HomeMy WebLinkAboutTask Order No. 2.2 with CH2M HILL, Inc. for Design Ferric Chloride Feed Facilities TASK ORDER N0.2.2 UNDER THE MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN AND CH2M HILL, INC. This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HILL, Inc. (ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for Professional Services, dated January 1, 2007. See Attachment A for the Scope and Fee for Task 2.2. All other terms and conditions of the original agreement will remain in full force and effect. IN WITNESS WHEREOF, the parties execute below: For CH2M HILL, Inc. dated this ~ day of , 2007. By: ~ Name Title For City of Meridian dated this da of ~r'Q'~'~-' , 2U0?, _ ,, -;. By: > foe ~.~+~-fo~'~ Pve./i`d'G(t-~ ( ' '; Attest: i " "~ " "' r William G. Berg, Jr. City Cler ' .: ,:~-' ;~'_ " ::• : ;~,t r' ~ ; ~: . .: ,, ~. Approved By City Council: :"~~o.c~ ~ ~'c-~~'~.'~~'~"~+e~'f ,'~,~~` r~ii, ~:', e, illlilt~~e~\ Attachment Q Scope of Services Project Understanding The Plant Optimization effort identified Chemically Enhanced Primary Treatment (CEPT) as a project the City of Meridian wanted to move forward on early. Ferric Chloride would be fed into the influent junction box upstream of the influent screens by flow-paced, metering pumps housed in a small storage shed. Secondary containment pallets will be provided under the pumps. Dosage rates would be determined by jar testing. A top entry mixer or mixing pump will be provided in the influent junction box to flash mix the solution. The chemical will be stored in a 5,000 gallon insulated, double-walled, cross-linked polyethylene tank on a concrete pad. The project will be constructed as a change order to an existing construction contract. Deliverables will be a change order package and not public bid documents. Scope of Work CH2M HILL will perform the tasks for design of the Ferric Chloride feed facilities as outlined below. Task 1-Project Management Project management includes project scoping, staff management, task coordination, monitoring project progress, preparing invoices, and ensuring project quality control.. Task 2--Preliminary Design CH2M HILL will perform jar testing on-site to determine the optimum chemical dosage. A five paddle stirrer will be rented locally for one day and jar testing will occur in the City's laboratory. A brief engineering report will be submitted to IDEQ which includes the results of the jar testing, a discussion of the effects on the biosolids system such as additional phosphorus loading and biosolids generationin. Task 3--Design 3.1 Equipment Sizing and Selection The flash mixing equipment and chemical feed pumps will be sized and selected based on the results of the jar testing. 3.2 Prepare Plans and Specifications Plans will be produced to allow the Contractor to price the work. Equipment specifications tiTill be noted on the drawings. The following is the anticipated list of dra~~ings: • Site Plan/Yard Piping • Section and Details • Structural Notes, and Details • Electrical Schedules & Diagrams 3.3 Project Review Meetings Four copies of 90% complete project documents will be provided for City review anti comment. City Comments will be incorporated into the final documents. 3.4 Cost Estimates Updated cost estimates will be provided with the drawing submittal Attachment B Compensation Level of Effort The task level of effort estimates are summarized in the following table. CH2M HILL has developed this level of effort estimate based on the work plan presented herein and assumptions stated previously. The fees will be billed as time and material, and will not exceed the total amount below without prior approval by the City. t.evel of Effort Task Description Total Task 1 Project Management $1702 2 Preliminary Design $4073 3 Final Design $13374 Summary -All Tasks $19,149 Schedule The schedule is listed below: • 90% design - 4 weeks after NTP • Final Documents will take 1 week after receipt of City comments