HomeMy WebLinkAboutTask Order No. 10002a with CH2M Hill, Inc. for Odor Control Preliminary DesignMemo Ta: Jaycee Holman; Tara Green lF~am: Roxanne Holland, E.I.T., Staff Engineer CC: Clint Dolsby, P.E., Assistant Ciiy Engineer Date: May 27, 2009 Re: Proposed Agenda Item for June 2, 2(309 City Council Meeting The Public Works Department respectfully requests the following item be placed on the June 2 City Council agenda, under Consent Agenda, for Council's consideration: Task Order No. 10002a -Odor Control Preliminary Design. CH2M Hill, Inc. has submitted a task order, scope of work, and budget for the engineering services. They propose to complete the work for $36,900. This work will be done in accordance with the {:H2M Hill Master Agreement for Professional Services dated January 1, 2007. This project is required to control excessive odor from the Headworks at the WWTP. The scope of work includes treatment technology evaluations, !wilding evaluation, primary clarifier splitter box odor control evaluation and a preliminary engineering report. Recommended Council Action: The Public Works Department recommends that City Council approves the contract for Task Order No. 10002a -Odor Control Preliminary Design with CH2M Hill, Inc. for $36,900 and authorize the Mayor to sign it. Thank you for your consideration. Please contact me if you have any questions regarding any of these items. • Page 1 TASK URDER ti0. 10002a UNllER THE MASTER AGRF,EMENT )FC)R PRQI:ESSIONAI, SERVICES BETWEEN CITY C?F MERIDIAN AND CH2M HILL, INC. 't'his Task order is entered into by and between City of :MERIDIAN ({}WNER) and (:H2NE HILL, Inc. (ENGINEF,R), according to the terms and conditions of the Master Agreement (AGREEMF.Tv'T) for Professional Services, dated January t , 20(37. See Attachments A and E3 for the Scope and Fee for Task IUUU2a. Alt other terms and conditions of the original agreement will remain in full force and effect. IN WITNESS WHEREOF, the parties execute below: ForCH2M EIILL, lnc. dated this ~ day of_~/~'`f. __........... _. _ ., 2UU9. name Title For City of vlcridian dated this _. day of _ _ _ _ _ _ _ . , 2009. HY~~__ ._ _. _ _..._ _ __ Tammy do Wccrd, Mayor Attest.: __ . _ Jaycee Holman, City Clerk Approved Ely City Council: Purchasing ~-~Qa..Q ~ •2~ •~~ ubl c arks Task order 10002a Attachment A Scope of Services Odor Control Preliminary Design Project Understanding The City of Meridian would like to control odors Erom the l leadworks at their wa~;tewater treatment plant. A meeting on Aprii 8, 20(?9 conrludcd that a building over khc headworkti is desired, but the installation of future scrcr_ns needs tcs be considered in the building layout. 13iofilters or 13iuSCrubbcrs are the preferred treatment equipment of choice, and further refinement of the two technologies is needed. Additionally, odor control for the primary clarifier sputter box needs to be considered as part of the odor control solution. Sampling of the airspace around the sputter box and primary clarifier weirs to determine the extent of odor generation is needed. A Preliminary Design Report summarizing the recommended course of action for odor control facilities will bc: prepared and submitted to 1DEQ. Scope of Work Cl l2M H1LI.~ will perform the following tasks as part of this scope of work. Task 1-Project Management Project management includes project scoping, staff management, task coordination, monitoring project progress, preparing invoices, and ensuring project quality ccyntrol.. Task 2-Treatment Technology Evaluations iiioscrubbers and inorganic biofilters wilt be evaluated in detail including developing; preliminary layouts and providing detailed order of magnitude cost estimates. The results of the analysis will be included in the Preliminary Engirtc~ring Report submitted i:o IUEQ. Task 3~-•Building Evaluation The feasibility of installing internally fed band screens into the existing channal:; in the future will be reviewed. ~111e results of the analysis will be included in the Preliminary Engineering Report :submitted to IDEQ. Task 4r-Primary Clarifier Spiitter Box Odor Gontrol Evaluation Air sampling around the 1'rsmary Clarifier Spiitter &~x will be ec>nducted to determine if any odor problem exists. Ahand-held Jerome meter will be used to measure grab samples of H2S at the Spiitter Rox. If Objectionable levels of H2S are found, odor control measures will be provided for khe splitter box. Thc> results cif the analysis wilt be included in the Preliminary Engineering RHport submitted to IDEA Task ~ -Preliminary Engineering Report An Engineering Report summarizing the preliminary design effart, will be prepared in accordance with [[?Al'A 58.Ol.lb, Wastewater Rules, and submitted to II~E.Q, The Engineering Ctepart will include the fallowing sections: • Coordination With Existing Facilities • I?esign Criteria • Site Evaluation and Layout • Process l; nits • Instrumentation and Control System • Regulatory and Code Review • Cost Estimate • Schedule CH2Vil-iILL will submit the draft mport to the Owner for review. Review comments will be incorporated and two copies will be submitted to IUEQ Cioisc~ Regional office for rcwiew and approval. Attachment B Compensation Level of Effort The task level of effort estimates are summarized in the following table. CI i2M F IIt.T, has developed this level of effort estimate based on the work plan presented herein anal assumptions Stated previously. The fees will be billed as time and material, and will not exceed the total amount below without prior approval by the City_ Level of Effort Task Description Total Task 1 Project Management $3,696 2 , Treatment Technology Evaluation $6,699 3 4 5 Building Evaluation Sputter Bax Evaluation ~~____..__ Preliminary Engineering Repoli Summary -Ail Tasks $6,384 $5,028 -~ _. $15,093 $36,9Q0 Schedule The schedule is listed below: C3raft I'ER submitted to City - ~ weeks after N'T1' Draft PEK submitted to TDEQ - 2 weeks after rE~reipt of City comments