HomeMy WebLinkAboutChange Order No. 1 with JC Constructors for North Black Cat Lift StationCITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: ~ Project Number: 0632a Date: 4/7/2009 Effective Date: CONTRACTOR: JC Constructors PROJECT: North Black Cat Lift Station The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Desclption: 1) Work Change Directives 2) 3) 4} 5) Reason for Change Order: Additional work required. Attachments: Work Change Directives 1, 3, 4, 5, 6, 7, 8, 10, 11, 13, 14 and 15. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $2,745,000.00 Original Contract Completion Date: Original Contract Com etion Days: Net changes form previous C.O.'s.: Net Days d~ange form previous C.O: s: No. 0 to 0 No. Q to 0 $0.00 Contract Price Prior to this C.O.: Contract Completion Date before this C.O.: $2,745,000.00 Net Increase {decrease} of this C.O.: Net Days Increase (decrease) of tit6~ C.O.: $78,847.89 Conirad Price with alt Approved C.O :s: Contract Completion Date with an Approved C.O.'s: $2,823,847.89 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED (CONTRACTOR) Date: a 9 n 9 hats: ~{ ,~~ o APPROVED: (CITY PURCOSING A ) s ~' COUNCIL APPROVAL , B . Keitir Watts °~ ``c~,,,,„~,,,nr,~, Date: ~ Date: ~`~ ~y ~q ~'' . ~ ~ APPROVE ATTEST: ~~ ~° Z By: Mayor Tammy eerd By: City Cleric, Jay Halm ao B~jAL Date: ~,. ~~ 0 /~ Date: y~ a~ ~ Q 1 : ~ .. •,~~~~ ~"vlvT`~ ~~P ~`~``~ WORK CHANGE DIRECTIVE No. 001 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: September 19, 2007 EFFECTIVE DATE: September 19, 2007 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Add a 12" Gate Valve to the 2"Blow off assembly on the north end of the 12" waterline in Black Cat Road Purpose of Work Change Directive: To keep the water service active at the lift station when a waterline is built to the north. If a claim is made that the above change(s) have affected Contract Price or .Contract Times any claim for a Change order based thereon will involve one or more of the fallowing methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ^ Unit Prices ^ Contractor's records x Lump Sum ® Engineer's records ^ -Other ^ Other Estimated increase (decrease) in Contrac# Price: Lump sum price quotation to be suvplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: Phil Kric um, P.E. By: .. ( uthorized Signature) AUTHORIZED by OWNER: Clint Dolsby, P.E. By: (Authorize Signature) F:IPROJECTMANAGERS\PHK\10-OS-026-MERmiAN NORTH BLACK CATICONSTU.IFT STATION\CONS'11C0&WCD\WCD O1.DOC L Change Proposal # Cr ® "~ ISAL DATE 13-Nov-O7 ®ESCIZIPT'l®N ®F CHANGE Add 12°' gate valve to the 12" waterline for isolation during future construction work ;osT suAAAAARY w FOR CttANGE wORic DIRECTLY PERFORtiSED BY THE UNDERSIGNED CONTRACTOR . D'arsct labor wt labor fringes (Attach supporting detail estimates with man-hours and rates) . Insurance and Labor Taxes . Materials and Equipment. Detailed quantities attached. . Ovefiead & Fee ~ f 5°/® Time Extension Requested 0 working daV JC Cor~tructors' cost .For work to ~ performed by subcontractors, per proposals and detailed breakdowns y. SUBCONTRACTOR NAME CATEGORY OF WORK H2 E~eCavatlon Plp@ TOTAL SUBCONTRACTOR AMOUNT (INGLUDING SUB. OHS~Py: $ 2, 000.00 3 CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUNT ~ b PERCENT: $ 1 ~' ®~ coNrrzACroRS BoNO r;osT ~ s.orenooo $ 31.50 C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (AB+B,~ $ 2,131.50 JC CONSTRUCTORS, INC. CONTRACTOR NAME Jim Cox