Loading...
HomeMy WebLinkAboutCedar Springs No 3 FP 03-039BEFORE THE MERIDIAN CITY COUNCIL C/C 07/08/03 IN THE MATTER OF THE APPLICATION OF HOWELL- MURDOCH DEVELOPMENT CORPORATION FOR APPROVAL OF FINAL PLAT FOR CEDAR SPRINGS SUBDIVISION N0.3, LOCATED ON THE WEST SIDE OF N. MERIDIAN ROAD, NORTH OF W. USTICK ROAD, MERH)IAN, IDAHO CASE NO. FP-03-039 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code § 12-3-7 on July 8, 2003, and the Council fmding that the Administrative Review is complete which has included certain comments as stated in a letter to the Mayor and Council from Sonya Allen Planner I for the Planning and Zoning Department, and Bruce Freckleton, Engineering Technician III, and that Anna Powell Planning Director for the Planning and Zoning Department, and Dazen Fluke, commented at the hearing, and the Council having considered the requirements of the preliminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: The Final Plat of "CEDAR SPRINGS SUBDIVISION NO. 3" as evidenced in Plat bearing: "PLAT SHOWING CEDAR SPRINGS SUBDIVISION NO. 3, A PORTION OF ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CEDAR SPRINGS SUBDIVISION NO. 3 / (FP-03-039) Page 1 of 5 THE SE'/4, SECTION 36 TOWNSHIP 4 NORTH, RANGE 1 WEST, BOISE MERIDIAN MERIDIAN, ADA COUNTY, IDAHO 2003, F:1ProjectManagerslGAL111905\11905- Drafring\dwg111905FPl.dwg 06/03/03, SHEET 1 of 4, Howell-Murdoch Development Corp. - Developer, J-U-B Engineers, Inc. -Engineers Surveyors Planners", Howell-Murdoch Development Corporation -Developer, is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Bruce Freckleton, Engineering Technician III, and Sonya Allen Planner I for the Planning and Zoning Department, dated: City Council Date: July 8, 2003, listing 17 Site Specific Requirements/Final Plat and 4 General Requirements, a true and correct copy of which is attached hereto marked Exhibit "A", and consisting of four pages, and the additional requirements from the action of the Council taken at their July 8, 2003 meeting as follows, to-wit: 1.1 Comply with the Meridian Fire Department's requirements as follows: 1. One and two family dwellings will require afire-flow of 1,000 gallons per minute available for duration of 2 hours to service the entire project. Fire hydrants shall be placed an average of 400' apart. 1997 UFC Appendix III-A 2. Acceptance of the water supply for fire protection will be by the Meridian Water Department. 3. Final approval of the fire hydrant locations shall be by the Meridian Fire Department. 4. The phasing plan may require that any roadway greater than 150' in length that is not provided with an outlet shall be required to have a turn around. 5. All roads shall have a turning radius of 28' inside and 48' outside. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CEDAR SPRINGS SUBDNISION N0.3 / (FP-03-039) Page 2 of 5 6. Insure that all yet undeveloped parcels are maintained free of combustible vegetation per section 1103.2.4 of the Uniform Fire Code. Operational fire hydrants and temporary or permanent street signs are required before combustible construction begins. UFC 901.4.2 & 901.3 8. A minimum of two points of access will be required for any portion of the project, which serves more than 50 homes. UFC 902.2.1 9. Building setbacks shall be per the Building Code for one and two story construction. 1.2 The Central District Health Department requires after written approval from the appropriate entities aze submitted, they can approve this proposal for central sewage and central water; that plans must be submitted to and approved by the Idaho Department of Health and Welfare, Division of Environmental Quality for central sewage and central water; that run-off is not to create a mosquito breeding problem; and it is suggested that stormwater be pretreated through a grassy Swale prior to discharge to the subsurface to prevent impact to groundwater and surface water quality; that engineers and architects should obtain current best management practices for stormwater disposal and design a storrnwater management system that is preventing groundwater and surface water degradation. Manuals for guidance: 1. State of Idaho Catalog Of Stormwater Best Management Practices For Idaho Cities And Counties. Prepared by the Idaho Division Of Environmental Quality, July 1997. 2. Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works Department, May 2000. 1.3 The Nampa & Meridian Irrigation District requires the following: 1. A Land Use Change Application shall be filed for review prior to final platting. 2. All laterals and waste-ways must be protected. All municipal surface drainage must be retained on site. If any ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CEDAR SPRINGS SUBDNISION NO. 3 / (FP-03-039) Page 3 of 5 surface drainage leaves the site, the District must review drainage plans. 3. The developer must comply with Idaho Code 31-3805. 2. The fmal plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: The Plat dimensions are approved by the City Engineer; and 2. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review maybe filed. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CEDAR SPRINGS SUBDIVISION N0.3 / (FP-03-039) Page 4 of 5 By action of the City Council at its regular meeting held on the day of 2003. Attest: G. Berg, Jr., By: ~ a"""'~~""'1j11 ROBE T D. CORRIE `~.~°~.~`~ ~M~~~/,q~.lVlayor, City of Meridian .~,o °Ra r ~ Fd -_ BEAL 9 ~ r ~c ,~' ~T 7gS Copy served upon Applicant, the Plannin~'faiid'~:'o`ivng Department, Public Works De~3artment, and City Attorney. \\~~~~``OF '~ER~ JJf,,f ``Ut~ ~GOFtPOFdq ~~/q~/''~e~e. ` O By: A.~---~~ Dated: 7~~~03 = I, - = M Z:\WorklMNteridian\IvIeridian 15360NMedar Sprgs Sub No.3FP•03-03910rderFP.doc ,:,/9~9~~sr 1st • ~TZO`•\+ ,,;f caL,~T.~ , ,., 1111;!1;;;1 R11~", ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CEDAR SPRINGS SUBDIVISION N0.3 / (FP-03-039) Page 5 of 5 MRYD& Robert D. Come CITY COUNCIL MEMBERS Tammy deW'ee_rd - Kei[h Bird Cherie McCandless William L.M. Nary HUB OF TREASURE VALLEY - A Good Place tb Live - CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, IDAHO 83642 (208) 888.4433 ~ FAx (208) 887-4813 - - - City Clerk Office Fax (208).888-4218 - - LEGAL DEPA RTi~IENT (208)46fi-9272 Fax 466-4401 PUBLIC WORKS - BUILDING DEPARTMENT (208) 8985500 ~ Fax 887-1297 PLANNING AND ZONING DEPARTMENT. (208) 884-5513 ~ FA1C-888-6854 STAFF REPORT: City Council Date: July 8, 2003 To: Mayor, City Council and Planning & Zoning Commiss~ From: Sonya Allen, Planner I ~~ ~ - ~ -" y~~' ~. ~/ ~ m~F a ~.~ Bruce Freckleton, Senior Engineering Tech ~ .)~l ~ ~,~ Re: Cedar Springs Subdivision No. 3 U,rv OY -'r,/Jc- t, , • Request for Final Plat Approval of Ninety-Six (96) Building Lots and Seven (7) Other Lots on 38.59 Acres in an R-4 Zone for Cedar Springs Subdivision No. 3, byHowell-Murdoch Development Corporation (File No. FP-03-039) We have reviewed the above-referenced submittal and offer the following comments, as conditions of approval. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY The applicant, Howell-Murdoch Development Corporation, has requested approval for the third phase of Cedar Springs Subdivision, located on the west side of N. Meridian Road, north of W. Ustick Road. This phase includes 96 single-family building lots and seven. other lots on 38.59 acres at a gross density of 2.48 per acre. The submitted final plat complies with the approved preliminary plat (PP-00-018). Staff s failure to cite specific ordinance provisions or terms of the approved preliminary plat does not relieve Applicant of responsibility for compliance. LOCATION The subject property is located on the west side of Meridian Road, north of the Meridian Settlers Park location, and approximately 1/3 mile north of Ustick Road. SURROUNDING PROPERTIES North: Rural residential/agricultural property, zoned RUT (Ada County). South: Meridian Settlers Pazk, zoned L-O. East: Sundance Subdivision, zoned R-8. Cedar Spring, No3. FP Planning & Zoning Commission/Mayor & City Council Transmittal Date: July 3, 2003 Page 2 West: Rural residential/agricultural property, zoned RUT (Ada County). _ SITE SPECIFIC REQUIREMENTS/FINAL PLAT 1. Applicant is to meet all terms of the approved preliminary plat (PP-00-018) and development agreement (Inst. No. 102067381). 2. Submit compaction test results to the Meridian Building Department for any building pads within lots receiving engineered backfill. 3. Applicant shall comply with preliminary plat condition #2 (pg. 5) regarding the vacation of Venable Lane. The Vacation application shall be approved by the City of Meridian and Ada County Highway District prior to final plat signature by the City Engineer. 4. Any drainage areas (detention/retention basins) must be designed to ensure that water is retained only during 100-year storm events, and for a period of time not to exceed 24 hours. Side slopes within drainage areas shall not exceed 3:1. ~. Street s igns are t o b e i n p lace, water sy stem s hall b e a pproved a nd a ctivated,pressurized irrigation system approved and activated, drainage lots constructed, perimeter fencing installed, and road base approved by the Ada County Highway District prior to applying for building permits.. All development improvements shall be installed and approved prior to obtaining certificates of occupancy. A letter of credit or cash surety in the amount of 110% will be required for all fencing, pathways, landscaping, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the fmal plat. 6. Fencing adjacent to micropaths shall be installed per MCC 12-13-15-9 7. Landscaping is approved per the landscape plan dated 5/31/02, with two modifications: a. The six (6) Paper Birch trees shown on Sheet L-2 shall be replaced with a tree species permitted under MCC 12-13-7-1. b. No fencing over three (3) feet high, if solid, is permitted within 20 feet of any right-of--way line. There are several five-foot high fences shown adjacent to public streets on Sheet L-2 on common lots. These azeas shall be constructed in conformance with MCC 11-20-2. 8. Applicant shall submit a revised Landscape Plan for approval by the P&Z Department prior to City signature on the final plat. 9. Sanitary sewer service and municipal water to this development shall be via extensions from mains being installed in previous phases. Applicant will be responsible to construct the sewer and water mains to and through this proposed development, thereby making them available to adjacent properties. Subdivision designer to coordinate main sizing and routing with the Public Works Department. FP -03-°39 N ~~ ~~~ ~„ ~ O~ Cedar Sprin4s Na3. FP Planning & Zoning Coinmission/Mayor & City Council Transmittal Date: 7uly 3, 2003 Page 3 10. Applicant shall be required to -pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signahtre.on the final plat per Resolution 02-374. 11.Developer shall coordinate mailbox locations-with the Meridian Post Office. i2. The applicant has indicated that this phase. will be a continuation of the Settler's Irrigation District pressure irrigation system. being installed in previous phases, however staff believes this is an error since the pressurized imgation system is own and maintained by the Nampa & Meridian Irrigation District. The City of Meridian requires that pressurized irrigation systems be s upplied b y a year-round s otuce o f w ater. If a c reek o r w ell s ource i s n of a vailable, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the Meridian City Engineer. 13. Complete the Certificate of Owners and accompanying Acknowledgment 14. Add adjacent platted subdivision names to Sheet 2 of 4 of the plat. 15. Label the "RPOB" on Sheet 2 of 4, and add "UNPL,ATTED" along the north and west boundaries. 16. The sum of the '/~ right-of--way dimensions shown on the east end of W. Welch Street don't equal the distance along the subdivision boundary. 17. Please add or revise the following plat notes: • Note #7. ."All buildable lots, extent for Lot 11, Block 25, are for single family dwellings only. Lot 11, Block 25 shall be desienated as a future elementary school lot • Also revise Note #7 to read 1j400 s.f, not 1,401. • Note #12.....Instrument No. • Note #13.....Instrument No. • Note #8 ...Add Lot 9, Block 24... • Add a note pertaining to the "Right to Farm Act" GENERAL REQUIREMENTS 1. Tile all imgation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous 1o the area being subdivided per City Ordinance 12-4-13. Submit written confirmation of plan approval from the appropriate irrigation/drainage district, or lateral users association to the Public Works Department. 2. Remove any existing domestic wells and/or septic systems within this project from their domestic service per City Ordinance Section 9-1-4 and 9-4-8: (Wells may be used for non-domestic purposes such as landscape irrigation.) FP-03-039 ~/ ~~~ ~~ ~/ ~ ~ 7 Cedar Springs NoJ. FP Planning & Zoning Commission/1Vlayor & City Council - Transmittal Date: July 3, 2003 . Page 4 - 3. Install 250-watt and 100-watt, high-pressure sodium streetlights at locations designated by the Public Works Department. Street light contractor shall obtain an approved design and permit from the Public Works Department prior to commencing installations. 3. Replace any tree over four (4) inch caliper that is removed from the property with an equivalent number of caliper inches of trees. (Required landscape buffer trees will not be considered as replacement trees for those trees that have to be removed.) 4. Coordmate with the P/Ieridian Public Works Department and the Meridian City/Rural Fire Department to determine fire flow requirements. Provide a letter from the Fire Department stating required fire flow requirements prior to final plat approval. RECOMMENDATION Staff recommends approval of the final plat, with the above stated comments and conditions. !P -03-039 •6 •¢ ~~ ~ ~ ~ • Ceder Springs No3. FP