HomeMy WebLinkAboutChange Order No. 1 with Paul Construction, Inc. for Settler's Village Square Phase 1CITY ®F ERI®
33 E T 13R® AY AVE.
EI~It~IN, l0~ X32
T T H FEE
Pio. 2 through ~.
~~ ~~
Change Order Plo.: 9
Project Plumber I$KS Q0
pate: 17J91200
Eilective date:
$5T1,97~.'F6
RECOMMENDED: {CITY CAPITAL PROJECTS AGER} pat®:
ACCEPTED {CITY DlViSlON REPRESENTATIVE} AC TED (CONY CT
Date: a ¢~~ £-€ -'~ pat@: '~
APPROVED: {CITY PURCHAyG.GENT} COUNCIL APPROVAL
~~~.~ ~~ ~`~Yt,t~~116i1111IPPPPP~tt®f
13y: ICeitit tA~atts ~~ ° a`< '°''da®
Date: ~ ~- ~°'°~ date: ,`~,` ~~ ;,
APPROVE Ft~t~AAYC3R) ATTEST: {C CLERi6} i =
i3y: Mayor Tantmy de VU d By: ierk, cee mitt '~~" ~
date: ~ Date: - '~` °~® °"Ya )' 9`5`{ , ~ .~
,~ ° t
~s°a
r~,®d'r~PPPP~laali ttt4~ll~elate`
C~ CiE D CTI
No. 002
DATE i3F ISStJAI~tCE _10129!0$ EFFECTIVE DATE _10/29/08
® R _City of Meridian
Ct~NTRACT®R _Paul Construction
Contract• _PKS-Q8-006
Project: _Settlers Village Square Phase ®ne
f3WNER's Contract No. PKS-08-006 ENGINEER'S Project No. 07045
You are directed to proceed promptly avith the following clEange(s):
I?escription:
Ins¢t¢a~l,Nl9an~®addittional 186 LF of 1" PE water service and place additional concrete as detailed in
[6A6lX4YI1LI16.nt A"•
Purpose of Work Change Directive:
I3y coordination with the Treasure Valley horseshoe Club for horseshoe pits.
Attachments: (List documents supporting change}
The Land Group drawing C5.01(I) dated 10/29108 ("Attachment A")
If OW NER or CONTRACTQR believe that the above change has affected Contract Price any Claim for a
Change (hder based thereon will involve one or more of the following methods as defined in the
Contract Documents.
Itifethod of determining change in
Contract Price:
Unit Prices
Lump Sum
® Cost of the Work
Estimated ancrease {decrease) in Contract Price: Estimated increase (decrease) in Contract
$ Tames:
If the change involves an increase, the estimated Substantial Completion: days;
amount is not to be exceeded without further Ready for final payment: days.
authorization.
E,1Cl?C No. 1911}-g-F (1996 Edatio») `
Peepafed by ibe Engiuecte ]Diet CottBtact i~nrKnta Committee and endorsed by 77se A~ocktted Ueneral Contractors of Arrxeica attd the Crnstttectian Specifications
I~dteffie.
,I~ + ~~u
I I
I I I
-I-- + ,I ~~~ ~"
I I I SERVCE
o ~-- -I- -~ o ,
1 "W
74-1.F' 1" PE
o
r
~I^ a
I I
I _
I
~L_I_ Jo
1 Q4-LF 1" PE
WATER SERVICE
2' x 2' CONCRETE PAD
F~2 YARD HYDRANT.
CITY OF MERIDIAN TO
PROVIDE HYDRANT.
CONTRACTOR INSTALLED.
3
$2-Ll: 1" PE
WATER sERVICE
~s
~,,,,~„ Settlers Village Square
~~
~,«~,.~. „~,.,, Phase One Improvements
~~..~,~.. NAeridlenr ~dano ~5.a1{1}
i1~Z~~ ~ 1~°2~ 29&46g9~1 P TR P ~1
,~ ,~ ® M
~~
~ ~w~ ~~,
lQ$ 2
City ofMeddisn
M~ )em~n
560 W. W~
Meridiaq III
RB: l~ttlers Y Sgnare p}~ I
Work +ChanbB Drive #2
Request far Chsa~e Order
Add i>lb LF ]" P$ pipe
Add I EA ym+d hydrant {owner famished}
• Add2'x2'
11a1 Op
Labor end FAuipment 4 •pp
$] 144.OQ
13'1/0 ~
~]315.{p
. ~4 ~~,~
$i35S.p? bxe
Y~+- .~
a~g L. Peal -
,..~ .. _ •
:,~
PWL -10495-AA-4{02314, 428Sp,
02310, 03900, 02740,023011}
P.fJ. Hox 1]17 • Meridiaa, ID 83680
(208) 466-2939 • Fex (208} 465 9013
&mell: ploaetrctn~cacom
~C$ - 6121
s
i,
~.
