determine this to be too expensive we must reduce the pond sizes which starts a domino effect forcing modifications throughout the plan. If we agree upon this approach to the design, it is virtually impossible to pinpoint an exact cost to complete the design, as we don't know the extent of the modifications. A fee range of $10,000 - $15,000 will be required to complete the-work described above. If for some reason it appears that we will go beyond this total, we will notify you well in advance so that we can discuss how to proceed. A retainer of $4,000 will be required prior to the commencement of any work. Billing will be monthly as time is expended as a percentage of completion. RESORT PLANNING INTERNATIONAL is prepared to start work as soon as the agreement is signed and the retainer is received. If the above proposal meets with your approval, a signed copy together with the retainer check will be our authorization to proceed. Please make checks payable to: RESORT PLANNING INTERNATIONAL, INC. PO Box 4240 McCall, ID 83638 Once again, thank you for the opportunity to work on this project. Sincerely, David Peugh RESORT PLANNING INTERNATIONAL, INC. Accepted by: Date: