HomeMy WebLinkAboutChange Order No. 2 with Hydro Logic, Inc. for Well 7 & 8 AbandonmentMemo To: Jaycee Holman; Tara Green From: Clint Worthington, P.E., Staff Engineer CC: Kyle Radek, P.E., Assist. City Engineer Warren Stewad, P.E., Engineering Manager Thomas Bany, P.E.G., Public Works Director Becky Licari, Administrative Secretary Date: July 9, 2009 Re: Proposed Agenda Item for July 21, 2009 City Council Meeting The Public Works Department respectfully requests the following item be placed on the April 21 City Council agenda, under Consent Agenda, for Council's consideration: Chancae Order No. 2 for Well 7 and 8 Abandonment. Additional work was required in the attempt to redevelop Well #8 which resulted in the need to abandon the well. Additional work was also required for the abandonment of Well #7. This change order consists of the following work: Additional work required in attempt to redevelop well #8 Well #8 abandonment Additional work required to extract well screen and preserve existing building coupled with additional grout volume required to abandon well #7. For a more detailed description of the additional required work please see the attached email from the consultant, Hydro Logic, Inc. The change order will be paid using funds from the Enterprise Fund for Surface Well Maintenance (60-3410-53310) Recommended Council Action: The Public Works Department recommends that City Council approves Change Order No. 2 for Well #7 and #8 Abandonment with Hydro Logic, Inc., for $8,434.98 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if o have n questions regarding this item. 7 / A • Page 1 CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83842 CONTRACT CHANGE ORDER Change Order No.: 2 Project Number: 780 Date: 7/8/2009 Effective Date: CONTRACTt7R: Hydro Logic, Inc. PROJECT: Well #T and #8 Abandonment 7Tie CoMractar is hereby directed to make the tollowirtg changes from the Contract Documents and Ptana. Desciption: 1) Additional work required ro Abandon Weti ii~7 2} Additional work requtred ro Redevelop wan N8 3) Abandonment of Weti Ife 4) Reason for Change Order: WeA #7 - Addiiianel work required to extract weU screen and preserve existing building coupled with additional grout volume required to abandon well. Well #8 -Additional work was required in the attempt to rehabilitate the well. The Weil was not able to be rehabilitated and abandonment was required. Attachments: Email from Hydro Logic, Inc, explaining change order. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMEti: Odglna) Contract Price: $15,000.00 Original Contract Completion Date: Original Contract Co anon Days: Net changes Conn precious C.O: s.: Net Da)ra change form previous C.O.'s: No. Q to 0 No. Q ro Q $0.00 Contras Pdce Prior ro this C.O.: Contract Completion Date before this C.O.: $15,000.00 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $8,434.88 Contrail Pdoe with aU Approved C.O.'s: Conlrad Completion Date with ell Approved C.O: s: $23,434.88 RC-COMHIEND N ST RUC noN MANAC3 R) ED (CO ACCEPTED ( OR-, ~ ~ } ' - ` , = : Y Date: / ~- 7 ~ C__® Y Gate: G 9 pip- . act APPROVED: (CRY PURL O At4 COUNCIL APPROVAL sy: Kelm welts ~ \`~ ' ~ ~~~ ~ ~ ,,/// ~ Data: ~~ ~ ~ _ Data: /~ ~//~ APPROVED: ATTES p r~O '~~ By: M or Ts y de eerd Oaro: ~ ~.t - ~ ~ By: Cily CI , _ y~ T Date: l .~ JJ ~~ 9~ r 15'~ • Q~`~1` /////~~rcO i i r ~~~~~~`\ ~ Page 1 of 2 Clint Worthington From: Ed Squires [ed@hydrologicinc.net] Sent: Monday, July 06, 2009 7:12 AM To: Clint Worthington Cc: Kyle Radek; Tom Barry; Rick Clinton Subject: 7-6-2009 Meridian Supply Wells #7 and #8 Abandonment Project Wrap Up and Change Order Attachments: 7-3-2009 Meridian #8 Well Bill.doc ~ ! - 1002 W. Franklin St. Boise, ID 83702 (2081342-8369 Fax: (208) 342-3100 Cell: (2081631-6781 Clint, As promised, I have sent out our final invoice for the Well #8 abandonment project by today's U.S. Mail including a tabulation and reconciliation of both project's (Well #7 and Well #8) total costs. As we have discussed, the well screen removal on Meridian Well #7 and the mid-project changes from abandonment to re-development to replacement and back to abandonment for Well #8 resulted in additional charges not anticipated by the original Task Order for the abandonment of both wells. This communication is intended to provide an overview of the reasons for the additional costs for the construction of a change order to cover the additional costs: 1) WELL #7: a. We originally estimated a simple abandonment for Well #7 at $ 7,500. b. To facilitate a better grout seal where casings were telescoped, and to recover 50 feet of reuseable stainless steel well screen, we had the the contractor successfiilly extract the well screen assembly (estimated recovery of ~$ 8K of screen in good condition). c. We also preserved the pump house for the Water Department and patched the concrete floor of the building. d. The total cost of abandonment of Well #7 is $ 9,135.95 including a large unanticipate grout volume and extraction of the well screens. e. The overage for this, above the original estimate is $ 1,635.95; well worth the cost for the improved abandonment and recovered well screens. Z) WELL #$: a. We originally estimated a simple abandonment for Well #8 at $ 7,500. b. This project commenced as an abandonment project and $ 2,898.64 was expended towards that goal. c. Parks Dept. inquired about re-developing the well as an irrigation well for the Main Street landscaping and Storey Park. d. Upon scraping, brushing, and swabbing the Well #8, severely corroded casing and sand production was observed. e. At this time, a replacement well project was considered, designed and costed with several meetings with the City. f. Toward the re-development and replacement well projects, $ 5,992.64 was expended including camera surveys and geophysical logs. g. Presented with the idea and cost of constructing a new ground water supply well for irrigation, the City elected not to pursue a new well. 7/8/2009 Page 2 of 2 h. The City then returned to the original well abandonment project and that work was completed for an additional cost of $ 5,407.75. i. The abandonment portion of the project cost $ 8,306.39 ; $ 806.39 over the original estimate including large unanticipated grout volume. j. The total overage for all Well #8 projects (above the original project cost estimate) is $ 6,799.03 3) CONCLUSIONS: a. The $ 1,635.96 overage on Well #7 is well worth the cost for the improved abandonment and $8,000-worth of recovered well screens. b. The Well #8 abandonment project exceeded its original budget by $ 806.39 including unanticipated and unforseeable grout volume. c. The Well #8 re-development and replacement projects cost $ 5,992.64. d. A Change Order is needed in the amount of $ 8,434.98 My best accounting of HLI invoices for these projects is attached above. All for now; let me know if you need more information from me. Ed 7/8/2009