HomeMy WebLinkAboutChange Order No. 2 with Civil Survey Consultants for Well 27 DesignCITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 2 Project Numis3r. OS70C Date: 5/8/2009 Etfer~ive Date: CONTRACTOR: Ctvll Survey Consultants PROJECT: Well 27 Design The Contractor is hereby directed to make the following changes from the Contrail Documents and Plans. Desciptlon: 1) Additional design services needed m address IDEA requirements. Reason Tor Change Order: Provide design services that ware not antlcipated due fA changes in IDEA requirements and interpretation of regulatlor>s. Attachments: Letter of Request from Cnril Survey Consultants CHANGE IN CONTRACT PRICE: CHANGE 1N CONTRACT TIMES: Original Contract Price: $26,500.00 Origlrlal Contract Completion Date: Original Contract Com leUon Days: Net changes from previous C.O.'s.: Net Days change form previous C.O.'s: No. 0 to Q No. 0 to 0 $15.064.00 Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: $41,564.00 Net Increase (dea~ease) of this C.O.: Net Days Increass (decrease) of tttls C.O.: $2,804.41 Contract Price with all Approved C.O: s: Contract Completon Date with all Approved C.O.'s: $44,368.41 RECOMME ~(CONSTR ON MANAGER) ACC TOR) 1~ By: Bi'~.t'ivT ,gGAkF' By: ° 7j~'. !~ ~./ Date: .S _7 ZOV9 Date: ~S- ~ ~ APPROVED: (CITY PURL IN COUNCIL APPROVAL By: Keith Watts ~.7~ ii~ ~ ,., ~ ~~~~-{t Date: JL _~ ~,- y Date: e CCFF ~i ?l~` APPROVED: ~ iTY) ATTEST: r ~ By: yor Tamm eerd ~ By: City Clerk, Jaye Holman 9 Date: ~' , ®L, I Date:Jrr ~,) ";~. `SST t5'~ • ~ •~ C~ .,,..°.~'vrr,,,,~,~, Civil Survey Consultants, inc. Glenn K. Berndt, A.E..S. (208)888-4312 Presideat 1400 E. Watertower St Fax 888-0323 Suite 100 Timothy a Bums. P.E. Meridian, Idaho 83642 Vice Pnsidert May 5, 2009 Brent Blake City of Meridian 33 East Broadway Avenue Meridian, Idaho 83642 Re: City of Meridian -Weil No. 27 Dear Brent: During the review and approval process for We1127 the Idaho Department of Environmental Quality (IDEQ) added two new requirements to the project that were not include in our professional services agreement. These requirements added additional work effort and costs as follows: 1. IDEQ rejected our original plan submittal due to the fact that a Preliminary Engineering Report had not been submitted and approved. The requirement for the Preliminary Enginesring Report has been added since the original contract, and IDEQ would not accept your approved Master Plan as fulfilling the requirement even though Well 27 is specifically addressed in the Master Plan. This issue caused additional services in the amount of $1,050.00 as shown in our February 2, 2009 bitting. 2. IDEQ added the requirement that we install a pressure relief valve on the distribution side of the check valve. It is my professional opinion that IDEQ's position on this issue is not supported by the current version of IDAPA 58.01.08, and was a very broad interpretation of the regulations to support their requirement. This has not been a requirement on any of the previous well projects we have completed for Meridian. This issue caused additional services to address IDEQ's comments and make plan revisions in the amount of $1,754.41, which was included in the April 3, 2009 billing. I am requesting a supplement in the amount of $2,804.41 for these additional services. Please let me know if you need any additional infotmafion to support this request. Sincerely, .. ~, ~~~- 'r'im Burgess, P.E. ~~