HomeMy WebLinkAboutTester Farms FP
MERIDIAN CZTY COUNCIL
JUNE 18, 1991
PAGE #8
Eng. Smith: The other item concerns the staking of the project. I have been in
contact with Hubble Engineering and they have given me a range of fee from
$17,000 to $25,000. somewhere in that area. These two items are in addition
to the construction costs. The Highway District is roughly paying 708 of those
costs.
The Motion was made by Giesler and seconded by Yerrington to authorize the Mayor and
Clerk to hire the stakers and the materials testing people subject to a dollar figure.
Motion Carried: All Yea:
Discussion Held on hiring an Inspector (TAPE ON FILE)
ITEM #6: FINAL PLAT ON JASMINE ACRES:
The Motion was made by Giesler and seconded by Yerrington to approve the Final Plat
on Jasmine Acres and authorize the Engineer and Clerk to sign off.
Motion Carried: All Yea:
ITEM #7: FINAL PLAT ON VAL VISTA SUBDIVISION:
The Motion was made by Yerrington and seconded by Giesler to authorize the Engineer
and Clerk to sign off on this Final.. Plat on Val Vista Subd.
Motion Carried: All Yea:
ITEM #8: DEPARTMENT REPORTS:
Yerrington: Wanted to report that we have a new trash truck.
Giesler: We still have a flooding problem in the park at the Chamber Building.
The Engineer got a bid for around a thousand dollars to have this repaired. After
visiting with the President of the Chamber they said they would pay half if the
City would pay half.
Clerk Niemann: He is scheduled to come before Council at the next meeting.
I also need approval of a beer license for the new Meridian Chevron Station.
The Motion was made by Giesler and seconded by Yerrington to approve a beer license
for the new Meridian Chevron Station.
Motion Carried: All Yea:
The Motion was made by Yerrington and seconded by Giesler to adjourn the meeting
at 9:10 P.M.:
Motion Carried: All Yea:
MAYOR
COUNCIL MENIDERS
ENGINEER
ATIbRNEY
ATI'ACHID IS PLAT ON VAL VISTA SUBDIVISION: PHASE # I, COUNCIL WILL NEED
~ APPI~VE THIS PLAT SO THE CITY CLERK & CITY ENGID7EIIt CAN SIGN:
THIS PROPERTY IS WITHIN THE AREA OF IMPACT AND UNDER THE COUNTY ORDINANCE
IT IS NECESSARY FOR THE CITY TD SIGN PLATS:
THIS WILL BE ON THE AGENDA FOR JUNE 18, 1991:
JACK NIII~7ADIN
CITY CLERK
<~ J-U-B ENGINEERS, INC.
250 South Beechwood Avenue, Suite I Boise, Idaho 83709 • Telephone (208) 376-7330
June 7, 1991
Mr. Jack N. Neimann
City Clerk
City of Meridian
33 East Idaho Street
Meridian, ID 83642
Re: VAL VISTA SUBDIVISION - Phase I
Ada County Planning Services File No. 91-18-PDR/91-14-PR
Dear Mr. Neimann:
Please find enclosed mapping information for the VAL VISTA SUBDIVISION located
in a portion the N 1/2 of the SW 1/4 Sec. 23, T.3N., R.1W., Ada County, Idaho.
More specifically, it is located on S. Ten Mile Road and north of W. Victory
Road.
The Preliminary Plat for the VAL VISTA SUBDIVISION was approved by the Ada County
Commissioners on June 6, 1991 (a copy of their approval letter will follow).
Therefore, in accordance with the Conditions of Approval, specifically, Item
No. 9, which addresses the need for the City of Meridian City Clerk and City
Engineer to approve the Final Plat; please find enclosed the following items for
your review:
1. Final Plat, Sheet 1 for Phase I, 7 copies.
2. Final Plat, Sheet 2 for Phase I, 3 copies.
3. Street Improvement Plans , three sheets for Phase I
4. Preliminary Plat for the total Val Vista Subdivision.
5. A Final Plat Submittal fee for Phase I in the amount of $70.00,
Check 111579 from Tester Farms.
Please review the enclosed information, and please call if you have any
questions.
Let me know when the Plat will be presented to the City Council, and I will plan
to attend.
Sincerely,
J-U-B ENGINEERS, Inc.
~ ~~~---
Gary A. ee, P.E./L.S.
Project /118000
GAL:Is
Enclosures
cc: Tester Farms, Inc.