PRIfdTED NAME ON PROPOSAL SrGNATURE /DATE Page 1, JCC WORK CHANGE DIRECTIVE No. 003 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: January 2$, 2008 EFFECTIVE DATE: January 28, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation far the following change(s): Per the Answer to RFI 03, use stainless steel for the duct work to the Gas Scrubber where it will be exposed to sunlight. Purpose of Work Change Directive: If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect ofthe change(s). Method of determining change in Contract Price: ^ Unit Prices x Lump Sum ^ Other Method of determining change in Contract Times: ^ Contractor's records ^ Engineer's records ^ Other Estimated increase (decrease) in Contract Price: Lump sum pace quotation to be supplied from JCC If the change involves an increase, the estimated amount is not to be exceeded without further authorizatian. RECOMMEND by ENGINEER: Phil Kric aum, P.E. Ey: (A honzed ignature) Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: (Authorized Signature) F:iPROJECfMANAGERSiPHK110-05-026MERII?IAN NORTH BiACiC CATICONST~itF1' STATION~CONSTICO&WCDtWCD 03.DOC CHANGE PROPOSAL REQUEST 1.PRO,IECT N B l i 2.CONTRACTOR J TRUCTORS 3.PROJECT NO. ~~ (Mange prcp~ ~ WCD # 3 on orth lack Cat L ft Stat C CONS 5.CONTRACT NO: 6.PROPOSAL DATE 9-Se DESCRIPTION OF CHANGE R®vise the material of the odor scrubber pig from PVC to SS at the ®xterior only to protect from UY breakdown. ~T SUMMARY FOR CHANt,1E WORK DIRECTLY PIBiFORMED BY THE UNDERSIt3NED CONTRACTQR 4. Duct labor w/ tabor tringes (AttadT supporting detati estimates witir man-hows and rates) $ 2 Insurance ar~d Labor Tama; $ - 3. Arterials and Equlpmerrt. Detafled quar~ias attached. $ - . Overhead 8 Fee ~ 1596 $ - $ - Time Erctmrdon Requested 01NOrkino dax JC Constructors' Coat $ - .s: For work m tie pecionned b!- sutxontractors, per proposals end detalt~l brsakdovms 1 IVA1/E CATEGORY aF VYORK YMC Mechanical HVAC 375 A~~,ac~rraa~roRnwow~rtMCUmerc3s~.a $ 375.00 s conn~RacTORSN~TOraLS~urrracroRa~unrr® s ar~rr~ $ 18.75 earro cosy M:.o+er+ooo $ 5.91 C. TOTAL INCREASfE OR DECREASE OF CONTRACT RRICE - (Ag+t3!'~ $ 399.66 JC CONSTRUCTOt3S, INC. CONTR4CTOR NAME n.. r.. PR9YTIDNAdrEfJ1VPR(?P'OS4r. _ SH3NATURE/DATE I Page 1, JCC WORK CHANGE DIl2ECTIVE No. 004 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: January 28, 2008 EFFECTIVE DATE: January 28, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Generator Room has been reclassified which required additional fireproofing which included additional gypsum boazd and other miscellaneous changes. Purpose of Work Change Directive: JUB Engineers and Ada County reclassified this room after the contract documents were completed. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or mare of the following methods of determining the effect of the changes}. Method of determining change in Contract Price: ^ Unit Prices x Lump Sum ^ Other Method of determining change in Contract Times: Estimated increase (decrease) in Contract Price: Lump sum price quotation to be supplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECO ND by ENGINEER: Phil Kric um, P.E. By: (u rite ignature) Contractor's records Engineer's records Other Estimated increase {decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated tunes are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: (Aut rued Signature} F:\PROJECTMANAGERS\PHK\10A5-02frMERIDIAN NORTH BLACK CA'IICONSTiLIFT sTATION\CONS'I~CO&WCD\WCD ~.DOC CHANGE PROPOSAL REQUEST .rKwta: ~ 2.CONTRACTOR 3.PROJECT NO. North Biack Cat Lift S#atlon JC CONSTRUCTORS ~~ S.CONTRACT NO: DESCRIPTION OF CHANGE Re-classificatlon of the ire ratlng of th® gen®rator room. Change Propose! ~ WCD # 4 B.PROPOSAL DATE 10Se cosT su~retaRY A. FOR CHANGE WORK DIRECTLY PERFORtif~D BY THE UNDERSIGNED CONTRACTOR 1. Direct labor wt labor fitnges (Attach suppcrtlng detail estimates with rt~an-hours arttl rates) $ 2 ir~aareoe and LaEwr Tames $ 3. Materials ar~d Equilunerd. Detailed quaud~tes attached. ~ $ . Overhead ~ Fee (~'j 15'% $ $ 'Titrae Errtertton Requested 0 working day .IC cotors• cost $ 2,7.29 ~.~ 785.26 613.23 - 4 701.41 rFor work to tre perfomt~l by subcontractors, per proposals amt detaMed breakdowns ~. Nn-er: cn'~vuowc asouNr srrRacroRrsua.area~ $ _ ~MRACrO~tSCONJONTbTAL51~IBrAMRACTQRAMOlINr~ S PERCENT- $ eav°°osres.°'e+'°°° $ 70.52 c rornL IhICREASE OR DECREASE o~ coNTRACT PRICE . (as+ss) $ 4,771.93 .IC CONSTRUCTORS, INC. CONTRAC7CV2 NAAl~ Jtm Cox PRWTIDNAILONPRQppSAL srr~Ng7zrRt:innTe Page 1, JCC WORK CHANGE DIRECTIVE No. 005 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: August 12, 2008 EFFECTIVE DATE: August 12, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You aze directed to provide a price quotation for the following change(s): Increase the Primary Utility Service Allowance to $50,000 to extend the electrical service to the lift station. Purpose of Wark Change Directive: The Primary Utility Service Allowance of $30,000 has been exceeded due to the charges to extend electrical service to the site by Idaho Power. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: x Method of determining change in Contract Times: Unit Prices ^ Contractor's records Lump Sum ^ Engineer's records Other ^ Other Estimated increase (decrease} in Contract Price: Lump sum price quotation to be supplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMEND by ENGINEER: Phil Kri um, P.E. By: ( ut ' e ignature} Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: c ,~ (Authorized S gnature} F:U'ROJECTMANAGERS\PHK1(0-05-026-MERIDIAN NORTH BLACK CA'IrCONS7V.IFr STATION\CONSTtCO&WCD\WCD OS.DOC CHANGE PROPC3SAL REQUEST i.PROJECT 2.CONTRACTOR 3.PROJECT NO. ~~ Change Proposal ~ WCD #5 North Black Cat Lift Station JC CONSTRUCTORS S.CONTRACT NO: 6.PROPOSAL DATE 10-Se DESCRIPTION OF CHANGE The original contact had an electrical allowance to c:ov®r the cwt of final electrical service into project. The allowance has been exceeded to cover additional unforseen costs to bring 3 phase power into the project site. JC is requesting an increase to the contract to cover the total below. ~ suearraRY A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR 1. Direct fabar rv/ labor fringes W~ suppo-iing detaD estlmates wfHt man-hours and ret~) $ - 2. Irtswance and Labor Taxes $ - 3. ktaterMls and Egrr>pment. Detailed quarr5tles attached. $ 19,817.00 4.Overhead & Fee ~ 1596 $ 2,972.55 $ - lime Ermrtntian Regrmsbad 0 wonting day JC Constructors Cast $ 789.55 For vrortc to be parfomred by subcontractors, per proposals and detailed breakdowns ~. roFwc~nc z n~trt:actgRar~n~rrst~.o~ $ - s oavnxncror:sorvmrnLSUacoNrRna~arrmmrrg s r~cenrr: $ - eor~ocosrgsmanooa $ 341.84 C TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+B6) $ 23,131.39 JC CONTRACTOR$. INC. coaraacnsRwu~ Jim Cox wue: ~r~osar_ s~varu~ivare Page 1, JCC WORK CHANGE DIRECTIVE No. 006 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: September 12, 2008 EFFECTIVE DATE: September 12, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Change the exterior block out to "Sedona" red color, in both split and precision facing. Purpose of Wark Change Directive: To match the block colors that we have selected for the lift station. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of detemuning change in Contract Times: ^ Unit Prices ^ Contractor's records x Lump Surn ^ Engineer's records ^ Other ^ Other Estimated increase (decrease} in Contract Price: Lump sum price quotation to be supplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: Phil Kric um, P.E. By: (A horize ~gnature) AUTHORIZED by OWNER: sy: (Authorized Si tore) F:\PROJECTMANAGERSIPHK\10-OS-026-MERIDIAN NORTH BLACK CA'1\CONSI1LIFr STATION\CONST\C08cWCD\WCD 06.DOC CHANGE PROPOSAL REQUEST ..PROJECT 2.CON'{'RACTOR 3.PROJECT NO. 157 C~nQe prgpps~ g WCD # ~ North Black Cat Lift Station JC CONSTRUCTORS S.CONTRACT NO: B.PROPOSAL DATE 9-Se DESCRIPTION OF CHANGE Revise t:tte color of the exterior block to red from grey. cosT suMINARY FOR CHANGE WORK D{RECTLY PERFORMED BY THE l1NDERSIGNED CONTRACTOR 1. Direct latmr w/ lei~rn' cringes (Attach supporting detaN estimates vaRh man-hours end rata) $ - 2 Ir~urance and Labor Taxes $ - 3 Matertats arid Equipment. DetaAed quantities attaci-ed. $ - .Overhead & Fa ~ 15% $ - $ - Time Extentton Rey~ect 0 working day Jc Corr~ructors` Cow $ - `For work to Ue performed try su~ormractora. per Proposals and detailed bralcdawns .^ ~. 4200.2 rora~~Ar~u~rrpr+rcLUCarasuaor~ $ 4,200.20 cor~rnncTOr~co~akTOrnLSUraxNrrw~crorznerouwr~ a armor. $ 210.01 rxmrrRacroas aoNO cosy ~ sa+anmo $ 66.15 C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A8+85} $ 4,476.36 JC CONSTRUCTORS, INC. covtrzacrrrrtwus~' Jim Cox arat~ororROP+~sar. sc~varv~~rurt i Page 1, JCC WORK CHANGE DIRECTIVE No. 007 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: November 1, 2008 EFFECTIVE DATE: November 1, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Add two bollards to protect the propane tank at the lift station. ~~~ Purpose of Work Change Directive: If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ^ Unit Prices ^ Contractor's records x Lump Sum ^ Engineer's records ^ Other ^ Other Estimated increase (decrease) in Contract Price: LumU sum price quotation to be supplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Estimated sncrease (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: Phil Kric um, P.E. By: ( h ed Igna AUTHORIZED by OWNER: By: _ (Authorized Si e) F:IPROIEGTMANAGERSIPHK110-OS-026~MERIDIAN NORTH BIACK CAT~CON511IIFT STATI4MCONS'1\CO&WCDIWCD 07.DOC PRO,iEGT 2.CONTRACTOR 3.PR{?JECT N0. Change Proposal ~ Narth task Gat Lift station JC CTI~CT~S 1sT ~1 S.CONTRACT N0: 6.PROPOSAL DATE Add 2 t~ottards at the pr®pane tank FOR GHAAJGE WORK DtREGTLY PERFORIiOiED SY TiiE UidDERSfGP1ED CONTI3AGTOR i. Direct labor w! labor fringes (Attach supporting detail estimates with rnan-hours and rates) $ $33,1 g 2. Insurance and Labor Taxes $ 15().39 3. M1Aateriais and Equipment. Detailed quantities attached. $ 400.00 4. Overhead & Fee ~ t 5% $ 177 61 $ - Tirree Extention Requested 0 working day JG Constructors' Gost $ 1,361.69 i3. For wank to be pertarmed by subcontractors, per proposals and detailed br®akdowns ~. SUBCONTRACTOR NRME CATEGORY OF WORK AMOUNT suacoNTRACroRAMOUNT {rNCLUp~NO sus. oHaP>: ! ~ coNTRACTORS COMARtssK)N oN ToTA~ suBCONTRACTOR A~aouNV ~ s PERCeNr: $ _ CONTRACTORS 80Np COS; ~ S.Q98/1000 $ 'ZQ ,4?v C. TOTAL 1NGREASE OR DEGREASE OF GON3ttAGT PRICE - (A~+136} $ 9 ,362.11 JC GOhtSTRUCTORS, IidC. CONTRACTOR NAA4E JIRt Cax PRINTED NAME C)N PROPOSAL St63NATUREJpA7F Page 1, JCC WORK CHANGE DIRECTIVE No. 008 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: September 15, 2008 EFFECTIVE DATE: September 15, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Swap out indicator lights, relocate terminal strips, add relays and relocate components in the control panel. Purpose of Work Change Directive: Modify the contral panel to match tine field conditions. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ^ Unit Prices x Lump Sum ^ Other Method of determining change in Contract Times: ^ Contractor's records ^ Engineer's records ^ Other Estimated increase (decrease) in Contract Price: Lump sum price cuotation t® be supplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECON~D by ENGINEER: Phil Krich P.E. By: (A onzed gnature} Estimated increase (decrease} in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: (Authorized ignature} F:IPROJECrMANAGERSOPHKI(0-05-026-MERIDIAN NORTH BLACK CATiCONST~I.IFr STATIOMCONST~CO&WCDI~CD 08.DOC FOR C GE WORK DIRECTLY PERFORI;AED BY THE UNDERSIGNED CONTRACTOR 7. direct tabor wt labor fringes {Attach supporting detalt estimates with man-hours and rates} $ _ 2. Insurance and tabor Taxes $ e 3. Materials and Equipment Detailed quantities attached. $ _ 4. Overhead & Fee @ 15°h $ _ $ _ Tdme Extention Requested 0 working day dC Constructors° Cost $ _ S. For work to be performed by subcontractors, per proposals and detalied breakdowns 9. SUBCONTRACTOR NAME CATEGORY OF WORK AMOUNT psNlE EiectrscaUcontrols __ 4121.27 TOTAL SUBCONTRACTOR AMOUNT (INCLUDING SUB. OHBPj: ~ 4,121.27 a CONTRACTORS COMMIS3fON ON TOTAL SUBCONTRACTOR AMOUNT ~ 5 PERCENT: $ 206.06 GoNTRAGroas aoND CAST ~ s.o~enaoo $ 64.91 C. T®T~IL INCRE,~SE OR DECREASE OP CONTRACT PRICE - {Aa+gS} $ 4 392 24 JC CONSTRUCTORS, INC. CONTRACTOR NAME .llm reOx PRINTED NAME ON PROPOSAL SfGNATURE /DATE Page 1, JCC WORK CHANGE DIRECTIVE No. 010 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: November 15, 2008 EFFECTIVE DATE: November 15, 200$ OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Revise the fan motor from single phase to three phase. Purpose of Work Change Directive: To resolve a conflict with the motor sizing between the electrical and HVAC plans. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ^ Unit Prices x Lump Sum ^ Other Method of determining change in Contract Times: Estimated increase (decrease} in Contract Price: Lump sum price quotation to be supplied from JCC. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMME by ENGINEER: Phil Krich P.E. By: ,~ {Au orized S tore) Contractor's records Engineer's records Other Estimated increase (decrease) in Contract Times: Substantial Completion: 0 days; Ready for final payment: 0 days. If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED by OWNER: By: (Authorized Signature) F:\PROJECTMAiVAGERS\PH[CU O.OS-ffIbMERIDIANNORTH BLACK CAT\CONST~I.IFr STATION\CONSTiC08cWCDlWCD IO.DQC CHANGE PROPOSAL REQUEST North Black Cat lift Station I JC CONSTRUCTORS ~'~ 1 a.coNrnACT Na Revise the fan motor to a 3 ph motor instead of the 110 motor that was specified. Reference JC RFi # 15 FOR CitANf3t3 WORK DUtECTi Y PERFORMED BY THt3 UNDERSlQNt?D CONTRACTOR . Dtred ~bor vW labor irfnges {Attach sup~ttir-g detaU estimates vvtU~ r~rt-haaua and nat~} . Insurance arrd I.aborTaxes . Materials and Equlpmern. Detalted quanltUes attached, Overhead & Fee ®1896 Thee Exmndon Requested 0 workirta day .ic co»ewctore' cost Change Proposal ~ WCD # ~ iC DATE B. Fbr work to' be pertomied by subcontractors, par proposals and detailed brealcdovrne -- nos caroFn~wc YMC HVAC a9l3 TOTAlB!lB~NTRNCTOR ANaINT(INCLUDWO StJe. QH3P~ .~ S9S.OO CONiTRAC7oDRSCaHget881pNON70TM.SUBCONiRACTORAMOdJNrQ 8 PERCENr: $ Z8.7rJ e~cosreswanooo $ 9.37 C. IOTA! INCREASE OR Dt2CREASE OF CONTRACT PRICE - {AS'r'~ ~ 634.12 JC CONSTRUCTORS, INC. c~aawe~ Jim Cox ~avt®ntauaoN~trawosnr. soatrta~iaare Page 1, JCC WORK CHANGE DIRECTIVE No. 011 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: November 15, 2008 EFFECTIVE DATE: November 15, 2008 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change{s): Provide an estimate for the oil cost escalation during the project. Purpose of Work Change Directive: The raw cost of the asphalt had increased significantly during the project. This accounts for the increase in oil cost. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the fallowing methods of determining the effect of the change(s). Method of determnung change in Contract Price: x Unit Prices Lump Sum Other Method of determining change in Contract Times: ^ Contractor's records ^ Engineer's records ^ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease} in Contract Times: Lump sum price quotation to be supplied from JCC. Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: AUTHORIZED by OWNER: Phil Kric , F.E. By: e By: ~ f. (Autho zed igna e} (Authorized sign e} F:IPROJECfMANAGBRSIPHK110-OS-026-MERIDIAN NORTH BLACK CATICONS'N.IFT STATIONICONS11C0&WCDIWCD 11.DOC CHANGE PROPOSAL REQUEST 1.PROJECT North Black Cat Lift Station 2.CONTRACTOR JC CONSTRUCTORS 3.PROJECT NO. X87 Change Proposal ~ WCD ~ I1 S.CONTRACT NO: B.PROPCBAL DATE 26-Nov-08 DESCRIPTION OF CHANGE Asphalt inflation prices. The raw cost of asphalt increased signiflcar>tiy between the bid data and the actual placement of the asphalt. This Change is for the increase in oil only. Neither JC nor C S A Paving has added OH&P. To the material inflation cost. cosy suela~-RY A FOR CHAN©8 WORK DIRECTLY PERFORMED BY THE UNDERSIflNED CONTRACTOR 1. Dlrecs lahot w/ labor idnges {Attach stippordng detail Bsdttlatee wit+1 matt-poufs antl rates) $ - 2. Insurenco arsi Labor Ta>oea $ 3. Materials and Eq~ilpment. Detailed quantity attached. $ 4.Ovefitead & Fee (~ 1596 _ Time t-xtantton Requ~ad 41NOt'Idncl~j( JC ConatrucGOra' Coat $ - 8. Far work to ba peHormsd ~ spt~oantraotors, per proposals and dstaged breslutowns s. cA7rcaaro>=wo>~lc aerouNr C ~ A in As halt 7163 mrrasusco~ncronnMOUrrrtiNa.uov~osuaa~c $ 7~163.W escow~ero~wvmrn~c~rw-cTOe~u+owar o ~ertcenrr ~ $ rxwraacmRSaon~c~sr~ao+enooo $ 1a~.45 C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE • (A8+6$) $ 7,270.45 JC CONSTRtICTOR8. INC contr~ctoRaa,~ Jtm Cox PRWrEO NAII~ON PROaOSat SIptATURS/OATS Page 1, JCC WORK CHANGE DIRECTIVE No. 413 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: March 17, 2009 EFFECTIVE DATE: March 17, 2009 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Provide an estimate for the installation of a new chopper pump in place of one of the vertical pumps. Purpose of Work Change Directive: At the present time, flows are too low for the vertical pump. A chopper pump will better handle low flow scenarios. If a claim is made