Agreement with Ada County Highway District ACHD for Ustick and Linder Intersection Roadway Construction and Water Line Adjustments
Memo To: Jaycee Holman; Tara Green From: Brent Blake, Engineering Technician II CC: Kyle Radek, Clint Dolsby, Scott Steckline, Tom Bany, Karie Glenn Date: 4/30/09 Re: Proposed Agenda Item for May 12, 2009 City Council Meeting The Public Works Department respectfully requests the following item be placed on the May 12, 2009 City Council agenda, under Consent Agenda, for Council's consideration: Approval of bid administration costs and traffic control costs associated with Water and Sewer Improvements in conjunction with ACHD Ustick/Linder Intersection, Phase 2 Project for the amount of $74,380.66. ACRD received bids for this project. The bid amount for the water and sewer improvements for the overall project low bidder is $62,573.00. The ACRD administration cost of $3128.65, and associated traffic control cost of $8,679.01. This work will be done as Phase 2 of the overall project. Recommended Council Action: The Public Works Department recommends that City Council approves the bid of $62,573.00, associated administration costs of $3,128.65, and associated traffic control cost of $8,679.01 for Water and Sewer Improvements in conjunction with ACHD Ustick/Linder Intersection Phase 2 Project and authorizes Engineering to proceed with the project. Thank you for your consideration. Please contact me if you have any questions regarding this item. From the desk of... BRENT A. BLAKE ENGINEERING TECHNICIAN II Meridian Public Works Department 33 E. Broadway Avenue, Ste 200 Meridian, Idaho 83642 Ph: (208) 898-5500 Fax: (208) 898-9551 AGREEMENT FOR: ROADWAY CONSTRUCTION /' & WATER LINE ADJUSTMENTS USTICK ROAD St CINDER ROAD INTERSECTION ACHD PROJECT N0.305048 THIS AGREEMENT made and entered into this ,~, day of , 2008, by and between the ADA COUNTY HIGHWAY DISTRICT, by and through its Board of Commissioners hereinafter called DISTRICT, as first party, and the CITY OF MERIDIAN, a municipal corporation, by and through its Mayor and City Council hereinafter called MERIDIAN as second party, both parties being a body politic and corporate of the State of Idaho. WITNESSETH WHEREAS; the DISTRICT and MERIDIAN desire to unde-tr ake a joint e~fo~to share the tasks and costs of reconstructing the Ustick Road and Linder Road intersection including a traffic signal system, bridge widening, curbs, gutters, sidewalks, and water and sanitary sewer installs#ions, adjustments, relocations, and abandonments as detailed in Project Number 305048, hereinafter referred to as the CONTRACT. WHEREAS, the DISTRICT is willing to accommodate MERIDIAN'S request by arranging for installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities as part of the Project plans so long as the DISTRICT receives assurances that the DISTRICT will be fully reimbursed for all costs and expenses it incurs as a result of additional work attributed to the water and sanitary sewer facilities within the Project boundaries, including but not limited to, costs for changed conditions, plan errors and omissions, and delays attributable to the water line or the sanitary sewer pipeline design and installation. NOW, THEREFORE, in consideration of the foregoing premises, mutual covenants and agreement herein contained, the parties hereto agree as follows: 7. DISTRICT SHALL: a. Be the party responsible for soliciting, receiving, and opening of bids and for executing and administering the construction CONTRACT for the roadway reconstruction, and installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities referenced herein; b. Provide MERIDIAN with a complete set of combined bid documents for the roadway reconstruction, and for the installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities referenced herein; Pag®1 of 5 c. Furnish MERIDIAN with an abstract of all bids received, and obtain MERIDIAN'S concurrence with DISTRICT'S recommendation for award of the CONTRACT prior to making such award; d. Make monthly progress payments and the final CONTRACT payment to the Contractor in conformance with the terms of the construction CONTRACT; e. Submit to MERIDIAN a copy of each Contractor progress payment estimate, as such estimates ,are approved by DISTRICT, together with an invoice for MERIDIAN'S share of the construction CONTRACT costs earned by and to be paid to Contractor; f. Provide for the reference and replacement of all pre-existing survey monuments within the work area; g. Provide the trench compaction testing for the sanitary sewer and water line facilities from 1-foot above the pipe zone to sub-grade of the roadway section; trench compaction testing shall be provided at the minimum frequency rate of one (1) test per five hundred (500) lineal feet per foot of trench depth; provide aU re-testing required in any area that does not meet CONTRACT requirements; and h. Provide the field survey and grade control necessary for construction of the roadway. Centerline or offsets and stationing shall be established prior to MERIDIAN staking sanitary sewer, water lines, manhole locations, and service lines. 2. MERIDIAN SHALL: a. Be the party responsible to provide the inspection, field survey and grade control required for the installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities under the CONTRACT and provide copies of appropriate tests and diaries to the District Project Representative; b. Provide DISTRICT with the construction plans, special provisions, and unit bid quantities for the installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities to be included in the bid documents for the CONTRACT (all work required for the sanitary sewer and water facilities to be performed in conformance with the 2005 Edition of the Idaho Standards for Public Works Construction (ISPWC) and the City of Meridian Standard Specifications and Drawings); c. Remit to DISTRICT, within thirty five (35) calendar days after the date of invoice therefore, all funds for which MERIDIAN is responsible pursuant to the approved final CONTRACT payment estimate; Page 2 of 5 d. Remit to DISTRICT within thirty-five (35) calendar days after the date of invoice therefore, all funds for which MERIDIAN is responsible pursuant to this Agreement; e. Reimburse the DISTRICT, up to a maximum of five (5} percent of MERIDIAN'S construction costs for all additional costs incurred by the DISTRICT, including overhead and benefits, project administration, compaction testing, and soils work required solely for the installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities; mobilization, traffic control, flagging, detours, and weekly meetings shalt be reimbursed on a prorated basis. The prorated basis for the above items will be calculated using the percentage of the MERIDIAN 'S project costs as they relate to the total project construction costs; f. Be liable for the cost of repairing any trench failures attributable to failure of .......................sanitary sewer and water lines within tfie boundaries identified in the Contract, and be liable for and indemnify the District for any and all costs and damages resulting from any such trench failure; and g. Reimburse District for any additional costs to District attributable to the installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities or to the removal of any or all items from the Con#ract that are associated with the installation of sanitary sewer and water pipelines. 3. THE PARTIES HERETO FURTHER AGREE THAT: a. The CONTRACT amount for the sanitary sewer and water portion of the project to be reimbursed to DISTRICT by MERIDIAN shall be based on the actual quantities of work acceptably performed, and/or, installed, as determined from field measurements, and paid for pursuant to the unit, and/or lump sum prices established in the Contract; b. MERIDIAN'S approval will be required for any change order work involving the installations, adjustments, relocations, and abandonments of the water and sanitary sewer facilities; c. Prior to commencement of work by the Contractor, the parties will, together with the Contractor, inspect the entire project for the purpose of reviewing the project to locate and note any unstable areas and resolve any items of concern or misunderstanding; d. This instrument contains the entire agreement between the parties with respect to the subject matter hereof; Page 3 of 5 e. This Agreement may not be enlarged, modified, amended or altered except in writing signed by both of the parties hereto; f. AU signatories to this Agreement represent and warrant that they have the power to execute this Agreement and to bind the agency they represent to the terms of this Agreement; g. Should either party to this Agreement be required to commence legal action against the other to enforce the terms and conditions of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees and costs incurred in said action; h. Any action at law, suit in equity. arbitration or judicial proceeding for the enforcement of this Agreement shall be instituted only in the courts of the State of Idaho, County of Ada; and i. This A~gre®ment-sltalF be binding-upon-and inure to the benefit of the-personal representatives, heirs and assigns of the respective parties hereto. IN WITNESS HEREOF, the parties hereto have executed this Agreement on the day and year herein first written. ATTEST: ADA COUNTY HIGHWAY DISTRICT ,¢ ey: ~~ ~ By: y Susan Slaughter William J. Sch itzer EX@CUtiVe ASSISfi~~p1't'~~~~~t~uttt~~~`~ DlreCtor ATTEST: `~~~• p~~, ~i'~''% CITY OF MERIDIAN •~ $~AI, = B Jaycee olrfia ,~ T is ~, ~~`' Tammy de Wee City Clerk ''~'~~,,~ L'4U~Y . ~~~~``~~` Mayor ttszt tee Page 4 of 5 STATE OF IDAHO ) ss. COUNTY OF ADA ) . ~~ On this ~ ~"~ day of ~.~---~~-~ , 2008, before me, a notary public in and for said state, personally appeared WILLIAM J. SCHWEITZER known to me to be the DIRECTOR of the ADA COUNTY HIGHWAY DISTRICT and the person who subscribed said name to the foregoing instrument, and acknowledged to me that they executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. STATE OF IDAHO ) ss. COUNTY OF ADA ) Notary Public forahQ Residing at ~~-~-~.. ,Idaho My commission expires: ~ ~ ~- ~ ~ On this day of _"~~ ~ =- 2008, before me, the undersigned, personally appeared TAMMY DEWEERD and JAYCEE HOLMAN, Mayor and City Clerk respectively of MERIDIAN CITY, a municipal corporation, known to me to be the persons whose names are subscribed to the within instrument, and acknowledged to me that they executed the same for and on behalf of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. Notary Public ~ r Id ho Residing at , Idaho My commission expires: t`~-- y ~~_, Page 5 of 5 "-- .: -., ., __ -~ = - BID ABSTRACT Contract Number CT209-07 Contract Name BidDate Bidders 01 Bidder Lurre Construction 02 Bidder!Nampa Paving 04 Bidder Idaho Sand 8 Gravel ~ 05 Bidder-:King F~ccavation 078idder McAlvain Construction 08 Bidder!Knife River Schedule 1a -Ustick Rd end Linder Rd Intersection (Alternate No. 1) 03 Bidder. Central Paving 06 BidderlWF Construction 02-07 305048 Ustick Rd and Linder Rd IN2 Estimate _ 0202.4.1.A1 Excavation 249 10 ~ CY $11.00 $274,010.00 01 Bidder $7.50 $186,825.00 02 Bidder $6.15 $153,196.50 03 Bidder $6.15 $153,196.50 ', 04 Bidder $6.95 $173,124.50 OS Bidder $5.00 $124,550.00 06 B/dder' $8.50 $211,735.00 07 Bidder $3.94 ' $98,145.40 OS Bidder $9.50 $236,645.00 0202.4.5.A.1 Unsuftable Material F~ccavation 1200 CY $25.00 $30,000.00 - 01 Bidder $19.00 $22,800.00 02 Bidder $13.00 - -- _ $15,600.00 03 Bidder $5.80 - $6,960.00 04 Bidder $30.00 $36,000.00 OS Bidder $15.00 $18,000.00 06 8ldder; $20.00 $24,000.00 07 Bidder $6.11 $7,332.00 OS Bidder $9.75 $11700.00. 0204.4.1.A1 Structural Excavation 883 CY $30.00 $26,490.00 01 B/dder $11.00 $9,713.00 02 Bidder $8.00 $7,064.00 03 Bidder; $13.00 $11,479.00 04 Bidder $13.30 $11,743.90 OS Bidder $10.50 $9,271.50 06 Bidder; $13.25 $11,699.75 07 Bidder $12.39 $10,940.37 OS Bidder $14.75 $13,024.25 0206.4.1.8.1 Hydroseeding - dryland grass 2.4 AC $3,000.00 $7,200.00 01 Bidder $2,000.00 $4,800.00 02 Bidder $1,449.00 __. . $3,477;60. 03 Bidder; $1,450.00 $3,48(1.00 04 Bidder $1,380.00 $3,312.Q0 OS Bidder $1,200.00 $2,880.00 06 Bidder; $1,730.00 $4,152.00 0781dder $1,462.35 $3,509.64 OSBldder $3,440.00 $8,256.00 0207.4.1.A01 Removal of Obstructions 1 LF $26,000.00 $26,000.00 01 Bidder $1,400.00 $1,400.00 02 8ldder $5,736.00 $5,736.00 03 Bidder; $12,000.00 _. $12,000.00 04 Bidder $5,464.00 ' $5,464.00 OS Bidder $25,000.00 $25,000.00 06 Bidder; $25,600.70 $25,600.70 07 Bidder $11,854.92 ' $11,854.92 OS Bidder $25,000.00 $25,000.00 0601.4.1.A.01 C RCP, Ctass III -18" dia. I 66 I LF I $50.00 $3,300.00 01 Bidder $45.20 $2,983.20 02 Bidder $51.45 $3,395.70 ' 03 Bidder $29.40 $1,440.40 04 Bidder $49.50 $3,267.00 OS Bidder $53.00 $3,498,00 ' 06 Bidder: $50.00 $3,300.00 07 Bidder $56.22 $3,710.52 08 Bidder $69.00 $4.554.00 0601.4.1.A09 PVC C-905, 30"dia. 10 LF $75.00 $750.00 0181dder $116.65 $1,166.50 OZ Bidder .......... $132.30 $1,323.00 :03 Bidder $91.35 $91350 _.... _ 04 Bidder $127.50 $1,275.00 OS Bidder $150.00 $1,500.00 .06 Bidder; $93.00 $930.00 0781dder $158.85 $1,588.50 OS Bidder $170.00 $1,700.00 0601.4.1.A.09 A PVC SDR35, 12"dia. 456 LF $21.00 $9,576.Q0 01 Bidder $24.70 $11,263.20 02 Bidder $19.95 $9,097.20 . 03 Bidder' $18.90 $8,618.40 04 Bidder $19.20 $8,755.20 OS Bidder $27.45 $12517.20 06 Bidder $21.00 $9,576.OD ', 07 Bidder $23.91 $10,902.96. 08e/dder $26.75 $31,970.00 ~0601.4.1.A.09 B PVC SDR 35, 18" dia. 332 LF $51.00 $16,932.00 01 Bidder $34.25 $11,371.00 02 8ldder $40.95 _. ._ __ $13595.40 _ 03 Bidder` , $26.25 $8,715.00 04 Bidder $39.40 ' $13,080.80 OS Bidder $39.50 $13,114.00 06 Bidder' $29.00 $9,628.00 07 Bidder $88.48 $29,375.36 OS Bidder $40.00 $13,280.00 0601.4.1.A.09 C PVC SDR 35, 24" dia. 74 LF $55.00 $4,070.00 _ __ 01 Bidder $45.25 $3,348.50 02 Bidder $64.05 $4,739.70 :03 Bidder; $81.90 $6,060.60 04 Bidder $61.60 $4,558.40 OS Bidder $80.00 $5,920.00 06 Bidder: $41.00 $3,034.00 07 Bidder $61.23 $4,531.02 08 Bidder $55.00 $4,070.00 , 0601.4.1.A.09 D PVC, Closed Profile - 42" dia. 1 241 LF $225.00 $279,225.00 01 Bidder $87.00 $107,967.00 02 Bidder $96.60 $119,880.60 03 8ldder - $102.90 $127,698.90 '. _ _ _ 04 Bidder $92.90 $115,288.90 05 8ldder __ _ $90.00 $111,690.00 _ 06 B/dder $96.00 $119,136.Q0 '. 07 Bidder $102.87 $127,661.67 __ OS Bidder ___ $110.00 $136,510.00 4/27/2009 Page 1 0601.4.1.A.09 E PVC C-900 -12" dia. 193 LF $60.00 $11,580.00 01 Bidder $26.60 ' $5,133.80 02 Bidder $24.15 $4,660.95 03 Bidder' $27.30 $5,268.90 04 Bidder $23.20 ! $4,477:60 OS Bidder $30.00 $5,790.00 06 Bidder' $27.00 $5,211.00 07 Bidder $68.20 $13,162.60 08 Bidder $31.00 $5,983.00 0602.4.1.E.1 Catch Manhole - 48" dia. 3 F1~1 $2,400.00 $7,200.00 01 Bidder $2,320.00 $6,960.00 02 Bidder $1,995.00 $5,985.00 03 Bidder $1,890.00 $5,670.00 04 Bidder $2,169.00 $6,507.00 OS Bidder $1,800.00 $5,400.00 06 Bidder $1,820.00 $5,460.00 07 Bidder $2,331.97 $6,995.91. 08 e/dder $1,920.00 $5,760.00 0602.4.1.E.1 A Manhole, Type B - 96"dia. 7 EA $5,700.00 $39,900.00 01 Bidder $9,500.00 _..._. $66,500.00 _ _....._._T 02 Bidder -.--._.._ _ $1Q458.00 -- $73,206.00 -- - 03 Bidder : $9,135.00 $63,945.00 04 Bidder $10,312.00 $72,184.00 OS Bidder $8,SOO.QO -- $59,500.00 ... 06 Bidder, ---- _ $8,840.00 .... ---_______ $61,880.00 078idder $9,242.73 ' $64,69931 OBBidder $10,320.00 $72,240.00 0602.4.1.F.1 Catch Basin - Type I 11 EA $550.00 $6,050.00 0181dder $400.00 $4,400.00 02 Bidder $787.50 $8,66250 :03 Bidder; $631.00 $6,941.00 04 Bidder $750.00 $8,250:00 OS Bidder $550.00 $6,050.00 06 Bidder; __ $765.00 $8,415.00 0781dder $413.27 ' _..._ $4,545.97 08 Bidder $850.00 $9,350.00 _. 0703.4.1.A1 Construct Concrete Wingwalls & Footings _ 83 CY $250.00 $20,750.00 01 Bidder $550.00 ': $45,650.00 02 Bidder $467.25 $38,781x75 , 03 Bidder $467.00 $38,761.00 04 Bidder $454.00 ' $37,682.00 OS Bidder $700.00 $58,1©0.00 06 Bidder. $455.00 $37,765.00 07 Bidder $364.52 $30,25536 08 Bidder $500.00 $41,500.00 0704.4.1.A.1 Stiftleg Box Culvert (3 sided) 12' span x 10' rise 198 LF $2,000.00 $396,000.00 01 Bidder' $1,400.00 $277,200.00 02 Bidder $1,207.50 $239,085:00 03 Bidden $1,250.00 $247,500:00 04 Bidder $1,174.00 $232,452.00 OS Bidder $1,450.00 $287,100.00 06 Bidder $1,175.00 $232,650.00 ', 07 Bidder $1,187.36 $235,097.28 OB Bidder $1,390.00 $275,220.00 0706.4.1.A5 Standard 6" Vertical Curb & Gutter - - -- 3359 LF $8.00 $26,872.00 01 Bidder $6.75 $22,673.25 02 Bidder $7.87 $26,435.33 ; 03 Bidder $7.60 $25,52$.40 04 Bidder $9.90 $33,254.10 OS Bidder $7.80 $26,200.20 ; 06 Bidder; $7.50 $25,192.50 ', 07 Bidder $8.16 $27,409.44 08 Bidder $8.50 $28,551.50 0706.4.1.8.1 Concrete Valley Gutters 213 LF $20.00 $4,260.00 01 Bidder $14.60 $3,109.80 02 Bidder $26.25 $5,591.25 03 Bidder; $16.80 $3,57&.40' '. 04 Bidder $29.70 $6,326.10 OS Bidder $18.15 $3,865.95 06 Bidder; $25.50 $5,431.50 07 Bidder $19.07 $4,063:91 08 Bidder $28.25 $6,017.25 0706.4.1.E.1 Concrete Sidewalks 2263 SY $20.00 $45,260.00 OZ Bidder $14.50 $32,813.50 02 Bidder $18.38 $41,593.94. 03 Bidder; $18.80 $42,544.40 04 Bidder $20.20 ' $A5,712.60 OS Bidder $18.35 $41,526.05 068idder $18.00 $40,734.00 07 Bidder $16.53 ' $37,40239 08 Bidder $19.75 $44,694.25 0801.4.1.8.1 08" Minus Uncrushed Aggregate Base 28846 TN $9.00 $259,614.00 01 Bidder $5.00 $144,230.00 02 Bidder $4.50 $129,807.00 03 Bidden $5.50 $158,653.D0 04 Bidder $5.95 $171,633.70 OS Bidder $8.00 $230,768.00 06 Bidder: $6.80 $196,152.80 '' 078idder $9.46 ' $272,883.16 0887dder $14.75 $425,478.50 0802.4.1.8.1 Crushed Aggregate for Base, Type 3!4" 5923 TN $16.00 $94,768.00 0181dder $11.00 $65,153.00 02 Bidder $8.90 $52,714.70 03 Bidder $12.00 $71,076.00 04 Bidder $14.10 $83,514.30 OS Bidder $10.35 $61,303,05 06 Bidder; $14.00 $82,922:00 0781dder $14.33 $$4,$76:.59 08 Bidder $24.00 $142,152.00 0810.4.1.A1 Plant Mbc Pavement - 4" 5970 TN $78.00 $465,660.00 01 Bidder $67.50 $402,975.00 02 Bidder $56.00 $334,320.00:03 Bidder $72.10 $430,437.D0 04 Bidder $82.00 $489,SAD.00 OS Bidder $68.50 $408,945.00 06 Bidder' $66.30 $395,$11.00 07 Bidder $68.88 ': $411,213.60 08 Bidder $76.00 $453,720.00 1103.4.1.A1 Flaggers 160 HR $30.00 $4,800.00 Ol Bidder $17.50 ' $2,800:.00 02 Bidder $17.65 $2,824.00 03 Bidder' $18.90 $3,024.00 04 Bidder $18.00 $2,880.00 OS Bidder $19.00 $3,p40.00 ' 06 Bidder' $18.50 $2,960.00 0781dder $23.00 $3,680.00 08 Bidder $20.25 $324000 1103.4.1.8.1 Traffic Control Signs _.__. . 232 SF $6.00 $1,392.00 01 Bidder $1.50 $348.00 02 Bidder $5.25 _. $1218 00:03 Bidder; $3.15 $730.80 04 Bidder $3.00 _ $696.00 _ _w - OS Bidder $3.25 $754.00 ; 06 Bidder; ; , $3.00 $696.OU 07 Bidder $3.18. _ _ _ - $737.76 - - - 08 Bidder $3.50 ~ -, _ $81200 4/27/2009 Page 2 1103.4.1.C.1 Traffic Control Barricades, Type III ~ 5 ~ FJ~ ~ $150.00 $750.00 01 Bidder $200.00 $1,000.00 02 Bidder $39.90 $19950 :03 Bidder; $47.25 $235:25 '. 04 Bidder $45.00 ' $225.00 OS Bidder $47.00 $235.00 06 Bidder $46.00 $230.00 078idder $47.69 $238.45 OS Bidder $51.00 $255.00 . 1103.4.1.G.1 Portable Tubular Markers 400 F~4 $10.00 $4,000.00 01 Bidder $4.90 $1,960.00 02 Bidder $7.66 $3,064.00 03 Bidder, $6.30 $2,520.00 04 Bidder $6.00 $2,400.00 OS Bidder $6.50 $2,600.00 06 Bidder: $6.00 $2,400.00 __ 07 Bidder $6.36 $2,544.00 08 Bidder $6.75 $2,700.00 1103.4.1.J.1 Traffic Control Maintenance 9 60 HR $20.00 $3,200.00 01 Bidder $18.50 ' $2,960.00 02 Bidder $22.05 $3,528.00 03 Bidder' $21.00 $3,360.00 _ 04 Bidder $20.00 _ $3,200.00 OS Bidder $0.00 $0.00 06 Bidder _ $20.50 $3,280.00 . __. _._._. _.. .. __._.. 0781dder $21.19 ' T $3,390.40 08 Bidder - $22.50 ----- _ --- $3,600.00 .. ._...--- - . _.._ .. _ ._. .. 1131.01.01 Traffic Signal and Illumination System Complete 1 LS $161,500.00 $181,500.00 01 Bidder $80,000.00 ' $80,000.00 02 Bidder $79,758.00 $79,758.00 < 03 e/dder $80,000.00 $80,000.00 ': 04 Bidder $75,960.00 $75,960.00 OS Bidder $79,758.00 ' $79,758.Q0 06 Bidder; $121,400.00 $121,400.00 07 Bidder $80,492.87 ' $80,492.87 08 Bidder $85,680.00 $85,680.00 .1134.03.18 Pavement Markings (Paint) 7770 SF $1.50 $11,655.00 01 Bidder $0.35 ' $2,719.50 02 Bidder $0.32 $2,486.40 03 Bidder, $0.30 _... $2,331.00 04 Bidder $0.30 $2,331.00 OS Bidder $0.50 $3,885.00 ; 06 Bidder. $0.31 _. $2,408.70 07 Bidder $0.37 $2,874.90 OS Bidder $0.40 $3,108.00 1134.05.18 Pavement Markings (Thermoplastic) 1710 SF $6.50 $11,115.00 01 Bidder $6.85 $11,733.50 02 Bidder $7.09 $12,123.90 03 Bidder; $7.00 $31,970.00 04 Bidder $6.75 $11,542.50 05 Bidder $7.00 $11,970.00 06 Bidder; $7.05 $32,055.50 ', 07 Bidder $7.26 $12,414.60 08 Bidder $7.75 $13,252.50 1135.01.01 Roadside Traffic Sign Installation (One Metal Post) 21 FA $150.00 $3,150.00 01 Bidder $25.80 $541.80 02 Bidder $26.25 $551.25 :03 Bidder; $26.25 $551.25 04 Bidder $25.00 $525.00 OS Bidder $27.00 $567.00 06 Bidder' $25.50 $535.50 ', 078idder $26.49 ~ $556:.29 08 Bidder $28.25 $593.25 2010.4.1.A1 Mobilization 1 LS $203,329.12 $203,329.12 0181dder $1,824.45 ' $1,824.45 02 Bidder $51,500.00 $51,500.00 03 Bidder; $30,440.00 $30,440.00 04 Bidder $30,000.00 $30,000.00 OS Bidder $50,000.00 $SQ000.00 06 Bidder $91,000.00 $91,000.00 07 Bidder $87,130.00 ' $87,130.00 OS Bidder $76,210.00 $76,210.00 2030.4.1.A1 Manhole, Adjust to Grade 10 F~ $175.00 $1,750.00 Ol Bidder $335.00 $3,350.00 02 Bidder $314.00 $3,140.00 ; 03 Bidder; $262.50 $2,625.00 04 Bidder $500.00 ' $5,000.00 OS Bidder $500.00 $5,000.00 06 Bidder; $260.00 $2,500.00 07 Bidder $715.28 ' $7,152.80 08 Bidder $310.00 $3,100.00 203-005A Partial Concrete Removal - Wingwalls 1 LS $3,450.00 $3,450.00 01 Bidder $7,500.00 ' $7,500.Q0 02 Bidder $7,350.00 $7,350.00 03 Bidder $7,350.00 $7,350.00 04 Bidder $7,000.00 $7,000.00. OS Bidder $3,500.00 $3,500:00 : 06 Bidder: . $7,140.00 _. --- $7,140.00 - --~ __......_....._..._.__._ ...................................................._.............- 07 Bidder $14,731.49 --- $14,733.49. ------._ 08 Bidder $7,900.00 ._.._....................__....... _ $7,900.00 ...F................_._..._....... . _.........._...._...._ _...... 203-065A Removal of Curb 50 FT $11.7a $587.00 01 Bidder $5.00 $250.00 02 Bidder: $26.25 $1,312.50 03 Bidder; $26.25 $1,312.50 04 Bidder $25.00 $1,250.00 OS Bidder $3.00 $150.f~ 5 06 Bidder' $25.50 $1,275.QQ 07 Bidder $8.90 $445.00 OS Bidder $28.25 _.... $1,412.50 2040.4.1.A1 Fence w/ privacy slats, Chain Link - 06' 1 156 LF $18.00 $20,808.00 01 Bidder $21.00 $24,276.00. 02 Bidder $18.66 $21,570.96 ; 03 Bidder . ............._$25.30,..,,.. ... $29,246.80 04 Bidder $17.80 $2Q,576.80 OS Bidder $18.50 $21,386.00 06 Bidder $22.00 $25,432.00 07 Bidder $18.83 $21,767.48 O8 Bidder $20.00 $23,120,00 2050.4.1.A2 Loose riprap - 12" 220 CY $60.00 $13,200.00 01 Bidder $30.00 $6,600.00' 02 Bidder $50.40 $11,088.00 03 Bidder; $52.50 $11,550:00 04 Bidder $62.10 $13,662.00 05 Bidder $20.00 $4,400.00 " 06 Bidder $68.00 $14,960.00 07 Bidder $51.71 $11,376.20 0881dder $76.00 $16,720.00 210-005A Structure F~ccavation Sch. No. 1 960 CY $18.40 $17.664.00 01 Bidder $10.00 $9,600.00 02 Bidder $8.00 $7,680.00 03 Bidder; $13.00 $12,480.00 04 Bidder $13.30 $12,768.00 OS Bidder $8.00 $7,680.00 € 06 Bidden $13.25 $12,720.00 ~._ 07Bidder $11.90 $11,424.00 08Bldder $14.75 - $14,160.00 s 4/27/2009 Page 3 210-015A Compacting Backfill 792 CY I S16.10 $12,751.20 01 Bidder $9.00 $7,128.00 02 Bidder $7.50 $5,940.00: 03 Bidder: $15.00 $11;880.00 04 Bidder $15.30 $12,117.60: OS Bidder $4.00 $3,168.00 068idder $15.30 $12,117.60 078idder $13.99 $11,080.08 0881dder $52.00 $41,184.00 502-025A Concrete Class 40A 56 CY $575.00 $32,200.00 01 Bidder $700.00 $39,200.00 02 Bidder $661.50 $37,044.00 03 Bidder. $660.00 $36,960.00 04 Bidder $643.00 $36,008.00 .. OS Bidder __ ... $650.00 __ $36,400.00 < _ 06 Bidder $643.00 $36,008.00 07 Bidder $306.41 ' $17,158.96 08 Bidder $710.00 _ $39,760.00 _ .. 502-030A Concrete Class 40B 181 CY $632.00 $114,392.00 01 Bidder $400.00 $72,400.00 02 Bidder $367.50 $66,51750 03 e/dder $367.00 $66,427.00 04 Bidder $357.00 $64,617.0D OS Bidder $570.00 $103,170.00 06 Bidder $357.00 $64,617.00 ', 078idder $285.85 $51,738.85 OSBldder $430.00 $77,830.00 503-010A Metal Reinforcement Sch. N o_. 1 12251 LB $1.55 $18,989.05 01 Bidder _ $0.95 $11,638.45 02 Bidder $0.88 $10,780.88 03 Bidder; $0.88 $10,780.88 04 Bidder $0.85 $10,413.35 OS Bidder $0.80 .$9,80(1.80 06 e/dder $0.85 $10,413.35 07 Bidder $0.60 $7,350.60 08 Bidder $0.95 $11,638.45 ; 503-015A Metal Reinforcement Sch. No. 2 201 35 LB $1.67 $33,625.45 01 Bidder $0.90 $181215D 02 Bidder $0.84 $16,913.40 03 Bidder $0.88 $17,718.80 04 Bidder $0.80 $16,108.00 ' OS Bidder $0.80 $16,1D8.00 06 Bidder' $0.82 $16,510.70 07 Bidder $0.58 ' $11,678.30 08 Bidder $0.90 $18,121.50 504-040A Combination Pedestrian/Traffic Rail 49 LF $26450 $12,960.50 01 Bidder $360.00 $17,640.00 02 Bidder $367.50 $18,007:50.: 03 Bidder; $600.00 $29,400.00 04 Bidder $357.00 $17,493.00 OS Bidder $370.00 $18,130.00 06 Bidder; $357.00 $17,493.00 ' 07 Bidder $237.08 $11,616.92 OB Bidder $390.00 $19,110.00 511-005A Concrete Waterproofing System, Type D 126 SY $34.50 $4,347.00 01 Bidder $30.00 $3 780 00 02 Bidder $24.15 $3,042.90. 03 Bidder, $24.00 $3,024.00 04 Bidder $23.50 $2,961.00 OS Bidder $18.00 $2,268.00 . 06 Bidder; $23.50 $2,961.00 078idder $22.25. $2,803.50 08 Bidder $26.00 $3,276.00 612-150A Temporary Concrete Guardrail 120 FT $3a.sD $4,140.00 01 Bidder $27.50 $3,300.00 02 Bidder $28.61 $3,433.20 ' 03 Bidder; $28.60 $3;432.00 ' 04 Bidder $27.30 $3,276.00 OS Bidder $30.00 $3,600.00: 06 Bidder:. $27.80 $3,336.00 07 Bidder $28.88 $3,465.60 OB Bidder $30.50 $3,660.00 612-155A Concrete Terminal Section 1 LS $431.25 $431.25 01 Bidder $290.00 $290.00 OZ Bidder $598.50 $598.50. 03 Bidder $300.00 $300.00 04 Bidder $285.00 ' $285.00 OS Bidder $300.00 $300.00 06 Bidder; $291.00 $291.00 0781dder $302.01 ' $302.01 08 Bidder $320.00 $320.00 624-005A Loose Riprap 41 CY $40.25 $1,650.25 01 Bidder $30.00 $1,230.00 02 Bidder $70.35 $2,884.35 03 Bidder; $50.25 $2,060.25 04 Bidder $68.40 $2,804.40 OS e/dder $25.00 $1,025.00 06 Bidder $68.00 $2,788.00 07 Bidder $51.71 $2,120.11 08 Bidder $76.00 $3,116.00 S500-11A Dewater Foundation -Abutment _ 1 LS $11,500.00 $11,500.00 O181dder $21,000.00 ' $21,000.00 02 Bidder _ $15,750.00 $15,750.D0 03 Bidder; $15,750.00 $15,750.00 : 04 Bidder $15,310.00 $15,310.00 05 Bidder $5,000.00 $5,000.00 06 Bidder; $15,300.00 $15,300.00 07Bldder $45,885.01 ' $45,885.01 OBBidder $16,920.00 $16,920.00 S501-35A Removal of Asphalt Overlay 202 SY $23.00 $4,646.00 01 Bidder $4.15 $838.30 02 Bidder $51.97 $1Q497.94 . 03 Bidder $2.10 $424.20 '' 04 Bidder $53.50 $10,807.QQ OS Bidder $51.50 $10,403.00 . 0681dder $3.65 $737.30 0781dder $16.28 $3,28$.Sb OSeidder $61.00 $12,322.00 S501-90A Temporary Shoring 348 SF $34.50 $12,006.00 01 Bidder $35.00 $12,180.00 02 Bidder $31.50 $10,962.00 " 03 Bidder: $31.50 $10,962.00. 04 Bidder $30.60 $10,648.80 OS Bidder $57.50 _. $2Q010.00 06 Bidder $30.60 $10,648.80 07 Bidder $57.55 $20,027.40 08e/dder $34.00 $11,832.00 SP 02020 Gravel Repair _. 203 SY $15.00 $3,045.00 018idder $5.50 $1,116.50 02 Bidder $2.50 $507.50 03 Bidder; __ $9.40 $1,908.20 04 Bidder $5.50 ~ $1,116.50 OS Bidder $3.40 $690.20 ~ 06 Bidder $7.00 $1,421.00 i 07 Bidder $7.13 $1,447.39 OB Bidder $8.00 $1,624.00 4/27/2009 Page 4 ~ SP 06011 Pond Outlet Structure ~ 1 ~ EA ~ $3,000.00 $3,000.00 01 Bidder $3,220.00 $3,220.00 02 Bidder' $4,195.00 $4,195.00 03 Bidder; $3,500.00 $3,500.00 04 Bidder $3,000.00 $3,000.00 OS Bidder $3,000.00 $3,Q00.00 06 Bidder; $3,060.00 $3,060.OD 07 Bidder $4,963.99 $4,963.99 08 Bidder $3,450.00 $3,450.00 . SP 06012 Pond Access Road 1 392 SY $30.00 $41,760.00 01 Bidder $6.80 $9,465.60 02 Bidder $5.25 $7,308.00 03 Bidder. $6.75 $9,396,00 04 Bidder $8.10 $11,275.20 OS Bidder $2.50 $3,480.00 06 Bidder $7.00 $9,744.00 078idder $14.00 $19,488.00 OS Bidder $11.50 $16,008.00 SP 07001 Concrete Apron - 42" dia. 1 EA $2,500.00 $2,500.00 01 Bidder $2,420.00 $2,420.00 02 8ldder $3,085.00 $3,085.00 03 Bidder' $2,940.00 $2;940.00 04 Bidder $2,968.00 $2,968.00 OS Bidder $2,500.00 $2,500 D0 06 Bidder $2,200.00 $2,200.00 0781dder $2,322.49 ' $2,322.49 OS Bidder $2,360.00 $2,360.00 SP 07002 Remove and Salvage Jersey Barrier to ACHD 220 LF $15.00 $3,300.00 018idder $14.50 ' $3,190.00 02 Bidder $15.22 $3,348.40 , 03 Bidder; $15.25 TT $3,355.00 04 Bidder $14.50 $3,190.00 OS Bidder $11.36 $2,499.20 ; 06 Bidder; _ $8.00 _ _.... $1,760.00 0781dder $15.37 ' $3,381.40 OS Bidder $16.75 $3,575.00 SP 07011 ADA Pedestrian Ramps 24 FJ~ $1,000.00 $24,000.00 0181dder $220.00 ' $5,280.00 02 Bidder $583.80 $14,011.20 , 03 Bidder $263.00 $6,312.00 04 Bidder $659.50 $15,828.00 05 Bidder $240.00 $5,760.Q0 06 Bidder; $570.00 $13,680.00 07 Bidder $471.56 ' $11,317.44 ' OS Bidder $630.00 $15,120.00 SP 08105 Temporary Paving 10667 SY $20.00 $213,340.00 01 Bidder $9.20 $98,136.40 02 Bidder $10.50 $112,Q03.50 03 Bidder: $0.00 $0.00 04 Bidder $0.01 $106.67 OS Bidder $8.00 $85,336.00 06 8ldder $11.50 $122,670.50 07 Bidder $11.19 $119,363.73 OS Bidder $15.00 $160,005.00 SP 08120 Asphalt Repair 473 SY $25.00 $11,825.00 01 Bidder $18.00 $8,814.00 02 Bidder $10.75 $5,084.75 , 03 Bidder. $17.60 $8,324.80 04 Bidder $21.60 $10,216.80 OS Bidder $13.50 $6,385.50 . 06 Bidder; $18.60 $8,797.80 07Bidder $23.51 - $11,120.23 0881dder $19.50 - --- -- $9,223.50 - SP 08126 Asphalt Bike Path - 7' 715 SY $15.00 $10,725.00 01 Bidder $11.00 $7,865.00 02 Bidder $10.00 $7,150.00 03 Bidder; $14.50 $10,3ti7,50 04 Bidder $14.10 ' $10,081.50 OS Bidder $10.00 $7,150.00 06 Bidder; $15.80 $11,297.00 07 Bidder $15.20 $1Q868.00 08 Bidder $18.75 $13,048.75 SP 09022 Concrete Neadwail 1 EA $300.00 $300.00 _.. . 0181dder $900.00 $900.00 02 Bidder $289.00 $289.00 03 Bidder' $2,200.00 . $2,200.00 04 Bidder $1,750.00 ' $1,750.00 OS Bidder $1,500.00 $1,500.00 068idder $1,785.00 $1,785.00 07 Bidder $199.22 ' $199.22 OB Bidder $1,970.00 $1,970.00 SP 09040 Relocate F~cisfing Drain Pipe 70 LF $25.00 $1,750.00 01 Bidder $8.25 $57750 02 Bidder $11.55 .$80850 03 Bidder; $18.90 $1,323.00 04 Bidder $11.10 $777.00 05 Bidder $35.00 $2 A50.00 06 Bidder; $6.00 $420.00 07 Bidder $21.83 $1528a0 088/dder $5.00 $350.00 SP 1003.4.1.8.1 Fiber Wattles 690 LF $4.00 $2,760.00 01 Bidder $1.60 ', $1104.00 OZ Bidder $2.04 $1,407,60 03 Bidder $2.10 $1,449.Q0 04 Bidder $1.65 $1,138.50. OS Bidder $2.00 $1,380.00 :06 Bidder; $2.00 $1,3$0.00 07 Bidder $1.77 $1,221.30 08 Bidder $2.20 $1,518.00 SP 1004.4.1.F.1 Temporary Coffer Dam 6 F~1 $1,000.00 $6,000.00 _. 01 Bidder $410.00 $2,460.00 : 02 Bidder $2,666.00 $15,996.00 ; 03 Bidder: $350.00 $2,100.00 04 Bidder _. ... $2,666.00 ' ...._....,._. ......._ .............. $15,996.00 .............. _ ......... OS Bidder ......_. __.... $7,500.00 . _....... $45,000.00 ._t...... ...._....._.... 06 Bidder; ............ $340.00 $2,040.00 07 Bidder $3,311.06 $19,866.36 OB Bidder $380.00 .$2,280.00 SP 1006.4.1.C.1 Inlet Protection 11 F~4 $100.00 $1,100.00 01 Bidder $45.00 $495.00 02 Bidder $78.75 $866.25 03 Bidder' $82.00 $902.00 04 Bidder $139.50 $1,534.50 OS Bidder $100.00 $1 100 00 s 06 Bidder; ; $95.00 $1,045. 07 Bidder $63.58 __ $699.38 08 Bidder $85.00 $935.00 SP 11220 Remove & Salvage Traffic Sign 13 EA $75.00 $975.00 01 Bidder $20.70 $269.10 02 Bidder $26.25 $34125 < 03 Bidder; $26.25 $341.25 04 Bidder $25.00 $325.00 OS Bidder $27.00 $35100 06 Bidden $25.50 $331.50 07 Bidder $26.49 $344.37 08 Bidder $28.25 $367 25 4/27/2009 Page 5 ~SP 11222 Remove/Reset Traffic Sign ~ _7 ~ F~ ~ $125.00 _ $875.00 01 Bidder $30.00 ' $210.00. OZ Bidder $26.25 $183.75 :03 Bidder; $26.25 $183:75 04 Bidder $25.00 $175.00 05 Bidder $30.00 $210 00 06 Bidder' $25.50 $178.50 07 Bidder $26.49 ' $185.43 08 Bidder $28.25 $197.75 SP 20003 Construct Temporary Fence _.. 88 LF .. $2.50 $220.00 018idder $2.40 $211.20 02 BJdder $5.25 $462 00 ; :03 Bidder. $3.15 $277.20 04 Bidder $1.50 $132.00 OS Bidder $5.00 $440.00 06 Bidder. $3.00 $264.00 __ _ _ 0781dder $5.30 $466.40 OBeidder $5.75 $506.00 SP 20009 Remove and Reset Fence 770 LF $18.00 $13,860.00 Ol Bidder $7.30 ' $5,621.00 02 BJdder $7.88 $6,067.60 03 BJdder; $3.80 $2,926.00 04 Bidder $7.50 $5,775.00 OS Bidder $7.50 $5,775.00 ~ 06 Bidder; $7.00 $5,390.00 ': 0781dder $7.95 $6,121.50 OBBidder $8.50 $6,545.00 SP 20030 Remove & Salvage Guardrail 650 LF $15.00 $9,750.00 01 Bidder $5.50 $3,575.00 O2 Bidder $5.77 $3,750.50 03 Bidden $5.75 $3,737.50 I 04 Bidder $5.50 $3,575.00 OS BJdder $5.00 $3,250.00 06 BJdder' $4.00 $2,600.00 07 Bidder $5.83 $3,789.50 OS Bidder $6.25 $4,06250 SP 20102 Guardrail -metal 1260 LF $25.70 __.... $32,382.00 01 Bidder $20.35 $25,641.00 02 Bidder $20.74 $26,132.40 ; 03 Bidder. $20.75 $26,145.00 04 Bidder $19.80 $24,948.00 OS BJdder $21.00 $26 460 00 06 Bidder: $20 00 $25,200 00 0781dder $20.93 $26,377,.80 088Jdder $22.25 $28,035.00 SP 25030 Demolish & Remove Existing Building 1 LS $36,000.00 $36,000.00 018Jdder $3,100.00 $3,100.00 02 Bidder $3,150.00 $3,150.00 :03 Bidder? $3,150.00 $3,150.00 04 BJdder $3,200.00 $3,200.00 OS Bidder $2,000.00 $2000 00 06 Bidder; $3,060.00 $3,060.00 07 Bidder $12,436.58 $12,436.58 08 Bidder $6,740.00 $6,740 00 SP 25063 Property Owner Meetings ____ - - __ _ _ __ -- - - 2 EA _ __ - - $500.00 --- - -- $1,000.00 - -- - 018idder $500.00 $1,000.00 OZ Bidder $1.00 _ $2.00 r 03 Bidder; - $200.00 - - $400.00 04 Bidder. $500.00 $1,000.00 OS Bidder $500.00 $1,000 00 06 Bidder: $150.00 $300.Q0 07 Bidder $1,589.51 $3,179.02 08 Bidder $300.00 $600 ~ SP 25075 Realign Five Mile Creek 860 LF $150.00 $129,000.00 01 Bidder $35.00 ' $30,100.00 02 Bidder $30.00 $25,800.00 03 Bidder; $40.00 $34,400.00 04 Bidder $23.00 ' $39,780.00 OS Bidder $87.00 $74,820.00 06 BJdder; $50.00 $43,000.00 07 BJdder $28.97 $24,914.20 08 Bidder $87.00 $74,820.00 SP 25080 Remove/Reset Mailbox 5 EA $125.00 $625.00 01 Bidder $125.00 $625.00 02 Bidder $105.00 $525 ~ 03 BJdder; $105.00 $525.00 04 Bidder $100.00 $500.00 OS Bidder $125.00 $625.Q0 <.. 06 e/dder $100.00 $SW.00 07 BJdder $105.97 ' $529.85 08 Bidder $110.00 $550.00 SP 29053 Dirt Berm - 2' wide x 1' tall 825 LF $4.00 $3,300.00 01 Bidder $1.50 ' $1,237.50 02 Bidder $1.00 $825. 03 Bidder; $0.00 $0.00 04 Bidder $1.25 $1,031.25 OS Bidder $1.00 $825.00 : 06 Bidder: $1.80 $1,485.Q0 0781dder $6.73 ' $5,552.25 OS Bidder $0.65 $536.25 SP 29065 Sod Repair 85 SY $9.00 $765.00 01 Bidder $15.00 ' $1,275.00 02 BJdder $15.75 $1,33$ 75 03 Bidder; $10.50 $89250 04 Bidder $15.00 $1,275.00 OS Bidder $16.00 $1,360.00 06 Bidder: $9.00 $765.Qp 07 Bidder $15.90 $1,351.50 OS Bidder $9.50 $80750 SP 29090 Trim Tree, 8' Above Sidewalk 2 F~ $200.00 $400.00 Ol Bidder $150.00 $300.00 02 Bidder $36.75 $7350 03 Bidder $37.00 $74.00 04 Bidder $35.00 ' $70.00 OS Bidder $450.00 $900.00 :06 Bidder. $36.00 $72.00 0781dder $211.94 $423.88 088/dder $56.00 $112.00 SP 29093 Remove Tree 6-inches/+ 35 EA $350.00 $12,250.00 01 Bidder $170.00 $5,950.00 OZ Bidder $178.50 $6,247.50 03 BJdder' $180.00 $6,300.00 04 Bidder $170.00 $5,950.00 OS Bidder $195.00 $6 825 00 06 Bidder; $175.00 $6,125.00 , 07 Bidder $52.98 ' $1,854.30 08 Bidder $41.00 _. _.. $1,435.00 SP 29100 Repair Sprinkler System 220 LF $18.00 $3,960.00 01 Bidder $7.25 $1,595.00 02 Bidder $6.30 $1386 00 03 Bidder $6.30 _. _ $1,386.00 04 BJdder $6.00 ' $1,320.00 OS Bidder $6.50 $1,430 00 06 Bidder $3.10 $682.00 ', 07 Bidder $6.36. $1,399.20 OS Bidder $13.50 $2 970 00 4/27/2009 Page 6 SP 70016 Diffuser Boulders - 2' ~ 50 FA $250.00 $12,500.00 01 Bidder $60.00 $3,000.00 02 Bidder $61.95 $3,097.50 :03 Bidder' $20.00 $1,000.00 !, 04 Bidder $59.60 $2,980.00 OS Bidder $2.00 $100.00 06 Bidder $110.00 $5,500.00 07 Bidder $54.69 ' $2,734.50 08 Bidder $56.00 $2,800.00 SP70022 Remove F~dsting Bridge Structure _ __ 1 LS _ $36,000.00 $36,000.00 0181dder $4,200.00 $4,200.00 02 8ldder $4,200.00 $4,200.Ofl , 03 Bidder. $4,700.00 __._. $4;700.00 04 BJdder $4,500.00 $4,500.00 OS Bidder $5,000.00 $5,000.00 06 Bidder $4,590.00 $4,590.00 078Jdder $13,428.09 ! $13,428.09 OS Bidder $5,080.00 $5,080.00 SP20105A GuaMrail Terminal Type 7 1 EA $1,422.00 $1,422.00 01 BJdder $980.00 $980.00 02 Bidder $992.25 $992.25 03 Bidder $1,000.00 $1,000.00 04 Bidder $945.00 $945.00 OS Bidder $1,100.00 $1,100.00 06 Bidder $965.00 $965.00 07 Bidder $1,001.39. $1,041.39 08 Bidder $1,070.00 $1,070.00 SP20105B Guardrail Terminal Type 8 1 EA $1,845.00 $1,845.00 01 Bidder $1,600.00 ' $1,600.00 02 Bidder $1,575.00 $1,575.00 03 Bidder; $1,500.00 $1,500.00 04 Bidder $1,500.00 $1,500.00 05 Bidder $1,600.00 „$1,600.00 06 Bidder $1,530.00 $1,530.00 0781dder $1,589.51 ' $1,589.51 088/dder $1,690.00 $1,690.00 _ _ _ __ _ _ - Estimate $3,403,989.82 018~dder ~ $2,041,869 OS ~ 02 Bidder: $1,971,926130 i 03 Bidder $1,992,827.83 04 Bidder $2,118,228.47 05 Bidder - --- $2,249 098 65 O6 Bidder. -_..... _ ._ $2,298,589.00 _...___ 07 Bidder $2,267,092.92 ~ 08 Bidder $2,862,720 45 Schedule 1b -Ustick Rd and Linder Rd Intersection {Altern ate No. 2~ IN202-07 305048 Ustick Rd and Lender Rd Estimate ~0202.4.1.A.1 Excavation 24910 CY 01 BJdder $7.65 $190,561.50 02 Bidder $6.15 $153,196.50 ~ 03 Bidder; $6.15 $153,196.50 ', 04 Bidder $6.95. $173,124.50 OS Bidder $5.00 _ $124,550.00 ' 06 Bidder $8.50 _ _ ___ $211,735.00 078idder $3.94 $98,145.40 OSe/dder $9.50 $236,645.00 0202.4.5.A.1 Unsuitable Material Excavation I 1200 I CY 01 Bidder $19.38 $23,256.00 02 Bidder $13.00 $15,600.00 ` 03 Bidder; $5.80 $6,960.00 04Bidder $30.00 $36,000.00 OS Bidder $15.00 $18,000.00 ! 06 Bidder' $20.00 $24,000.00 07 Bidder $6.11 $7,332.00 08 Bidder $9.75 $11,700.00 I0204.4.1.A.1 Structural Excavation l 883 I CY 01 Bidder $11.22 ! $9,907.26 02 Bidder $8.00 $7,064.00 ? 03 Bidder: $13.00 $11,479.04 04 BJdder $13.30 $11,743.90 OS Bidder $10.50 $9,271.50 :06 Bidder: $13.25 $11,699.75 07 BJdder $12.39 $10,940.37 0881dder $14.75 $13,024.25 0206.4.1.8.1 Nydroseeding - dryland grass I 2 4 I AC 01 Bidder $2,040.00 _. $4,896.00 02 BJdder. $1,449.00 $3,477.60 :03 8ldder _ .... $1,450.00 _. $3,480.00 04 Bidder $1,380.00 $3,312.00 OS Bidder $1,200.00 $2,880.00 06 Bidder $1,730.00 $4,152.QD 07 Bidder $1,462.35: $3,509.64 08 Bidder $3,440.00 $8,256.00 0207.4.1.A.01 Removal of Obstructions 1 LF 01 Bidder $1,428.00 $1,428.00 02 Bidder $5,736.00 $5,736.00 03 Bfdder' $12,000.00 $12,000.00 !, 04 Bidder $5,464.00 ! $5,464.00 OS Bidder $25,000.00 $25,000.00 06 Bidder; $25,600.70 $25,600.70 0781dder $11,854.92 ! $11,854.92 08 Bidder $25,000.00 $25,000.00 .; 0601.4.1.A.01 C RCP, Class III -18" dia. 66 LF 01 Bidder $46.10 $3,042.60 02 Bidder $51.45 $3,395.70 :03 Bidder: $29.40 $1,940.40 ', 04 Bidder $49.50 $3,267.00 OS Bidder $53.00 $3,498.00 06 Bidder' $50.00 $3,300.Q0 078idder $56.22 $3,710.52 ' OS Bidder $69.00 $4,554.00 0601.4.1.A.09 PVC C-905, 30" dia. 10 LF 01 Bidder $118.98 $1,189.80 02 Bidder $132.30 $1,323.00 03 8ldder; $91.35 $913.50 04 Bidder $127.50 $1,275.00 OS Bfdder $150.00 $1500 00 06 Bidder; $93.00 $930.00 07 Bidder $158.85 $1,588.50 08 Bidder $170.00 $1 700 DD 0601.4.1.A.09 A PVC SDR35, 1 2"dia. 456 LF 01 Bidder $25.19 $11,486.64 .02 Bidder $19.95 $9 097 20 :03 Bidder! $18.90 $8,618.40 04 Bidder. $19.20 $8,755.20 OS Bidder $27.45 $12,517 20 06 Bidder':. $21.00 $9,576.00 07 Bidder. $23.91 $iQ902.96 OB Bidder $26.25 $11970 ~ 0601.4.1.A.09 B PVC SDR 35, 18" dia. 332 LF 01 Bidder $34.94: $11,600.08 02 Bidder $40.95 $33,595.40 03 Bidder $26.25 $8,715.00 04 Bidder $39.40 $13,080.80 OS BJdder $39.50 $33 ii4 00 06 8ldder $29.00 $9,628.00 07 Bidder $88.48 .$29,375.36 OS Bidder $40.00 $13,280 00 4/27/2009 Page 7 ~0601.4.1.A.09 C PVC SDR 35, 24" dia• I 74 LF O181dder $46.16 ' $3,415.84 02 Bidder $64.05 $4,739.70 :03 Bidder; $81.90 $6,060.60 04 Bidder $61.60: $4,558.40 OS Bidder $80.00 $5,920.00 06 Bidder $41.00 $3,034.00 07 Bidder $61.23 ' $4,531.02 OS Bidder $55.00 $4,070.00 0601.4.1.A.09 D PVC, Closed Profile - 42" dia. 1 241 LF 01 Bidder $88.74 $110126.34 02 Bidder $96.60 $119,880.60 , 03 Bidder $102.90 $127,698.90 04 Bidder $92.90 $115,288.90 OS Bidder $90.00 $111,690.00 06 Bidder; $96.00 $119,136.00 07 Bidder $102.87 $127,661.67 OBBidder $110.00 $136,510.00 0601.4.1.A.09 E PVC C-900 -12"dia. 193 LF 01 Bidder $27.13 ' $5,236.09 02 Bidder $24.15 $4,660.96 03 Bidder $27.30 $5,268.90 04 Bidder $23.20 ' $4,477.60 OS Bidder $30.00 $5,790.00 06 Bidder: $27.00 $5,211.00 O78idder $68.20 $13,162.60 O881dder $31.00 $5,983.00 0602.4.1.E.1 Catch Manhole - 48"dia. 3 Ei4 01 Bidder $2,366.40 $7,099.20 02 Bidder $1,995.00 $5,985.00 03 Bidder: $1,890.00 $5,670.00 04 Bidder $2,169.00 $6,507.00 OS Bidder $1,800.00 $5,400.00 06 Bidder! $1,820.00 $5,460.00 07 Bidder $2,331.97 ' $6,995.91 0881dder $1,920.00 $5,760.00 0602.4.1.E.1 A Manhole, Type B - 96"dia. 7 EA 01 udder $9,690.00 $67,830.00 02 Bidder $10,458.00 $73,206.00 03 8ldder, $9,135.00 $63,945.00 04 Bidder $10,312.00 $72,184.00 OS Bidder $8,500.00 $59,500.00 06 Bidder; $8,840.00 $61,880.00 0781dder $9,242.73 $64,699.11 OS Bidder $10,320.00 $72,240.00 0602.4.1.F.1 Catch Basin - Type I 11 EA 01 Bidder $408.00 ' $4,488.00 02 Bidder $787.50 $8,662.50 03 Bidder; $631.00 $6,941.00 04 Bidder $750.00 ', $8,250.00 OS Bidder $550.00 $6,050.00 06 8ldder; $765.00 $8,415.00 07 Bidder $413.27 $4,545.97 08 Bidder $850.00 .$9,350.00 0703.4.1.A1 Construct Concrete Wingwalls & Footings 83 CY 01 Bidder $561.Q0 $46,563.00 02 Bidder $467.25 $38,781.75 ; 03 Bidder. ... $467.00 ........_. $38,761.00 04 Bidder $454.00 $37,682.00 OS Bidder $700.00 $58,100.00 06 Bidder $455.00 $37,765.00 07 8ldder $364.52 $30 255.16 08 Bidder $500.00 $41,500:00 0704.4.1.A1 Stiftleg Box Culvert (3 sided) 12' span x 10' rise 198 LF 01 Bidder $1,428.00 $282,744.00 02 Bidder $1,207.50 $239,085.00. 03 Bidder; $1,250.00 $24750000 04 Bidder $1,174.00 $232,452.00 OS Bidder $1,450.00 $287,100.00 06 Bidder: $1,175.00 $232,650.00 07 Bidder $1,187.36 $235,097.28 08 Bidder $1,390.00 $275,220.00 . 0706.4.1.A.5 Standard 6" Vertical Curb $ Gutter 3359 LF 0181dder $6 89 $23 143.51 02 Bidder $7.87 $26,435.33 ' 03 Bidder $7.60 $25,528.40 04 Bidder $9.90 ! $33,254.10 OS Bidder $7.80 $26,200.20 € 06 8ldder; $7.50 $25,192.50 07 Bidder $8.16 $27,409.44 OB Bidder $8.50 .$28,551.50 0706.4.1.8.1 Concrete Valley Gutters 213 LF 01 Bidder $14.89 $3,171.57 02 Bidder $26.25 $5,591.25 03 Bidder; $16.80 $3,578.40 04 Bidder $29.70 $6,326.10 OS Bidder $18.15 $3,865.95 O68idder $25.50 $5,431.50 0781dder $19.07 i $4,061,91 0881dder $28.25 $6,017.25 0706.4.1.E.1 Concrete Sidewalks 2263 SY 01 Bidder $14.79 $33,469.77 02 Bidder $18.38 $41,59394 :03 Bidder; $18.80 $4254440 04 Bidder $20.20 ' $45,712.60 05 Bidder $18.35 $41,526 05 ` ' 06 Bidder $18.00 $40,734.00 07 Bidder $16.53 $37,407.39 08 Bidder $19.75 $44,694.25' 0801.4.1.8.1 08" Minus Uncrushed Aggregate Base 28845 TN 01 Bidder $5.10 $147,114:60 02 Bidder $4.50 $129,807.00 03 Bidder $5.50 $15$,653.00 04 Bidder $5.95 $171,633.70 OS Bidder $8.00 $230 768 00 b 06 8ldder: $6.80 $196,152.80 0781dder $9.46: $272,883.16 08 Bidder $14.75 $425,478.50 0802.4.1.8.1 Crushed Aggregate for Base, Type 3/4" 5923 TN 01 Bidder $11.22 $66,456.06 02 Bidder $8.90 $52,714:70 03 Bidder' $12.00 $71,076.00 O48idder $14.10 $83,514.30.. OS Bidder $10.35 $61,303.05 : O68idder' $14.00 $82,922.00 07 Bidder $14.33 $84,876.59 08 efdder' $24.00 $142152.00 1.A.1 Plant Mix Pavement - 4" __ __ 01 Bidder $68.85 $411,034.50 02 Bidder $56.00 $334,32C 04 Bidder $82.00 $489,540.00 OS Bidder $68.50 ~ $408 94° __ _ ___~: O78idder $68.88 $411213.60 OBBidder $76.00 $453,72C 5970 ITN L -- 0 03 Bidder; $72.10 $430,437.00 0:06 Bidder; $66.30 $395,811.00 4/27/2009 Page 8 1103.4.1.A1 Flaggers ~ 160 ~ HR 01 Bidder $17.85 $2,856.00 02 Bidder $17.65 $2,824.00 :03 Bidder; $18.90 $3,024.00 <'. 04 Bidder $18.00 $2,880.00 05 Bidder $19.00 $3,040.00 06 Bidder; $18.50 $2,960.00 07 Bidder $23.00 $3,680.00 08 8idder $20.25 $3,240.00 . _...._ 1103.4.1.8.1 Traffic Control Signs 232 SF 01 Bidder $1.53 $354.96 02 Bidder $5.25 $1,218.00 03 Bidder; $3.15 $730.80 04 Bidder $3.00 $69b.00 OS Bidder $3.25 $754.00 06 Bidder; $3.00 $696.00 __ _ __ 07 BJdder $3.18 _ _. .$737.76 OS Bidder $3.50 $812.00 1103.4.1.C.1 Traffic Control Barricades, Type III 5 F~ 01 Bidder $204.00 $1,020.00 02 BJdder $39.90 $199.50 03 Bidder' $47.25 $236.25 ', 04 Bidder $45.00 ! $225.00 OS Bidder $47.00 $235.00 06 Bidder $46.00 $230.OD 0781dder $47.69 $238.45 OS Bidder $51.00 $255.00 1103.4.1.G.1 Portable Tubular Markers 400 F0. 01 Bidder $5.00 ! $2,000.00. 02 BJdder $7.66 $3,064.00 03 Bidder; $6.30 $2,520.00 04 Bidder $6.00 ! $2,400.00 05 Bidder $6.50 $2,600.00 06 8idder $6.00 $2,400..00 07 Bidder $6.36 ! $2,544.00 OS Bidder $6.75 $2,700.00 1103.4.1.J.1 Traffic Control Maintenance 1 60 HR 01 BJdder $18.87 ' $3,019.20 02 Bidder $22.05 $3,528.Q0 03 Bidder $21.00 $3,360.00 04 BJdder $20.00 $3,200.00 OS Bidder $0.00 $0.00. ; 06 Bidder; $20.50 $3,280.00 07 BJdder $21.19 $3,390.40 08 Bidder $22.50 $3,600.00 1131.01.01 Traffic Signal and Illumination System Complete 1 LS $161,500.00 $161,500.00 01 Bidder $81,600.00 ! $81,600.00 02 Bidder $79,758.00 $79,758.00 03 BJdder; $80,000.00 $80;000.00 04 Bidder $75,960.00 $75,960.00 OS Bidder $79,758.00 $79,758.00 06 Bidder; $121,400.00 $121,400,00 0781dder $80,492.87 $80,492,87 088idder $85,680.00 $85,680.00 1134.03.18 Pavement Markings {Paint) 7770 SF $1.50 $11,655.00 01 Bidder $0.36 $2,797.20 02 Bidder $0.32 $2486.40 .03 Bidder $0.30 $2,331.00 04 Bidder $0.30 $2,331.00 OS e/dder $0.50 $3,885.00 06 Bidder; $0.31 $2,408.70 07 Bidder $0.37 $2 874.90 OS 8idder $0.40 $3,108.00 1134.05.18 Pavement Markings (Thermoplastic) 1710 SF $6.50 $11,115.00 018idder $6.99 ': $11,952.80 02 Bidder $7.09 $12,123.90 :03 8idder: $7.00 $11,970.00 04 Bidder $6.75 ', $11,542.50 OS Bidder $7.00 $11,970.00 ' 06 8idder: $7.05 $12,055.50 07 BJdder $7.26 $12,414.60 OS Bidder $7.75 $13,252.50 , 1135.01.01 Roadside Traffic Sign Installation (One Metal Post) 21 FA $150.00 $3,150.00 01 Bidder $26.32 _____ $552.72 02 Bidder $26.25 $551.25 ; 03 e/dder _ $26.25 - ....... $551.25 .............. 04 Bidder............ $25.00 $525.00 05 Bidder - $27.00 $567.00 :06 8idder _ $75.50 $535.50 07 Bidder $26.49 $555,29 08 Bidder $28.25 $593.25 2010.4.1.A1 Mobilization 1 LS 01 Bidder $1,860.94 $1,860.94 02 Bidder $51,500.00 $51,500.00 :03 BJdder: $30,440.00 $30,440.00 04 Bidder $30,000.00 .$30,000.00 OS Bidder $50,000.00 $5Q000.00' 06 Bidder; $199,000.00 $199,000.00 078Jdder $132,130.00 $132130.00. 08 Bidder $146,210.00 $146,210.00 2030.4.1.A.1 Manhole, Adjust to Grade . . -- - - ---.... _ 10 F~ .._._.._.......__..... . ........................-- -- -- _._.._.._...---__ ................._.._.............._..............._ 01 Bidder $341.70 ..... .......... - $3,417.00 02 Bidder $314.00 $3,140.00 . r 03 Bidder; $262.50 - $2,625.00 ._. 04 Bidder $500.00 $5,000.00 OS Bidder $500.00 $5,000.00 ! 06 Bidder; $260.00 _ ~, $2,600.00 ': 07 Bidder $715.28 ' $7,152.80 OS Bidder $310.00 $3,100.00 . 203-005A Partial Concrete Removal - Wi ngwalls 1 LS $3,450.00 $3,450.00 01 Bidder $7,650.00 ? $7,650.00 02 Bidder $7,350.00 $7,350.00 03 Bidder: $7,350.00 $7,350.00 04 Bidder $7,000.00 $7,000.00 OS Bidder $3,500.00 $3,500.00 , 06 Bidder $7,140.00 $7,140.00 07 Bidder $14,731.49 ': $14,731.49 OS Bidder $7,900.00 $7,900.00 203-065A Removal of Curb 50 FT $11.74 $587.00 01 Bidder $5.10 ' $255.00 02 Bidder $26.25 $1,312.50 03 Bidder; $26.25 $1,312.50' '. 04 Bidder $25.00 $1,250.00 OS Bidder $3.00 $150.00 06 Bidder; $2550 $1,275.00 07 Bidder $8.90 $445.(Hl ' OS BJdder $28.25 .$1,412.50 2040.4.1.A 1 Fence wi privacy slats, Chain Link - 06' 1 156 LF - 01 Bidder $21.42 _ _ __ $24,761.52 02 Bidder $18.66 $21,570.96 - 03 Bidder' $25.30 _. $29,246.80 04 BJdder $17.80 $20,576.80 OS Bidder $18.50 $21,386.00 06 Bidder $22.00 $25,432.00 ', 07 Bidder $18.83 $21,767:48 OS Bidder $20.00 $23,120.00 4/27/2009 Page 9 2050.4.1.A2 Loose riprap -12" ~ 220 I CY 01 Bidder $30.60 I $6,732A0 02 Bidder $50.40 $11,088.00 03 BJdder $52.50 T $11,550.00 '', 04 Bidder $62.10 $13,662.00 OS Bidder. $20.00 $4,400.00:06 Bidder: $68.00 $14,960.00 0781dder $51.71 ' $11,376.20 08Bldder $76.00 $16,720.00 210-005A Structure Excavation Sch. No. 1 960 CY _ $18.40 $17,664.00 01 Bidder $10.20 $9,792 00 02 Bidder $8.00 _....._ $7,680.00 ; 03 Bidder $13.00 $12,480.00 04 Bidder $13.30 $12,768.00 OS 8ldder $8.00 $7,680.00 06 Bidder; $13.25 $12,720.00 07 Bidder $11.90 $11,424.00 __. 088idder $14.75 __ '$14,160.00 210-015A Compacting Backfill 792 CY $16.10 $12,751.20 01 Bidder $9.18 $7,274.56 02 Bidder $7.50 $5,940.Q0 03 BJdder; $15.00 $15,880.00 04 Bidder $15.30 ' $12;117.60 OS Bidder $4.00 $3,168.00 06 8ldder $15.30 , 'r $12,117 60 07 Bidder $13.99 $11,080.08 OS Bidder $52.00 $41 184.00 '; 502-025A Concrete Class 40A 56 CY $575.00 $32,200.00 01 Bidder $714.00 $39,984.00 02 Bidder $661.50 .$37,044.00 ' 03 Bidder; $660.00 $36,960.OU 04 Bidder $643.00 ' $36,008.00 OS Bidder $650.00 $36;400.00 06 BJdder; $643.00 '$36,008.00 07 Bidder $306.41 $17,158.96 OS Bidder $710.00 $39,760.00 502-030A Concrete Class 40B 181 CY $632.00 $114,392.00 01 Bidder $408.00 $73,848.00 02 Bidder $367.50 $66,517.50.03 BJdder _. $367.00 $66,427.00 04 Bidder $357.00 $64,617.00 OS Bidder $570.00 $103,170.00 , 06 Bidder $357.00 $64,617.00 07 Bidder $285.85 $51,738.85 08 BJdder $430.00 $77;830.QO 503-010A Metal Reinforcement Sch. No. 1 12251 LB $1.55 $18,989.05 01 Bidder $0.97 $11,883.47 02 Bidder $0.88 $10,780.88 03 Bidder: $0.88 $10,780.88 ', 04 Bidder $0.85 $10,413.35 OS Bidder. $0.80 $9,800.80 06 8ldder; $0.85 $10,413.35 07 Bidder. $0.60 $7,350.60 OB BJdder $0.95 $11,638.45 503-015A Metal Reinforcement Sch. No. 2 20135 LB $1.67 $33,625.45 01 Bidder $0.92 $18524.20 02 Bidder $0.84 $16,913.40:03 Bidder $0.88 $17;718.80 04 Bidder $0.80 $36,108.00 OS Bidder $0.80 $16,108.00 06 Bidder $0.82 $16;510.70 07 Bidder $0.58 $11678.30 08 Bidder $0.90 $18,121.50 504-040A Combination Pedestrian/Traffic Rail 49 LF $26450 $12,960.50 018idder $367.20 $17,992.80 02 Bidder $367.50 $18,007.50 03 Bidder; $600.00 $29,400.00 04 Bidder $357.00 $17,493'.00 OS Bidder $370.00 $18,130:00 06 Bidder: $357.00 $17,493.00 ', 078idder $237.08 $11,616.92 0881dder $390.00 $19,130.00 511-005A Concrete Waterproofing System, Type D 126 SY $3a.50 $4,347.00 01 Bidder $30.60 $3,855.60 02 Bidder $24.15 $3,042.90:03 Bidder' $24.00 $3,024.00 04 Bidder $23.50 $2,961.00 OS Bidder $18.00 $2,268.00 06 8ldder; $23.50 $2,961.00 07 Bidder $22.25 $2,803.50 OS Bidder $26.00 $3,276.00. 612-150A Temporary Concrete Guardrail 120 FT $28.61 $3,433.20 01 Bidder $28.05 ': $3,366.00 02 Bidder $28.61 $3,433.20 T 03 Bidder; $28.60 $3,432.00 04 Bidder $27.30 ' $3,276.00 OS Bidder $30.00 $3,600.00'. 06 BJdder; $27.80 $3,336 00 07 Bidder $28.88 $3,465.60 08 Bidder $30.50 $3,660.00 1612-155A Concrete Terminal Section 1 LS $431.25 $431.25 018idder $295.80 $295.$0 02 Bidder $598.50 $54850 03 Bidder: $300.00 $300.00 '' 04 Bidder $285.00 $285.00 05 Bidder $300.00 $300.00 06 Bidder $291.00 $291.00 07 Bidder $302.01 $302.01 08 Bidder $320.00 $320.0 624-005A Loose Riprap 41 CY $40.25 $1,650.25 01 Bidder $30.60 $3,254.60 02 8ldder $70.35 $2,884.35 ? 03 Bidder $50.25 $2;060.25 04 Bidder $68.40 ' $2,804.40 OS Bidder $25.00 $1,025.00 06 Bidder; $68.00 $2,788.00 07 Bidder $51.71 ' $2,120.11. OS Bidder $76.00 $3,116.00 5500-11A Dewrater Foundation -Abutment 1 LS $11,500.00 $11,500.00 01 Bidder $21,420.00 ' $21,420.00 02 Bidder $15,750.00 $15,750.00 ' 03 Bidder` $15,750.00 $45,750.00 04 Bidder $15,310.00 $15,310.00 OS Bidder $5,000.00 _.. $5,000.00 ', 068idder $15,300.00 $15,300.00 0781dder $45,885.01 $45,885.01 08 Bidder $16,920.00 ..$16,920.00 S501-35A Removal of Asphalt Overlay __ 01 Bidder $4.23 $854.46 02 Bidder - - 04 Bidder $53.50: $10,807.Q0 OS Bidder 07 Bidder $16.28 $3 288.56 OS Bidder ~ _.202 ~ sY~ $z3.oo $4sas.oo_ _J $51.97 $10 497 94 03 Bidder $2.10 $424.20 $51.50 $10,403 00 ! 06 8ldder: $3.65 $737.30 ', 561.00 $12 322 00 4/27/2009 Page 10 15501-90A Temporary Shoring ~ 348 ~ SF ~ $34.50 $12,006.00 01 Bidder $35.70 $12,423:60 02 Bidder $31.50 $10,962.00 03 8/dder' $31.50 ~ $IO;962.OQ 04 Bidder $30.60 $1Q648:80 OS Bidder $57.50 $20,010.00 ' 06 Bidder $30.60 $10,648.80 07 Bidder $57.55 $20,027.40 08 Bidder $34.00 $11,832.00 SP 02020 Gravel Repair 203 SY 01 Bidder $5.61 $1,138.83 02 Bidder $2.50 $507Sfl _.. . 03 Bidder $9.40 $1,908.20 04 Bidder $5.50 ' $1,.116.50 OS Bidder $3.40 $690.20 06 Bidder; $7.00 $1,421.00 0781dder $7.13 ' $1,447.39 0881dder $8.00 $1,624.00 SP 06011 Pond Outlet Structure 1 EA 01 Bidder $3,284.40 $3,284.40 02 Bidder $4,195.00 .$4,195:00 (03 Bidder; $3,500.00 $3SOO.OD 04 Bidder $3,000.00 $3,000.00 OS Bidder $3,000.00 $3,000.OD 06 Bidder: $3,060.00 $3,060.00 07 Bidder $4,963.99 $4,963.99 08 Bidder $3,450.00 $3,450.00 SP 06012 Pond_Access Road _ -- -_- _ __.._-_ 1 3 92 SY 01 Bidder $6.94 - $9,660.48 02 Bidder --- $5.25 ___ $7,308.00 __ 03 Bidder -__..._$6.75_- -- $9,396.00 04 Bidder $8.10 ', $11,275.20 DS Bidder $2.50 $3,480.00 ` 06 Bidder; $7.00 $9,744.00 07 Bidder $14.00 ' $19,488.00 OS Bidder $11.50 $16,008.00 SP 07001 Concrete Apron - 42" dia. 1 F~1 01 Bidder $2,468.40 ' $2,468.40 02 Bidder $3,085.00 $3,085.00 ; 03 Bidder, $2,940.00 $2,940,00 04 Bidder $2,968.00 $2,968:00. 05 Bidder $2,500.00 $2,500.00 , 06 Bidder, $2,200.00 $2,200.00 ', 0781dder $2,322.49 ' $2,322.49 088idder $2,360.00 $2,360.00 ; SP 07002 Remove and Salvage Jersey Barrier to ACHD 220 LF 01 Bidder $14.79 $3,253.80 OZ Bidder $15.22 $3,348.40 03 Bidder; $15.25 $3,355.00 04 Bidder $14.50 $3,19fl.00 OS Bidder $11.36 $2 499 20 06 Bidder: $8.00 $1,760.00 07 Bidder $15.37 $3,381.40 08 Bidder $16.25 $3,575.00 SP 07011 ADA Pedestrian Ramps 24 F~1 01 Bidder $224.40. $5,385.60 02 Bidder $583.80 $14 01120 03 Bidder $263.00 $6,312.00 04 Bidder $659.50 $15,$28.00 OS Bidder $240.00 .$5,760.00 06 Bidder; $570.00 $13,680.00 ', 07 Bidder $471.56 $11,317.44 OS Bidder $630.00 $15 120 Ofl SP 08105 Temporary Paving 10667 SY 0181dder $9.38 ' $100,056.46. 02 Bidder $10.50 $112,003.50 03 Bidder; $0.00 $0:00 04 Bidder $0.01 $106.67 OS Bidder $8.00 $85,336.00 ! 06 Bidder; $11.50 $122,670.50 07 Bidder $11.19 $119,363.73 08 Bidder $15.00 $160,005.00 SP 08120 Asphalt Repair 473 SY 01 Bidder $18.36 $8,684.28 02 Bidder $10.75 $5,084 75 03 Bidder $17.60 $8,324.80 04 Bidder $21.60 ' $10,216.80 OS Bidder $13.50 $6,3$5.50 06 Bidder; $18.60 $8,797.80 07 Bidder $23.51 ', $11,120.23 OS Bidder. $19.50 $9,223.50 . SP 08126 Asphalt Bike Path - 7' 715 SY 01 Bidder $11.22 ' __--- -- $8,022,30 -.......- - -._. 02 e/dder _. $10.00 . $7,150 00 03 Bidder; $14.50 $30,367:50 04 Bidder $14.10 - $10,081.50 OS Bidder ... _ $10.00 - $7,150 00 ---.. n _ 06 Bidder _..------ $15.80 - $11,297.00 07Hidder $15.20 ' $10,86$:00 088/dder $18.25 $13,048.75 SP 09022 Concrete Headwall 1 FA 018/dder $918.00 $918.00 02 Bidder $289.00 $2$9.Ofl 03 Bidder: $2,200.00 $2,200.00 04 Bidder $1,750.00. $1,750.00 OS Bidder $1,500.00 $].,500.00 06 Bidder; $1,785.00 $1,7$5.00 07 Bidder $199.22 $199.22 08 Bidder $1,970.00 $1,970.00. SP 09040 Relocate F~cisting Drain Pipe 70 LF 01 Bidder $8.42 $589.40 02 Bidder $11.55 $50550 03 Bidder. $18.90 $1,323.00 04 Bidder $11.10 ' $777.40 OS Bidder $35.00 $2,450.00 06 Bidder $6.00 $420.00 0781dder $21.83 $1,528.10 088idder $5.00 $350.00 SP 1003.4.1.8.1 Fiber Wattles 690 LF 0181dder $1.63 $1,124.70 OZ Bidder $2.04 $1,407.60 03 Bidder; : $2.10 T $1,449.04 '. 04 Bidder $1.65 __ $1,138.50 OS Bidder $2.00 _ _ $1,380.00 _ 06 Bidder' $2.00 $1,380.00 07 Bidder $1.77 $1,221.30 08 Bidder. $2.20 $1518 QO SP 1004.4.1.F.1 Temporary Coffer Dam 6 F~4 01 Bidder $418.20 $2,509.20 02 Bidder $2,666.00 $15,996 fl0 03 Bidder; $350.00 $2;100.Ofl 04 Bidder $2,666.00 $15,996.00 OS Bidder $7,500.00 ~ .$45,000 ~ ' 06 Bidder; $340.00 ~ ~ $2,040.00 07 Bidder $3,311.06 $19,866.36 OS Bidder $380.00 $2 280 00 4/27/2009 Page 11 SP 1006.4.1.C.1 Inlet Protection ~ 11 ~ F~4 01 Bidder $45.90 $504.90 02 Bidder $78.75 $866.25 ' 03 Bidder: $82.00 $902.00 04 Bidder $139.50 ' $1,534.50 OS Bidder $100.00 $1,100.00 06 Bidder: $95.00 $1,045.00 07 Bidder $63.58 $699.38 08 Bidder $85.00 $935.00 SP 11220 Remove & Salvage Traffic Sign 13 EA 01 Bidder $21.11 $274.43 02 Bidder $26.25 $34125 __ . 03 Bidder. $26.25 __. $341.25 04 Bidder $25.00 $325.00 OS Bidder $27.00 $351.00 < 06 Bidder $25.50 $33150 07 Bidder $26.49 $344.37 OS Bidder __ _ $28.25 $367.25 _ _._ SP 11222 Remove/Reset Traffic Sign 7 EA 01 Bidder $30.60 ' $214.20 02 Bidder $26.25 $183.75 03 Bidder $26.25 $183.75 04 Bidder $25.00 $175.00 OS Bidder $30.00 $210.00 . 06 Bidder; $25.50 $17850 07 Bidder $26.49 ' $185.43 .08 Bidder $28.25 $197.75 SP 20003 Construct Temporary Fence 88 LF 01 Bidder $2.45 ' $215.60 02 Bidder $5.25 $462.00 03 Bidder $3.15 $277,20 04 Bidder $1.50 ' $132.00 OS Bidder $5.00 $440.00 ` 06 Bidder; $3.00 $26400 07 Bidder $5.30 ' $466.40 08 Bidder $5.75 $506.00 SP 20009 Remove and Reset Fence 770 LF 01 Bidder $7.45 ' $5,736.50 02 Bidder $7.88 $6,067.60 , 03 Bidder $3.80 $2,926.00 04 Bidder $7.50 $5,775.00 OS Bidder $7.50 $5,775.00 , 06 Bidder, $7.00 $5,390.00 07 Bidder $7.95 $6,121.50 08 Bidder $8.50 $6,SA5.00 SP 20030 Remove 8< Salvage Guardrail 650 LF 01 Bidder $5.61 ' $3,646.50 02 Bidder $5.77 $3,75050 03 Bidder; $5.75 $3,737.50 04 Bidder $5.50 $3,575.00 OS Bidder $5.00 $3,250.00 06 Bidder; $4.00 $2;600.00 07 Bidder $5.83 ' $3,789.50 08 Bidder $6.25 $4,062.50 SP 20102 Guardrail -metal 1260 LF 01 Bidder $20.76 $26,157.60 02 Bidder $20.74 $26,132.40 ~ 03 Bidder $20.75 $26;145.00 048idder $19.80 $24,948.00 OS Bidder $21.00 $26,460.00 : 0681dder; $20.00 $25,200.00 ', 0781dder S20.93 $26,371.80 088idder $22.25 $28;035.00 SP 25030 Demolish & Remove F~cisting Bui lding 1 LS 0181dder $3,162.00: $3,162.00 02 Bidder $3,150.00 $3,150.00 03 Bidder $3,150.00 $3,150.00 04 Bidder $3,200.00 $3,200.00 OS Bidder $2,000.00 $2,000.00 06 Bidder; $3,060.00 $3,060.00 07 Bidder $12,436.58 $12,436.58 08 Bidder $6,740.00 $6,740.00 ; SP 25063 Property Owner Meetings 2 F~ 0181dder $510.00 ' $1,020.00 02 Bidder $1.00 $2.00 _._ ! 03Bldder $200.00 $400.00 04 Bidder $500.00 $1,000.00 OS Bidder $500.00 $1,000.00 ; 06 Bidder. _ .. . $150.00 $300.00 0781dder $1,589.51 ' $3,179.02 088idder $300.00 $600. SP 25075 Realign Five Mile Creek 860 LF 01 Bidder $35.70 ~ $30,702.00 02 e/dder $30.00 $25,800.00 03 Bidder; $40.00 $34,400.00 04 Bidder $23.00 --- $19,780.00 a OS Bidder $87.00 $74,820.00 06 Bidder; $50.00 $43,000.00 07 Bidder $28.97 $24,934.20 08 Bidder $87.00 $74,820.00 SP 25080 Remove/Reset Mailbox 5 F~ 01 Bidder $127.50. $637.50 02 Bidder $105.00 $525.OU € 03 Bidder: $105.00 $525.00 04 Bidder $100.00 $500.00 OS Bidder $125.00 $625.W 06 Bidder; $100.00 $5Q0.00 0781dder $105.97 ' $529.85 08B/dder $110.00 $SSO.OD SP 29053 Dirt Berm - 2' wide x 1' tall 825 LF 01 Bidder $1.53 $1,262.25 02 Bidder $1.00 $825.W , 03 Bidder, $0.00 $0.00 04 Bidder $1.25. $1,033.25 ` OS Bidder $1.00 $825.OD 06 Bidder; $1.80 $1,485.00 '. 07 Bidder $6.73 ' $5,552.25. 08 Bidder $0.65 $536.25 . SP 29065 Sod Repair 85 SY 0181dder $15.30 ' $1,300.50 02 Bidder $15.75 $1,338.75 s 03 Bidder; $10.50 $892.50 04 Bidder $15.00 $1,275.00 OS Bidder $16.00 $1,360.00 :06 Bidder; $9.00 $765.00 07 Bidder $15.90 $1,351.50 , 08 Bidder $9.50 _.._ $80750 SP 29090 Trim Tree, 8' Above Sidewalk 2 F~ 01 Bidder $153.00 $306.00 02 Bidder $36.75 $73.50 03 Bidder: $37.00 $74.00 04 Bidder $35.00 $70.00 OS Bidder $450.00 $900.00 06 Bidder; $36.00 $72.00 0781dder $211.94 $423.88 ___ OBBldder $56.00 $11200 4/27/2009 Page 12 SP 29093 Remove Tree 6-inches/+ ~ 35 ~ EA 018idder $173.40 ' $6,069.00 02 Bidder $178.50 $6,247.50 03 8ldder $180.00 $6,300.00. 048idder $170.00 ' $5,950.00 OS Bidder $195.00 $6,825.00 ` 0681dder $175.00 $6,125.00 0781dder $52.98 ' $1,854.30 088idder $41.00 $1,435.00 SP 29100 Repair Sprinkler System 220 LF 01 Bidder $7.40 __. $1,628.00 02 Bidder $6.30 _ $1,386.00 :03 Bidder $6.30 _ $1,386.00 04 Bidder $6.00 ~ $1,320.00 OS 8ldder $6.50 $1,430.00 06 Bidder; $3.10 $682.00 __ - 07 Bidder $6.36 $1,399.20 OS Bidder $13.50 $2,970.00 SP 70016 Diffuser Boulders - 2' 50 EA 01 Bidder $61.20 $3,060.00 02 Bidder $61.95 $3,097.50 :03 Bidder: $20.Q0 $1,000.00 04 Bidder $59.60 $2,980.00 05 Bidder $2.00 $100.00 06 Bidder` $110.00 $5,500.00 07 Bidder $54.69 $2,734.50 08 Bidder $56.00 $?,800.00 SP 70022 Remove Existing Bridge Structure 1 LS 0181dder $4,284.00 ' $4,284c00 02 Bidder $4,200.00 $4,200.00 03 Bidder; $4,700.00 $4,700.00 '. 04 Bidder $4,500.00 $4,500.00 05 Bidder $5,000.00 $5,000.00 06 Bidder $4,590.00 $4590.00 - ___ 07 Bidder $13,428.09 $13,428.09 08 Bidder $5,080.00 $5,080.00 _ SP20105A Guardrail Terminal Type 7 1 EA $1,422.00 $1,422.00 01 Bidder $999.60 $999.60 02 Bidder $992.25 $992.25 03 Bidder $1,000.00 $1,000.00 04 Bidder $945.00 $945.00 OS Bidder $1,100.00 $1,100.00 06 Bidder; $965.00 $965.00 07B/dder $1,001.39 ' $1,001.39 08Bldder $1,070.00 $1,070.00 SP20105B Guardrail Terminal Type 8 1 EA $1,845.00 $1,845.00 01 Bidder $1,632.00 $1,632.00 02 Bidder $1,575.00 $1,575.Q0 03 Bidder; $1,500.00 $1,500.00 04 Bidder $1,500.00 $1,500.00 OS Bidder. $1,600.00 $1,600.00 06 Bidder; $1,530.00 $1,530.00 ', 07 Bidder $1,589.51 $1,589.51 08 Bidder $1,690.00 $1,690.00 Estimate $475,39.90 01 Bidder $2,082,763.32 ' 02 Bidder $1,971,926.50 03 Bidder __ $1,992,827.83 04 Bidder $2,118,228.47 ~ 05 Bidder $2,249,098.85 ' O6 Bidder, $2,406,569.00 07 Bidder $2,312,092.92 08 Bidder ~ $2,g32,720A5 __ Schedule 2a -Ustick Rd and Lind®r Rd -City of M®ridian Improvements (Alternate No.1) IN202-07 305048 Ustick Rd and Lender Rd Estimate SP M311 Lower Existing Water Main (12") I 1 40 I LF Ol Bidder 574.70 ' $10,458.00 02 Bidder $32.55 $4,557,00 03 Bidder: $71.40 $9,996.00 04 Bidder $31.30 $4,382.00 OS Bidder $61.50 $8,610.00 06 Bidder $58.50 $8,190.00 07 Bidder $112.21 ' $15,709.40 OB 8ldder $64.00 $8,960.00 ---- SP M314 Encase 12" Pipe at Crossmg __.... I ....140 ._L_LF I _ . _ . _.. _ ........ _ _ _...._.I 01 Bidder $155.25 ' $21,735.00 0181dder $81.90 $11,466.00 03 Bidder $126.00 . $37,640.00 04 Bidder $78.80 $11,032.00 OS Bidder $140.00 $19,600.00 ; 06 Bidder $88.50 $12,390.00 ', 0781dder $110.33 $15,446.20 08 Bidder $120.00 $16,800.00 SP M320 Adjust Existing Water Valve Box 9 EA 018idder $155.00 $1,395.00 02 Bidder $250.00 $2,250.00 03 Bidder $131.25 $1,181.25 ', 04 Bidder $150.00 $1,350.00 OS Bidder $180.00 $1,620.00 - 06 Bidder: $190.00 $1,710.00 07 Bidder $508.30 $4,574:70 .08 Bidder $200.00 ..$1,800.00.. SP M420 Remove & Replace 4" Sewer Service 80 LF 01 Bidder $28.55 $2,284.00 OZ Bidder $30.45 $2,436.00 :03 Bidder; $18.90 $1,512.00 04 Bidder $29.30 $2,344.00 OS Bidder $23.00 $1,840.00 06 Bidder; $9.50 $760. 07 Bidder $42.33 ': $3,386.40 08 Bidder $45.50 $3,640.00 SP M421 Install Sanitary Sewer Stub (8'~ 2 EA 01 Bidder $6,450.00 $12;900.00 02 Bidder $4,095.00 $8,190.00 03 Bidder; $1,260.00 $2,520.00'' 04 Bidder $3,940.00 I $7,880.00 OS Bidder $3,370.00 $6,740.00 06 Bidder; $3,160.00 $6,320.00 07 Bidder $6,340.52 ', $12,681.04 08 Bidder $3,920.00 $7,840.00 SP M422 Install Water Stub with Hot Tap (8`~ 2 EA 01 Bidder $5,850.00 ' $11,700.00 02 8ldder $3,360.00 $6,720.00 03 8ldder; $7,234.50 $14,469.00 04 Bidder $3,233.00 $6,466.00 OS Bidder $5,600.00 $11,200.(10 06 Bidder $4,280.00 $8;560.00 ', 07 Bidder $5,709.99 ! $11,419.98 08 Bidder $5,860.00 $11,720.00 ISP M423 Provide Adequate Water Line Cover I 260 I LF 01 Bidder $63.00 $16,380.00 02 8ldder $30.45 $7,917.00 03 Bidder; $58.80 $15;288.00 04 Bidder $29.30 $7,618.00 OS 8ldder $25.00 $6,500.00 __. 06 Bidder; $45.50 $11,830.00 0781dder $107.03 $27,827.80 OBBidder $43.00 $11,180.00 4/27/2009 Page 13 ISP M425 Sewer Line Removal & Abandonment (S") I 60 I LF 01 Bidder $14.00 ' $840.00 02 Bidder $15.75 $945.00 03 Bidder' $21.00 $1,260.00 04 Bidder $15.20 $912.00 OS Bidder $25.00 $1,500.00 06 Bidder; $7.50 $450.00 07 Bidder $14.63. $877.80 08 Bidder $24.00 $1,440.00 SP M426 Install Water Stub with Tee (12'~ 1 EA 0181dder $9 250.00 _ .. $9250.00 ~_ 02 BJdder $6,290.00 $6,290.00. 