Loading...
HomeMy WebLinkAboutTask Order No. 0642C with Civil Survey Consultants, Inc. for Ten Mile Road Cherry Lane to Ustick Rd. Utility Improvements TASK ORDER NO. 0642C CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS INC. (ENGINEER) This Task Order is issued by Owner and accepted by the Engineer pursuant to the mutual promises, covenants and conditions contained in the Agreement between the above named parties dated November 8, 2006. CITY OF MERIDIAN TEN MILE ROAD (CHERRY LANE TO USTICK ROAD) UTILITY IMPROVEMENTS PURPOSE The Engineer's scope of services, time of completion and compensation shall be as set forth herein. Services shall generally be described as Engineering Consulting Services. TASK 0642C - D®sign and Construction Per the City's request, the Engineer will provide professional engineering services related to the design of adjustments to the existing water and sewer systems and the design of new Class A reuse main to be constructed in conjunction with Ada County Highway District Project No. 503023 RD188. The engineer proposes to provide the following under this scope of services: A. Water System Improvements: 1. Adjust approximately thirty-three existing valve boxes to grade. 2. Adjust approximately 15 water mains or water services where conflicts exist with new storm drain or irrigation pipes. 3. Remove and relocate two fire hydrants. 4. Install one new fire hydrant. 5. Design service extensions as requested to parcel at 2220 Ten Mile Road. B. Sewer System Improvements: 1. Extend existing sewer stub at 2220 Ten Mile Road to the new right-of-way line. 2. Design service extension as requested to parcel at 2220 Ten Mile Road. C. Class A Reuse Improvements: 1. Design approximately 5700 lineal feet of 16" main in Ten Mile Road within ACRD project limits. 2. Design approximately 500 additional lineal feet of 16" main outside of the project limits to extend the system to the cities wastewater treatment plant entrance. Topographic survey will be completed as required to extend main outside roadway project limits. 3. Design approximately 500 additional lineal feet of 16" main outside of the project limits to extend the system south through the Cheny Lane and Ten Mile Road Intersection. Topographic survey will be completed as required to extend main outside roadway project limits. 4. Design stubs that extend to the east on Ustick Road and to the west an Muirtield Drive. Stubs shall be extended to the roadway project limits. D. Street Lights: 1. Relocate eight existing street lights. Engineer will send a letter to the property owner at 2220 Ten Mile Road advising them of the project. The letter will advise them that the City will install a service stub to their property at their request. Plans will be prepared once the City has obtained permission from ACHD to use their electronic files of the roadway design for utility design purposes. The City will request that ACHD add the new utilities to their Army Corps of Engineer 404 permit application for Nine Mile Creek. Engineer will prepare and submit Five Mile Creek crossing 404 permit application to Army Corps of Engineer and Idaho Department of Water Resources. We anticipate that a license agreement will be required from the appropriate Irrigation District for the Class A reuse main in Ten Mile Road crossing Nine Mile Creek and Five Mile Creek. Engineer will prepare any documents required for the license agreement for execution by the City of Meridian and Irrigation District and will coordinate execution of the agreement. Any license fees will be paid by the City of Meridian. Engineer will submit the plans to ACHD and QLPE for review and approval prior to construction. A copy of the plans will also be sent to Qwest Communications, Intermountain Gas Company, Cable One, and Idaho Power Company for review prior to construction. Engineer will prepare one set of plans and specifications far the City's use in bidding and constructing the project. Engineer will assist the City of Meridian in advertising the project #or bids, be available to answer questions during the pre bid period, attend the bid opening, and assist in the award of the contract. All construction contracting, administration, and inspection will be provided by the City of Meridian It will be the City's responsibility to negotiate and execute the Joint Effort Agreement for construction with ACRD. Engineer proposes to provide 40-scale plans on 22°x34° sheets. Plan set will include a cover sheet, a general note sheet, ten plan and profile sheets, and twa city standard detail sheets. The total set is anticipated to include 14 sheets. Record drawings will also be prepared as per the City of Meridian Acceptance of Record/Electronic Drawings requirements dated February 7, 2007. The engineer will provide one set of construction stakes for fire hydrants, blow-offs, service stubs, new mainline valves, and relocated street light locations as shown on plans. TIME OF COMPLETION Engineering services will be completed as needed to construct improvements in conjunction with Ada County Highway District Project No. 503023 RD188. COMPENSATION The Not-To-Exceed amount for this Task Order No. 0642C is Forty-Five Thousand Seventy dollars ($45,070.00). The hourly rate for services and direct expenses is per the previously approved Prevailing Fee Schedule Effective October 1, 2006, and by this reference made a part hereof. Construction services are not covered under this Task Order. CITY OF MERIDIAN BY: TA Y de W RD, MAYOR Attest: JAYCEE F~L~i~l, CITY Apprvvect by City Courtci6 ENGINEER BY: MO A. BU E S, VICE PRESIDENT Civil ter~vay ~®ra~ultartt~ an®H~ur n fee E~tirnate City a~ aridian Taak rar 2C Tan ila ®ad -Cherry L.arae t~ Usti~k Task Description Project Mena er Design En ineer 1 Technician I Technician II GPS Total 9. Coordination and Meetin s 6 16 22 2. Cover Sheet 1 4 4 3. General Note Sheet 1) 4 4 4. Plan and Prafile Sheet {10) 200 200 5. Standard Detail Sheets (2) 4 4 6. 5 ecial Provisions ~ Estimate 20 20 7. ACRD Coordination 8 8 8. Pro a Owner Coordination 8 8 9. Review and royal 4 16 20 10. License A regiment 32 32 11. Topo Surve 20 16 16 16 68 12. Shop Drawin Review 12 12 13. Construction Stakin 24 24 24 72 14. Record Drawin s 24 16 16 16 72 15. Remove Items from ACRD Plans 24 24 Total Man-Hours 10 392 56 56 56 570 Classification Hours Rate Tatal Pro'ect Mana er 10.00 $105.00 = $1,050.00 Desi n En ineer 1 392.00 $85.00 = $33,320.00 Desi n/Surve Technician I 56.00 $70.00 = $3,920.00 Desi n/Surve Technician IE 56.00 $65.00 = $3,640.00 Labor Subtotal 514A0 $41,930.00 Classification Hrs/Miles Rate Total Misc. Printin $400.00 GPS 56.00 $40.00 = $2,240.00 irri ation District La er Fees $500.00 Direct Subtotal $3,140.00 Total Estimated Fees $45,070.00 taskorder0642C.xis