Loading...
HomeMy WebLinkAboutChange Orders No. 3, 5 & 7 with Ada County Highway District ACHD for Meridian Split Corridor Phase OneChange Order Request #5 -REVISED 444 W. Karcher Rd. Nampa, ID 83687 -~ Phone (208) 466-4051 IDPW 12270-AAA-1-2 ~ Fax (208 466-4 071 PROPOSAL SIJBA~TfFD T0: PHONE r 1 o>i 1 DATE Ate, 387-6283 Mazch 16, 2009 JOB NAME 3775 Adams Street Meridian S lit Corridor -Phase One CITY STATE AND ZIP CODE JOB LOCATION Garden Ci , ID 83714 Meridian & Main ~~CT DATE OF PUNS EtvIAII, JOB PHONE Nt1A~ER 'bledso hd.ada.id.us The following proposal represents aIl additional cons that will be incurred by Nampa Paving & Asphalt Co. as a result of the City of Meridian's REVISED request for quotation given to Superior Construction. ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST 0404.4.1A1 Water Service Connection -1° 1 ea $ 850.00 •$ g5p,~ SP-10 Hot Tap Water Main 1 ea $ 1,500.00 $ 1,500.00 0402.4.1.A.1 6° MJxFL Gate Valve 1 ~ $ y~_~ $ ~.~ 0403.4.1.A.1 Meridian Fre Hydrant 1 ea $ 4,000.00 $ 4,000.00 0501.4.1 A 1 Sewer Pipe - 4" SDR35 30 ff $ ~.~ $ ~.~ 0504.4.1.D.1 8"x4° Sewer Service 1 ~ $ 700 00 $ ~~ ~ Subtotal $ 8,000.00 General Contractor markup on first $1000 1 LS $ 100.00 $ 100.00 General Contractor markup on $1001 - $9,000 5 % $ 400.00 $ 400.00 TOTAL of REVISED COR #5 $ 9,500.00 lie advised: This proposal does not include any allowances for surface repair. At this time, Nampa Paving has not received any drawings to indicate the extent of repairs required. Payment to be made as follows: 1 ~'/o upon completion and/or by montiily payment requests. Progress estimates submitted by the 2 of each month are due by the 10ffi of the following month. All unpaid balances ma aoorue interest at highest legal rate Tins proposal does not guarantee work can be completed as sohedoled. Acceptance of Proposal: Authorized The above ces, pri specifications and conditions are satisfactory and are $Ignatilre: hr.ro1.., °....o..toi DA.....-..s ...:tt t.e ~...f,. ..t__~ _t _"' gYe wt Lotr~d g e w La".acc an atuwutaa FiWVC. Accepted by: Brent Lotridge, Estimator ~~: Change Order Request #3 -Exhibit A 444 W. Karcher Rd. Nampa, ID 83687 ~~~ A,~nl~s(~ ~~ Phone (208) 466-4051 IDPW 12270-AAA-1-2 '~"~ Fax (208) 466-4071 ~,~,~.ro: - - PHONE Y e 1 of 1 ~.~ Asr~r 387-6283 Feb 10, 2009 JOB NAME 3775 Adams Street Meridian S lit Corridor -Phase One CITY STATE AND ZR~ CODE JOB LOCATJON Garden Ci , ID 83714 ~ Meridian & Main ~~~ DATE OF PLANS ]s'MAIL JOB PHONE NUMBER 'bledso chd.ada.id.us The following proposal represents all additional costs that have been incurred by Nampa Paving & Asphalt Co. as a result of the new sewer manhole proposed by Superior Constriction to be set in the intersection of Franklin & Main. This manhole reduces the storm drain conflict as described in the attached letter from Superior. ITEM DESCRIPTION ~ QTY UNIT UNIT COST TOTAL COST 502.4.1.A.1 Set new manhole at Franklin 8~ Main 1 EA 1,825.00 $ 1,825.00 TOTAL OF CHANGE ORDER REQUEST #3 ~ 1,826.00 Payment to be mach as follows: ice'/o npon completion and/or by manthlY PaY~t ~N~s• Progress estimates submi[ud by the of each month are due by the lt>ei of the following month. All unpaid balances may accrue interest at highest legal rate prc~ sal does not guarantee work can be ooa~leted as scheduled. Aoceptaace of Proposal: The above prices, speoi5oetioas and conditions are satisfactory aid are Si~aatuze: eds... ._~ „__-~. F>re~,t t_.otr~ ge .w. ra u~m ww w mane as ouLlln~ 800Ve. Aceepteaby: Brent Lotridge, Estimator Date: Meridian Split Corridor Change Order Request Nampa Paving 444 W. Karcher Rd. Nampa, Idaho 83687 Date: 