03 Bidder $8,647.80 $8,647.80 04 Bidder $6,051.00 $6,051.00 OS Bidder _ $9,300.00 $9,3Q0.00 06 Bidder $7,530.00 _. $7,530,00 07 Bidder $12,740.73 $12,740.73 08 Bidder' $10,150.00 $10,150.00 SP M427 Install Fire Hydrant (6'~ 1 EA 01 Bidder $3,350.00 $3,350:00 02 Bidder $3,507.00 $3,507.00 03 Bidder $4,095.00 $4,095.00 04 Bidder $3,524.00 $3 524.00 OS Bidder $3,200.00 $3,200.00 06 Bidder; $3,420.00 $3,420.00 07 Bidder $4,012.54 ' $4,012.54 08 BJdder $3,480.00 $3,480.00 SP M428 Install Fire Hydrant with Reducer (6'~ 1 EA 01 Bidder $2,730.00 $2,730.00 02 Bidder $3,045.00 $3,045.00 03 Bidder; $4,095.00 $4,095.00 04 Bidder $3,080.00 $3,080.00 05 Bidder $2,500.00 $2,500.00 06 Bidder: $3,330.00 $3,330.00 07 Bidder $3,053.58 $3,053.58 OB Bidder $2,600.Q0 $2,600.Q0 SP M429 Install Gate Valve (12'~ 2 F~ 01 Bidder $2100 00 $4 200 00 02 Bidder $1995 00 $3,990.00 03 Bidder $2,205.00 $4,410.00 04 Bidder. $2,069.00 $4,138.00 OS Bidder _ $1,800.00 $3,600.00 06 BJdder; $2,050.00 $4,100.00 0781dder $4,402.93 ' $8,805.86 08Bldder $1,720.00 $3,440.00 SP M430 Install 1' Metering Station 1 EA 01 Bidder $1,730.00 ' $1,730.00 02 Bidder $1,260.00 $1,260.00 03 Bidder; $2,058.Q0 $2,058,00 04 Bidder $1,212.00 ' $1,212.00 05 Bidder $1,500.00 $1,500.00 06 Bidder $1,122.00 $1,122.00 078/dder $3,014.17 $3,014.17 OS BJdder $1,140.00 $1,140.00 Estimate 01 Bidder $88,952.00 ' 02 Bidder, ~ $62,ST3.00 ~ 03 Bidder. - - ~ $8 7,172.05 04Bidder $58,989.00 05 Bidden - - ..___-- - $77,790.OD 06 Bidder'. ____ ____ -_.____; _ _ --- $68,712.00 078idder $123,550.20 j 08 Bidder, $8x,190.00 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No . 2) INZ02-07 305048 Ustick Rd and Linder Rd Estimate ISP M311 Lower F~cisting Water Main (12") I 140 LF 01 Bidder $76.20 $10,668.00 02 Bidder $32.55 $4,557.00 t 03 Bidder' $71.40 $9;996,00 04 Bidder $31.30 $4,382.00 OS Bidder. $61.50 $8,610.00 `: 06 Bidder $58.50 $8,190.00 ', 07 Bidder $112.21 $15,709.40 08 Bidder $64.00 $8,960.00 ISP M314 Encase 12 Pipe at Crossing ~ 140 I LF ~ ~ 01 Bidder $158.36 ' _.. $22,170.40 02 Bidder $81.90 _ $11,466.00 . . 03 Bidder _._... $126.00 .. _ .... _ _ ._ ......_ $17,640.00 04 Bidder $78.80 $11,032.00 OS Bidder $140.00 $19,600.00 06 Bidder $88.50 $12,390.00 07B/dder $110.33 $3.5,446.20 OS Bidder $120.00 $16,800.00 SP M320 AdJust E~asting Water Valve Box 9 F~ 01 Bidder $158.10 $1,422.90 02 e/dder $250.00 $2 250 00 03 Bidder; $131.25 $1,181.25 ', 04 Bidder $150.Q0 ' $1,350.00 OS Bidder $180.00 $1,620 QO 06 Bidder; $190.00 $1,710.00 0781dder $508.30 $4,574.70 08 Bidder $200.00 $1,800.00 SP M420 Remove & Replace 4" Sewer Service 80 LF 0181dder $29.12 ' $2,329.60 02 Bidder $30.45 $2,436.00: 03 Bidder' $18.90 $1,512.00 04 Bidder $29.30 ' $2,344.00 OS Bidder $23.00 $1,840.00 06 Bidder $9.50 $760.00 07 Bidder $42.33 $3,386.40 OS Bidder $45.50 $3,640.00 SP M421 Install Sanitary Sewer Stub (8'~ 2 EA OI Bidder $6,579.00 $13,158.00 02 Bidder $4,095.00 $8,190.00 03 Bidder: $1,260.00 $2,520.00 04 Bidder $3,940.00 $7,880.00 OS Bidder $3,370.00 $6 740.Ofl 06 Bidder $3,160.00 $6,320.00 07 Bidder $6,340.52 $12,681.04 OS Bidder $3,920.00 $7 840.00. SP M422 Install Water Stub with Hot Tap (8'~ 2 EA 01 Bidder $5,967.00 $11,934.00 02 Bidder $3,360.00 $6,720.00 03 Bidder; $7,234.50 $14,469.00 04 Bidder $3,233.00 $6,466.00 OS Bidder $5,600.00 $11 200 ~ 06 BJdder; $4,280.00 $8,560.00 07 Bidder $5,709.99 ', $11,419.98 08 Bidder $5,860.00 $11,720.00 SP M423 Provide Adequate Water Line Cover I 260 I LF 01 Bidder $64.26 ' $16,707.60 02 Bidder $30.45 $7,91200 03 Bidder: $58.80 $15,288.00 04 Bidder $29.30 $7,618.00 OS Bidder $25.00 $6,500 00 06 Bidder: $45.50 $11,830.00 0781dder $107.03 $27 827.80 OB Bidder $43.00 $11180 00 4/27/2009 Page 14 ASP M425 Sewer Line Removal & Abandonment (8'~ ~ 60 ~ LF 01 Bidder $14.28 ' $856:80 02 Bidder $15.75 $945.00 03 Bidder: $21.00 $1,260.00 04 Bidder $15.20 $912.00 OS Bidder $25.00 $1,500.00 06 Bidder' $7.50 $450.00 078idder $14.63 $877.80 OS Bidder $24.00 $1,440.00 SP M426 Install Water Stub with Tee (12'~ 1 EA _ . 01 Bidder _... $9,435.00 $9,435.00 01 Bidder $6,290.00 $6,290.00 03 Bidder _... $8,647.80 $8,647.80 04 Bidder $6,051.00 $6,051.00 OS Bidder $9,300.00 $9,300.00 06 Bidder. $7,530.00 $7,530.00 __ _ 0781dder _ $12,740.73 ' _ $12,740.73 _ OS Bidder __ $10,150.00 $10,150.00 SP M427 Install Fire Hydrant (6'~ 1 F~4 01 Bidder $3,417.00 ' $3,417.00 01 Bidder $3,507.00 $3,507.00 03 e/dder $4,095.00 $4,095.00 04 Bidder $3,524.00 ' $3,524.00 OS Bidder $3,200.00 $3,200.00 06 Bidder; $3,420.00 $3,420.00 07 Bidder $4,012.54 $4,012.54 OS Bidder $3,480.00. $3,480.00 SP M428 Install Fire Hydrant with Reducer (6'~ 1 EA 01 BJdder $2,784.60 $2,784.60 01 Bidder $3,045.00 $3,045.00 03 Bidder' $4,095.00 $4,095..00 04 Bidder $3,080.00 $3,080.00 05 Bidder $2,500.00 $2,500.00 06 Bidder' $3,330.00 $3,330.00 07 Bidder $3,053.58 $3,053.58 OS Bidder $2,600.00 $2,600.00 SP M429 Install Gate Valve (12'~ 2 EA 01 Bidder $2,142.00 $4,284.00 01 Bidder $1,995.00 $3,990.00. 03 Bidder. $2,205.00 $4,410.00 04 Bidder $2,069.00 $4,138.00 05 Bidder $1,800.00 $3,600.00 06 Bidder $2,050.00 $4,100.00 07 Bidder $4,402.93 $8,805.86 OS Bidder $1,720.00 $3,440.00 SP M430 Install 1' Metering Station 1 EA 01 Bidder $1,764.60 $1,764.60 01 Bidder $1,260.00 $3,260.00 03 Bidder: $2,058.00 $2,058.00 04 Bidder $1,212.00 $1,212.00 OS Bidder $1,500.00 $1,500.00 06 Bidder: $1,122.00 $1,122.00 07 Bidder $3,014.17 $3,014.17 OS Bidder $1,140.00 $1,140.00 ~__~.. ; _ Estimate 01 Bidder $100,932.50 ~ 02 Bidder $62,573.00 03 Bidder $87,172.05 04 Bidder $59,989.00 ; 05 Bidder ~ $77,710.00 ~ 06 Bidder $68,712.00 07 Bidder $123,550.20 08 Bidder _.. _ $84,190.00 _ _: 4/27/2009 Page 15 Es#imate $3,879,309.72 Bidders 018idder Lune Construction ~ 02 Bidder Nampa Paving 03 Bidder Central Paving _.. __ _g_ ............... _ _....__...__ 04 Bidder Idaho Sand 8< Gravel 05 Bidder Kin Excavation O6 Bidder WF Construction 07 Bidder McAlvain Construction 08 Bidder Knife River Contract Totals 01 Bidder Schedule 1a Ustick Rd and Linder Rd Intersection (Alternate No. 1) $2,041 859.05 Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $98,952.00 $2,14Q,811.05 02 Bidder Schedule 1a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $1,971,926.50 Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $62,573.00 03 Bidder ----- Schedule 1a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $1,992,827.83 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $87,172.05 04 Bidder ~edule 1a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $2,118,228.47 _...-- - . Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $59,989.00 05 Bidder Schedule 1 a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $2,249,098.65 Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $77,710.00 06 Bidder __ 'Schedule 1a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $2,298,569.00 - _ ..... Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $69,712.00 07 Bidder __ _ _ __ (Schedule 1a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $2 267 092 92 II -- - - - --- _- ------ ---- ------- .. _ ..... .. ............_.... Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $123,550.20 $2A34,498.50 $2,079,988.88_' $2,178,217.47 __ $2,326,808.65 s _; $2,$68,281.00 $2,390,643.12 08 Bidder Schedule 1a -Ustick Rd and Linder Rd Intersection (Alternate No. 1) $2,862,720.45 - --- -- Schedule 2a -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 1) $84,190.00 $2,846,010.45 01 Bidder ___ Schedule 1 b -Ustick Rd and Linder Rd Intersection (Alternate No 2) $2,082,763.32 Schedule 2b -Ustick Rd and Linder Rd City of Meridian Improvements (Alternate No. 2) $100,932.50 $2,183,685.82 02 Bidder Schedule 1b -Ustick Rd and Linder Rd Intersection (Alternate No. 2) $1,971,926.50 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 2) $62,573.00 03 Bidder ____ _ _ __ Schedule 1b -Ustick Rd and Linder Rd Intersection (Alternate No. 2) $1,992,827.83 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Alternate No. 2) $87,172.05 $2,034,488.60 4/27/2009 Page 16 $2,079,999.88 04 Bidder Schedule 1 b Ustick Rd and Linder Rd Intersection (Altemate No. 2) $2,118 228.47 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Altemate No. 2) $59,989.00 _..._ $2i 78,217.47. 05 Bidder Schedule 1b -Ustick Rd and Linder Rd Intersection (Alternate No. 2) $2,249,098.65 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Altemate No. 2) _.._....._ - $77,710.00 $2,326,808:.65 >' 06 Bidder Schedule 1 b -Ustick Rd and Linder Rd Intersection (Alternate No. 2) __._ $2,406,569.00 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Altemate No. 2) __ _ $69,712.00 _ _ $2,476,281.00 07 Bidder Schedule 1 b -Ustick Rd and Linder Rd Intersection (Altemate No. 2) $2,312,092.92 Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Altemate No. 2) $123,550.20 $2,435,643.12 _ 08 Bidder Schedule 1 b -Ustick Rd and Linder Rd Intersection (Altemate No. 2) - - $2,932,720.45 - ___ _ Schedule 2b -Ustick Rd and Linder Rd -City of Meridian Improvements (Altemate No. 2) $84,190.00 $3,01.6,910.45 4/27/2009 Page 17