Loading...
HomeMy WebLinkAboutTask Order No. 10002a with CH2M Hill, Inc. for Odor Control Preliminary Design (2)TASK ORDER NO. 1~02a UNDER THE MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN AND CH2M HII.L, INC. This Task order is entered into by and between City of MERIDIAN (OWNER) and CH2M HILL, Inc. (ENGINEER), according to the terms and conditions of the Master Agreement (AGREEMENT) for Professional Services, dated January 1, 2007. See Attachments A and B for the Scope and Fee for Task 10002x. All other terms and conditions of the original agreement will remain in full force and effect. IN WITNESS WHEREOF, the parties execute below: For CH2M HILL, Inc. dated this day of ~/~ , 2009. By: ~.-- !/ Name Title For City of Meridian dated this ~ ~l day of , 2009. Attest: Tammy de Weerd, Mayor rFo wee Ho~lan~ty Clerk: '~""`~'+'' ~ ~ ®o Approved By City Council: ''~ 9Q 1' ~~ • Q~.~~~ -nni~~~ C aS~ ~~~'1 u`~.Q ~.v ~• ~~ ~ Pubrlic Works Task Order 10002a Attachment A Scope of Services Odor Control Preliminary Design Project Understanding The City of Meridian would like to control odors from the Headworks at their wastewater treatment plant. A meeting on Apri18, 2009 concluded that a building over the headworks is desired, but the installation of future screens needs to be considered in the building layout. Biofilters or Bioscrubbers are the preferred treatment equipment of choice, and further refinement of the two technologies is needed. Additionally, odor control for the primary clarifier sputter box needs to be considered as part of the odor control solution. Sampling of the airspace around the sputter box and primary clarifier weirs to determine the extent of odor generation is needed. A Preliminary Design Report summarizing the recommended course of action for odor control facilities will be prepared and submitted to IDEA. Scope of Work CH2M HILL will perform the following tasks as part of this scope of work Task 1-Project Management Project management includes project scoping, staff management, task coordination, monitoring project progress, preparing invoices, and ensuring project quality control.. Task 2 Treatment Technology Evaluations Bioscnubbers and inorganic biofilters will be evaluated in detail including developing preliminary layouts and providing detailed order of magnitude cost estimates. The results of the analysis will be included in the Preliminary Engineering Report submitted to IDEQ. Task 3-Building Evaluation The feasibility of installing internally fed band screens into the existing channels in the future will be reviewed. The results of the analysis will be included in the Preliminary Engineering Report submitted to IDEQ. Task 4-Primary Clarifier Sputter Box Odor Control Evaluation Air sampling around the Primary Clarifier Sputter Box will be conducted to determine if any odor problem exists. Ahand-held Jerome meter will be used to measure grab samples of H25 at the Sputter Box. If objectionable levels of H2S are found, odor control measures will be provided for the sputter box. The results of the analysis will be included in the Preliminary Engineering Report submitted to IDEQ Task 5 -Preliminary Engineering Report An Engineering Report summarizing the preliminary design effort, will be prepared in accordance with IDAPA 58.01.16, Wastewater Rules, and submitted to IDEQ. The Engineering Report will include the following sections: • Coordination With Existing Facilities • Design Criteria • Site Evaluation and Layout • Process Units • Instrumentation and Control System • Regulatory and Code Review • Cost Estimate • Schedule CH2MHILL will submit the draft report to the Owner for review. Review comments will be incorporated and two copies will be submitted to IDEQ Boise Regional Office for review and approval. Attachment B Compensation level of Effort The task level of effort estimates are summarized in the following table. CH2M HILL has developed this level of effort estimate based on the work plan presented herein and assumptions stated previously. The fees will be billed as time and material, and will not exceed the total amount below without prior approval by the City. Level of Effort Task Description Total Task 1 Project Management $3,696 2 Treatment Technolog~r Evaluation $6,699 3 Building Evaluation $6,384 4 Sputter Box Evaluation $5,028 5 Preliminary Engineering Report $15,093 Summary -All Tasks $36,900 Schedule The schedule is listed below: Draft PER submitted to City - 4 weeks after NTP • Draft PER submitted to IDEQ - 2 weeks after receipt of City comments