2/10/09 Superior Construction is requesting a change order for installing a new sewer manhole at the intersection of Franklin Rd. & Main St. East of the existing manhole instead of connect<ng to the existing manhole. The reasons are as follows: 1) The existing storm drain pipe shown on both the sewer 8< street plans indicate the pipe ends in the middle of the intersection. Further investigation by ACRD {Dave Longnecker) have revealed that the pipe connects to a drain farther North. The storm drain pipe is RCP and will be exposed approximately ZOIf across the new sewer main thus making the situation extremely dangerous considering the elevations between the two pipes. ACRD has expressed that cutting out the storm drain pipe to lay thru is not in the best interest of anyone. 2) The time restrictions in this busy intersection as well as the opportunities for accessing it are quite limited. A new manhole would be faster 8 eliminate the possibilities of future problems with the storm drain caused by the construction of the new sewer. In conclusion, a new manhole would be the safest, most timely manner ~ cost effective for ACRD in the future. Superior Construction PO Box 455 Meridian, Idaho 83680 Jerry Lee Office: 884-4011 Fax: 884-5060 Cell: 871-7691 Email: jerryt~superiorconstruction.cc CHANGE ORDER REQUES?' PROJECT Meridian Split Comdor -Phase One CONTRACTOR: Nampa Paving & Asphalt Co. 444 W. Karcher Rd. Nampa, ID 83687 208.466.4051 P 208.466.4071 F COR NUMBER: THREE DATE: February 10, 2009 THE PROPOSED CONTRACT CHANGES ARE AS FOLLOWS: As defined in attached Eahiubit A The original Contract Sum was $ 3,174,624.03 The net change by previously authorized Change Orders $ 3 673.92 The Contract Sum prior to this Change Order was $ 3,178,297.95 The Contract Sum would be increased by this Change Order in the amount of $ 1,875.00 The new Contract Sum including this Change Order will be $ 3,180,172.95 The Contract Time will be increased by 0 Daps The date of Substantial Completion as of the date of this Change Grder is 27 Jul-09 Nampa Paving Representative (Signature) Its Page 1 of 1 Date Change Order Request #7 444 W. Karcher Rd. Nampa, ID 83687 ~~ Phone (208) 466-4051 IDPW 12270-AAA-1-2 Fax (208) 466-4071 PxoPOSAI, svBHnTrED To: PHONE Y e 1 of 1 A DATE 387-6283 Jos NAtvg Mazch 18, 2009 3775 Adams Street Meridian S lit Corridor -Phase One C1TY STATE AND ZIP CODE JOB LOCATION Gazden Ci ID 83714 , ` Meridian & Main ' ~~'eT DATE OF PLANS II~IAIL JOB PHONE N[JMBER 'bledsoe hd.ada.id.us The following proposal represents aIl additional costs that will be incurred by Nampa Paving & Asphalt Co. as a result of the City of Meridian's request for an additional sewer service at Meridian Road, near Redlin photography. ITEM DESCRIPTION QTY UNIT UNIT COST TOTAL COST 0501.4.1.A.1 Sewer Pipe - 4' SDR35 30 LF $ 30,00 $ gpp,~ Connection 1 EA $ 390.00 $ 390.E Subta~l $ 1,29p.~ C~neral Contractor markup on first $1000 1 LS $ 100.00 $ 100.00 C~neral Contractor markup ~ $1001- $1290 5 % $ 14.50 $ 14.50 TOTAL of COR #7 $ 1,404.50 I Paymeat to be made as follows: 100•~o upon completion and/or by monthly payment requests. Progress estimates sabmitted by the 25 of each month are due by the 10~ of the following month. All unpaid balaaces may accrue interest at highest legal rate Tins proposal does not guarantee work cxin be completed as soheduted. Acceptance of Proposal: Authorized 'rt,a st,,,,.~ .-.e..:c~ _. _ Si ___ _,..._,...,,,.o, i.........,a...n.a ,,,,,, aruuwuvns are sansmorory ana are hereb a ted. Pa will be made as outlined above, P~~'e VL't ~.-t7'~{~1.~ g ~ AeoePted by: Brent Lotridge, Estimator Date: