Loading...
HomeMy WebLinkAboutTrailway Park AZ 03-010Page 1 of 1 Sharon Smith From: Wendy Kirkpatrick [Idrkpatw~meridiancity.org] SeM: Thursday, July 03, 2003 1:46 PM To: Sheron Smith; J. Johnson; Tara Green; Will Berg Cc: es-beckym@gwestnet Subject: Trailway Park Recs RECEIVED JUL - 3 2003 City Of Meridian City Clerk OtTice Sorry about the confusion over the deadline. Please give Councii paper copies of the Trailway recs. Call me with any questions. Wendy 7/3/2003 rn' nr y^e,' erl~icn Project Name: Case No(s).: Applicant: STAFF SUMMARY OF PLANNING AND ZONING COMMISSION RECOMMENDATION TO CITY COUNCIL Trailway Park Subdivision ~~ tlE IVE D PP-03-011/ AZ-03-010 /CUP-03-021 JUL - 3 2003 Hillvew Development Corporation, LLC P&Z Commission Hearing Date: June 5, 2003 City Of Meridian City Clerk Office Recommendation: Approve with conditions Summary of Public Hearing: 4 members of the public either testified in opposition or expressed concerns about the project • 0 members of the public testified in support of project Key Commission Changes to Staff Recommendation: • Recommended exempting applicant from required 35' landscape buffer between the existing meat packing plant (and lagoons) and the proposed attached family homes located at the western edge of the proposed subdivision. • Recommended exempting applicant from dimensional standards (10' pathway with 5' of gravel on each side of pathway) for the regional pathway recommended by the Park Department Require Bain Outstanding Issues for City Council: • Determine whether applicant should be required to provide a 35' buffer between the proposed subdivision and existing meat packing plant. • Determine whether applicant must construct regional pathway to dimensional standards recommended by Meridian's Parks Department. BEFORE THE PLANNING AND ZONING COMMISSION IN THE MATTER OF THE REQUEST FOR ANNEXATION & ZONING OF 39.15 ACRES TO R-8 ZONE FOR Trailway Park Subdivision Case No. AZ-03-010 RECOMMENDATION TO CITY COUNCIL Hillview Development Corporation, Applicant JUL - 3 2003 City Of Meridian City Clerk Office The property is approximately39.15 acres in size and is generally located on E. Blue Heron Road, north of Fairview Road and E. of North Meridian Road , Meridian. The property is designated as RUT. 2. The owner of record of the subject property is Raleigh and Dieuw Hawe and Hillview Development Corporation. 3. Applicant is Hillview Development Corporation. 4. The subject property is currently zoned RUT. 5. The Applicant requests the property be zoned as R-8 . 6. The subject property is bordered to the north by asingle-family residential subdivision to the south by a Mobile Home Pazk, to the east by asingle-family residential subdivision, and to the west by a meat packing plant a residential subdivision. 7. The property which is the subject of this application is within the Area of Impact of the City of Meridian. 8. The entire parcel of the property is included within the Meridian Urban Service Planning Area as defined in the Meridian Comprehensive Plan. 9. The Applicant proposes to develop the subject property in the following manner: A Planned Development consisting of One-hundred and Forty-five Single-family detached lots and Sixteen Single-family attached lots, one "Neighborhood" park and Twenty-three Common Lots. RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Pazk Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 1 10. The Applicant requests zoning of the subject real property as R-8 which is consistent with the Meridian Comprehensive Plan Generalized Land Use Map which designates the subject property as Mixed Use -Neighborhood. 11. There are no significant or scenic features of major importance that affect the consideration of this application. 12. The Planning and Zoning Commission recognized the concerns of Wendel Bigham, Supervisor of Facilities and Construction for Joint School District No. 2, in a letter dated Apri124, 2003. RECOMMENDATION The Meridian Planning and Zoning Commission hereby recommends to the City Council of the City of Meridian that they approve the preliminary plat as requested by the applicant for the property described in the application, subject to the following: A. Adopt the Special Recommendations of the Planning and Zoning Commission as follows: Delete items 5 and 6 from of staffls Site Specific Comments for the Preliminary Plat. Strike the last sentence from staff comment item 9 from staffs Site Specific Comments for the Preliminary Plat. Add the following comments: Require applicant to work with Mr. Feathergill and the Nampa-Meridian Irrigation Association to remove the headgate on Mr. Feathergill's property. Require applicant to put a jungle gym and a slide on tot lot. B. Adopt the Recommendations of the Planning and Zoning and Engineering staff as follows (changes recommended by the Planning and Zoning Commission aze not reflected in staff recommendations listed below): SITE SPECIFIC COMMENTS /PRELIMINARY PLAT Sanitary sewer and water service to this site shall be via main line extensions from the existing mains adjacent to the property. Applicant will be responsible for RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Pazk Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 2 constructing the sewer and water mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall retain and protect, or restore the gravel access road over the existing sanitary sewer main that traverses across the southern boundary of the development. The back lot lines of lots 25 and 27, block 6 need to be adjusted to provide a minimum of 10-feet clearance to the existing sanitary sewer main. 2. The preliminary plat map indicates that there are at least two ditches within the boundaries of the development, however no details or notations have been provided to indicate how they are going to be dealt with. Please provide information. 3. The applicant has indicated that the pressurized irrigation system within this development, will be owned and maintained by the Nampa & Meridian Irrigation District. The system is going to be served by an existing NMID pumping facility in the Fothergill Point Subdivision. The applicant has indicated that they will be upgrading the capacity of the existing pumping facility to handle the Trailway Park Subdivision. Underground veaz-round pressurized irrigation must be provided to all lots within this development. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. Applicant shall be required to utilize any existing surface or well water for the primary source. If a surface or well source is not available, asingle-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the Meridian City Engineer. 4. A detailed fencing plan shall be submitted upon application of the final plat. A solid fence shall be required around the perimeter of the subdivision unless the City agrees in writing that such a fence is not required. fencing adjacent to the proposed pazk shall be 4' in height (to increase the visibility of the park) and depicted in the fencing plan. A note restricting the fencing adjacent to the park shall be added to the Final Plat. 5. A detailed landscape plan shall be submitted with the final plat application. The detailed landscape plan shall include a 35' landscape buffer between land uses adjacent to west side of Block 9. The property located directly west of Block 9 of the proposed subdivision is used as a manufacturing plant (meat packing), Meridian's City Code requires that a 35' buffer be created between a manufacturing facility and residential development. RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Park Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 3 6. Revise pathway to include 5' of gravel on each side of the pathway. The Meridian Parks Department's pathway standards recommend that pathways be constructed with 5' of gravel on each side of the pathway. The Parks Department is recommending that these standards be applied to the pathway in the Trailway Subdivision. A significant reason for the establishment of these pathway standards is pathway maintenance. The equipment used to spray the gravel adjacent to the pathway is designed for a pathway with a 5' gravel shoulder. 7. Add or revise the following preliminary plat notes: •Add a note to the face of the plat that requires any re-subdivision of this plat to be in compliance with the most recently approved subdivision standards of the City of Meridian. •Add a note to the face of the plat that restricts fencing adjacent to the pathways within the subdivision to being no greater than four feet in height if solid sight- obscuring material is used for fence construction. 8. Ten (10) copies of a revised plat shall be submitted to the City Clerk's Office at least ten days prior to the next public hearing for this plat. 9. Micro-paths in the following locations: Extend the proposed pathway to connect with the southeast comer of Lot 2, Block 6 and E. Willow Brook Dr. This connection will improve the access to the pathway for residents of the eastern part of the subdivision And provide a micropath through lots 11 and 19 of Block 5 to improve access to the proposed pathway for residents. 10. Change ROW on James Court to 50' per the request of ACHD. 11. Add a Note stating that common lots owned and maintained by the homeowner's association. 12. Remove existing gravel road from the proposed park (Block 9, Lot 3) or integrate gravel road into the proposed pathway. 13. Please submit all updated groundwater/soils monitoring data to the Public Works Department for review. The original study report indicates that shallow groundwater may be a factor, particularly in the northwest comer of the development. Any drainage areas (detention/retention basins) must be designed to ensure that water is retained only during 100-year stone events, and for a period of time not to exceed 24 hours. Side slopes within drainage areas shall not exceed 3:1. The project engineer should pay close attention to the results of field studies determining the groundwater, soil type & and characteristics during the design and construction phases. The engineer shall be required to certify that the RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Pazk Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 4 street centerline elevations are set a minimum of 3-feet above the highest established normal groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above groundwater. GENERAL COMMENTS 1. Please submit a copy of the Ada County Street Name Committee's approval letter for the subdivision name, and the lot and block numbering. Make any corrections necessary to conform. 2. Coordinate fire hydrant placement with the City of Meridian Public Works Department. 3. A letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, play equipment, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. 4. All micro-paths within the proposed subdivision shall be designed in accordance with MCC 12-13-15 "Micropath Landscaping". 5. A detailed landscape plan, in compliance with the landscape ordinance shall be submitted for the subdivision with the final plat application. 6. Sidewalks within the proposed subdivision shall be built in accordance with MCC12-13-10-8. 7. 100-watt, high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs aze completed by Idaho Power Company. The street light contractor shall obtain design and permit from the Public Works Department prior commencing installations. 8. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per City Ordinance 12-4-13. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owner's), with written approval or non-approval submitted to the Public Works Department. If lateral users association approval can't be obtained, plans will be reviewed and approved by the meridian City Engineer prior to final plat signature. RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Pazk Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 5 9. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. 10. Developer shall coordinate mailbox locations with the Meridian Post Office. 11. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells maybe used for non-domestic purposes such as landscape irrigation. 12. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 13. Applicant's engineer will be required to submit a signed, stamped statement certifying that all street fmish centerline elevations are set a minimum of three feet above the highest established normal geoundwater elevation. C. Adopt the Recommendations of ACRD as follows: A. Site Specific Conditions of Approval Dedicate 42-feet ofright-of--way on Blue Heron Lane and provide a public right's-of--way road trust deposit for one-half of a 29-foot street section with curb, gutter and 5-foot concrete sidewalk, provide 24-feet of pavement as well as the appropriate amount of fill required to fill the Jackson Drain on Blue Heron Lane (from the west property line to Eureka Avenue). 2. Construct East James Court (from the West property line to North Eureka Place) as a 40-foot street section with vertical curb, gutter and 5-foot concrete sidewalk within 60-feet ofright-of--way, as proposed. 3. Construct East James Court (from North Eureka Place to East Cougar Drive) as a residential collector with a 36-foot street section with vertical curb, gutter and a detached 4-foot concrete sidewalk (within an easement) within 50-feet ofright-of- way, as proposed. Front on housing and parking is prohibited on this roadway. 4. Construct the internal roadways as 36-foot street sections with curb, gutter and sidewalk within 50-feet ofright-of--way, as proposed. Construct a 5-foot attached on the majority of the internal roadways, with the exception of a 4-foot detached sidewalk on East Cougar Drive (from East Chateau Drive to East Blue Heron Street), James Court (from North Eureka Avenue to East Cougar Drive) and East Chateau Drive (from East Cougar Drive to North Grouse Avenue), as proposed. RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Pazk Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 6 5. Extend East James Court from the west property line approximately 430-feet north of the south property line, as proposed. 6. Extend East Willow Brook Drive from the east property line approximately 100- feet north of the south property line, as proposed. Extend Blue Heron Street from the east property line approximately 100-feet south of the north property line, as proposed. 8. Extend Cape cod Way from the north property line approximately 370-feet west of the east property line, as proposed. 9. Extend North Eureka Avenue from the North property line approximately 100- feet east of the west property line, as proposed. 10. Extend Blue Heron Lane from the west and north property lines, as proposed. 11. Construct one cul-de-sac turnaround at the north end of Eureka Place, as proposed. Provide a minimum fuming radius of 45-feet. 12. Construct a cul-de-sac turnaround with a center island located in the southeast corner of Elbridge Street and Arrow Wood Way, as proposed. Provide a minimum turning radius of 45-feet and provide a minimum of a 29-foot street section on either side of the proposed center island. Construct the island a minimum of 4-feet wide to total a minimum of a 100-square foot area. 13. Construct two knuckles within the subdivision, as proposed. The design shall be reviewed and approved by ACHD's Development staff. 14. Any proposed landscape islands/medians within the public right-of--way dedicated by this plat shall be owned and maintained by a homeowners association. Notes of this shall be required on the final plat. 15. Direct lot access to this segment of James Court (from the west property line to Cougar Drive) is prohibited. 16. Comply with all Standard Conditions of Approval. B. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of--way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Park Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 7 Replace any existing damaged curb, gutter and sidewalk and any that maybe damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #197, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of--way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1- 800-342-1585) at least two full business days prior to breaking ground within ACHD right-of--way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a RECOMMENDATION TO CITY COUNCIL FOR APPROVAL OF REZONE FOR Trailway Pazk Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 8 waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. D. Adopt the Meridian Fire Department Recommendations as follows: 1. That afire-flow of 1,000 gallons per minute be available to service the entire project. Fire hydrants shall be placed an average of 500' apart. 1997 UFC Appendix III-A 2. Operational fire hydrants and temporary or permanent street signs aze required before combustible construction begins. UFC 901.4.2 & 901.3 3. The location of the fire hydrants shall be approved by the Meridian Fire Department and shall be submitted thru the Public Works Departments. 4. All radii shall be 28' inside and 48' outside radius. 5. According to a report completed by Fire & Emergency Services Consulting Group in February of 2000 our requests for service are projected to reach 2800 in the yeaz 2005 and 3800 by the year 2010, this is up from 2069 responses in the year 2000. 6. Provide an approved turnaround for all streets greater than 150' in length that have no outlet. This may be an issue during the phasing of the project. E. Adopt the Recommendation of Nampa & Meridian Irrigation District as follows: 1. Nampa & Meridian Irrigation District requires aland-use change application. All storm drainage must be retained on site. All lateral and waste ways must be protected. The Developer must comply with Idaho Code #31-3905. 2. Nampa & Meridian's Jackson Drain courses through the center of the proposed project. The easement of the Jackson Drain must be protected and any encroachment without approved plans and a signed license agreement is unacceptable. RECOMMENDATION TO CITY COUNCII. FOR APPROVAL OF REZONE FOR Trailway Park Subdivision BY Hillview Development Corporation AZ- 03 -010 Page 9