C ~
No. 003
I~t~``I'EE ®F ISSiI CE _I 1117/0~ E CT I3A 10/17108
®~' _City of meridian
CO ~ C~OR _1'aut Canstruction
Contract: PKS-O8-006
jcct° _Setelers Village Squffie .Phase
O R's Contract No. PKS-O8-006 EN(~Il~EER's Project No. 0'7045
You are to proceed praxrtptly with the folio c~aange(s};
llescriptloo:
Install additYOnal ~/a" condtait as detailed on attached L9rawing No. SK-E3.
moose oP Wor1c Change I?irectfve:
For future lighting usc.
~ttac ts: (List ct qts rung chime)
• wing Na. SK-E3 Mulder En °ng Inc rated.
~ No. S
If t} R or CO C'TOR believe that the above change has affected Contract Price any Claim f®r a
ge Order thereon will involve one or of the follawing methods as defined in the
C ts.
A~ethod of determining change in
Contrast Price:
Unit Prises
Su
Cost of the Worts
Es ° iaacr (decrease) in Contract Price: led in (decease) ut tract
~ Tinnes:
If the chance involvcs an increase, the csriYnateci Substantial Co letion: days;
aunt is not to be ex ed without er Ready for final nt: days.
autho ° lion.
RECO ; ,, I3EI?: At7 ~1~I0
~~~~
O ER PR Ggit ~WIVE~ TIEP EPiT ~l'RESENTATIdE
ley: I3y:
EJCI7C 1~T®. 20- 1 nl
ts~ri~e am~co~et m~ d~v~ oe~a~e
1 i2 ;~ i•i *'J
tD®
Dots: t~dovember 17, 2045
To: Land Group
Attn: Jyl Beveridge
~' 939-4445
Protect: Settlers Village Square Phase One Improvements
Sheet El A details (l) WP GPI Junction Box and (1) WP Junction Box near each other at the
north side of the tennis courts.
Are 2 Junction Boxes required or can l Junction Box serve the purpose for both?
Thank you
Max S. Jensen
City Of Meridian
The one box at the north end ofthe tennis court could be used for the convenience
outlet {WP, GFn. It was intended for use with an automatic tennis ball serving machine.
So the public would need access to it. The other box was intended to be used to feed the
future tennis court lighting poles. My only concern is that the public would have access
to the outlet.
If they are in the same box, they would also have access to the electrical
connections to the fight fiartures on the pole. it may not be a good idea to allow them
access to that for safety and vandalism reasons.
Ano#ter thought has otxurred to me. The junction boxes on the east and west side
ofthe court are intended to feed lighting poles which would be located along each side
toward each serving line. There could ~ 2 or three lights on each side depending on the
type of light used. When the lights are installed, there will have to be conduit run from
the box to the light pole locsitians. If those boxes are in an asphalt or concrete area, they
would have to cut and patch the asphalt or concrete in the future when those light are
installed. There could be two 20 amp circuits going in each direction north and south.
Perhaps a'/" empty conduit run from serving Iine to serving line through the junction
hox would be a good idea to avoid cutting and patching.
Rod Mulder, P.E.
A-1Z;
:J
0
4
0
g
ry
KEYED NC~TES~
Q ~.• E~*nr cxtNOUrr sTUeBED our Tb 7NE c.~uar aA~+iEs
AND CAPPED FOR FtJNRE I~SE ROUTE 1 Y OfF EDt~ ~
F~IISHED COURT OR ~dEYVNJC Tn AIA~ POTE7~iiW.
LOCATIONS OF FUNRE uccrrrr POLE I.OCAnoNS.
ELEt
~~
0
r
0
SITE
Mulder
Engineering
Incorporated
770 N 77th SttpR Suets C Bdea.1D 93702
illk ~ 336-02x8 Riff:12031346.1174
fm>eb: muklete~0eabteonsnet
8E111.EF16 V~.L.A~ BGIJAFiE
8Et116gB PA1K
ORAw1MG NO
~~~
November Z5, 200$
F'Fal~7'R p~ ~1
PWL -10493-A,A,4(02319, 02850.
02310,03300,02740,02500)
PO. >lox 1117 • Meridian, ID 83680
(208) 4~-2953 • Faz (208) 465-9013
$-mail; plcnstrctn~cs.com
RCIi - 6121
1V1~ Je~on ~ .
City of M~ritdi~aa
RE: 9ettle~ Village Stguat~e Phase I
Wad C~tgge birec~re No. 003
Add'/<'° conduit plug charge plastic boxes to a~ncrete boxes.
gee ,propo~l ~chod from 9ou~tem Idaho F~C6ric
$ 814.00
S 1.814.00, (sub c a actor) .
10°/a' $~48 (Paul Constmction3 ~ .
~~1,995.40
34ib ~~ ~ ins Comreot
Incre~e in Co~hact Time: Z days ,
~a~ Y'~~
. ~~.~ ~~
L.Paul -
111'25A2t108 16:18 2884669813
Rl~v 21 aE 03,32p L Ven oia~
~' T~
X27
PR~P'[~5~~
;uu~t~rl ta~t~to >~c.ECr~nc twc.
~.O.13ox 1R2
MetbB ID 8364.1
'h- ~48.445.277R
=+BUt ?U8.495.~7t3Q
Lee flan Scholactc
IQ 6te?w~rtcal Contractor
Public Works >cle~crPcal Corr#r8t14r
P~C~ 82
p.1
~p8.941.575t7
# 27A56 '
#~5~06-C-4(~6g00~
e r, - - - - ----
aob tYanuas SETTLERS VIILAGI SAuaRE
5tete
1tr.>!tttec! -- GOrrtsct Phorta:
'ye here b1-~ubmit speciflcetton and esblmates f0i"
CttAN6t pRAi.
ADD CONDUIT " DETAILt:p VN DR~IWIAtG 5K-i:3 FROM $ - $14~Q0
MUI.bER ENGINEERIAIG
SUPPLY AND INSTALL 4 - CONCRETE J-Bpltflg KOR TENN4S $ 1,0.00
~C+DURT -
Ve propos8 hereby to furnish madarli~l end tabor~compfete in atxordance with share spacificat~on, for:
- - - (sl doU~
'ayments to kne made as follows: DWIWS
6e sa bid workkto
nnpt~i to a v~bnan Ipw manner mer~g to ~,~
actives.aniralterauonorderlauon~rrnagvvaQit6
-B M E~fNtea only upon +~ttan orderr,aml tM1 t~nq authoftzedSfgrature LEE VANSCHOIACK
.
~ m~a amara~d abaxe the e:ttl. AD tsb
e ~ngeatwan a~taenP, order, t~eyeat „~
ottrat. owixtrsu eanY tire, eo~4oo and otimr rcet~aee WoTE:'ThPa propo~l may withdrawn by .
y
ununat. our sat t~uUymmstad bM . us If not.stxeFted vrFth in . ~0 • rd~ry9,
Of)bttefi~f CQ•11~li8t)QA Irttt+fdaRB.. _ .
~aria~~ on ~o~aa~ s
w above priQSUs, Rpedfltetion and cpndPtbna arQ
Sere
tdafactary are hereby isa}. you authori~
4 .
do the work ot~ apecifled. P~ymants will be made as out(inrd. Stsrtawre i
l7~}o f1lF AMOR1'~rl/~
WC2 GE CT
No.
DATE d~F TSST.TAleTCE _11/216/08 EFFEC'T'IVE D~1,TE l 1/24/08
Attaclimeaete: {List nts siipportiv$ c11au$e)
I) SheetN®. C4.Ol~t]
Tf OWNER or CO CTC7R believe tt~t the above change has affected Contract Price any Claim for a
C Chder thereon will involve one or snore of tl'e following methods as defined in the
Contract Documents.
Iviethod of determining change m
Contract price:
^ LFnit Pries
^ Lump Sum
Cost of the Work
Asti increase (d ) in Contract Price:
If the chara8e involves an increase, the estimated
amount is not to be exuded without further
ori~tion.
Estimated increase 4 e) in Contract
Times:
Substantial Completion: daysi
Ready for final payment- days.
RECDA ED:
®wiv~i. ~ Jtrcr t ~ - - - ®wN~ n~ xBSi~rA
Ey:
No. 9F0-8-F (199 F3dition}
Paa~mred by fiat hint Cmaueet Conardltee aaad eaada~edby~o Amoc(sted Qmani Conuss6ws of Asaaotka en8lire C
OYdYoIIOR 1t$~
,,,,~,,, Settlers Village Scare
~,~,~ Phase One Improvements
~rn~w/wr rwr~Yrly
PF~ase Orte - (~edit~ end Dn~ge Pin
..a~w,ae t. m
ae~ 1, 20v$
~~ Jens ' ~~,~ .~~~~
City ofMaradiau •~.••G: ~°~d~'~' G, ~~..
RB: Steers Vi llama square -phase 1
Project No. 07045
#1-Add (2} ~diitiaael lanadsaape dra3~gs
M~ $ 990.00
• ~bor 8t Equipmentt ~ 6~.~
' $1S50.Q0
• 15"~ 4T 0
sow ,bond $1897.50
~ 56.93
$1954.43
#2 -Add aoncre~o ax pumPhouae
• 1~ LF $120.00
TOTAL 1NC1tEASE: $2,074.43
T7iank you.