that the above change{s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: ^ Unit Prices x Lump Sum ^ Other Method of determining change in Contract Times: ^ Contractor's records ^ Engineer's records ^ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Lump sum price quotation to be suTaplied from JCC. Substantial Completion: 0 days; Ready If the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorization. involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND by ENGINEER: AUTHORIZED by OWNER: Phil Kris , P.E. Clint Dolsby, P.E. By: By: (A e Lgnature} (Authorized S gnature} F:1PR0lECTMANAGERS\PHIC\i O-OS-026-MERIDIAN NORTH BLACK CAI~CONS'iWFT STs1TlON\CONSIIGO&WCDIV~CD l3.DOC HIV T 1.PROJEGT 2.CONTRAGTOR 3.PROJECT NO. Change Proposal # Noah Black Cat Lift Station JC C®NSTRUCTORS 757 ~ 5.CONTRACT NO: 6.PROPOSAL DATE 20-Dec-08 ~DESCRJ(~TIGN 4F CHANGE Install a new chopper pump in place of one of the vertical pumps -sr suMMARY FOR CHANGE WORK DIRECTLY PERFORMED i3Y THE UNDERSIGNED CONTRACTOR 1. Direct labor w/ labor fringes (Attach supporting detail estimates with man-hours and rates} $ 3,541.88 2. Insurance and Labor Taxes $ 844.05 3. Materials and Equipment. Detailed quantities attached. $ 16,300.00 4.Overt~ead & Fee aQ 15°I° $ 3,102.$9 Time Extention Requested 0 WOI'kina daV JC Constructors' Cost $ 23,788.82 69. For work to be performed by subcontractors, per proposals and detailed breakdowns 4. SUBCONTRACTOR NAME CATEGORY OF WORT( OUNT TOTAL SUBCONTRACTOR AMOUNT pNCLUDING SU9.OH&P~: $ 3 CONTRACTORS COMMISSION ON TOTAL SUBCONTRACTOR AMOUtJT ~ 5 PERCENT: $ CONTRACTORS BONgCOST ~ s.01&1000 $ .56.83 C. TOTAL INCREASE OR DECREASE OF CONTRACT PR[CE - (Ati+B5} ~, ,,, ~ ,,, ,~„ JC CONSTRUCTORS, INC. CONTRACTOR NAME Jim COX PRtNTED NAME ON PROPOSAL S/GNATURE/ DATE Page 1, JCC WORK CHANGE DIRECTIVE No. 014 You are directed to provide a price quotation for the following change(s): Provide an estimate for the maintenance and set up of the black cat north generator. Purpose of Work Change Directive: The generator needs normal maintenance and needs to be set up to run with the north black cat lift station. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim far a Change order based thereon will involve one or more of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: Method of determining change in Contract Times: ^ Unit Prices ^ Contractor's records x lump Sum ^ Engineer's records ^ Other ^ Other F:IPRQJECTMAlVAGERSIPHK'~lo-OS-ffL6-MERIDIAN NORTH BLACK CATICONST1LIFr STATIONIC~DNST~C08tWCIAWCD 14.DOC CHANGE PROPOSAL REQUEST North Biack Cat Lift Station ~ JC CONSTRUCTORS 1~~ No: Maintenance work on the owner supplied generator. Work performed by EC Pow®r. See the EC Power invoic® for description of work performed. FOR CHANf3E WORK DBtECTLY PERFORtYIED l3Y THE t/NDt.RBIGNED CONTRACTOR Direct labor ad ~bor 5ingea (Attach strpport4~g deffi~ estimates w$I1 men hours and rates) Insurance and Labor Taxes tuteterials and EqulpmenG oatened quaMitlES attached. Ovefiead & Fee (d~ 1896 Time ExtetltiOt- Req~ted 0 wOrking ~1L JC ConstrucEOrs' Change Praposel ffi DATE L. For work to be pertorrued by eubeontractora, per propoeate and detalfed breakdaams ~. cnTEC~nRYCFwGwt ~ EC Power Industrial Power 3084.38 s TAISUfRACTORMtOWJr1NO3UB.OFtsP~ s $ 3,084.38 c~nsswrtoNTODU.susooarRacT~rwouxr~ a ~RCENr $ 154.22 cxzHNrra~o~ etuu~ ogre sotenow $ 48.58 C. TOTAL INCRl.At38 OR DECREASE OF CONTRACT PRICE - (At3+13b) $ 3 287.48 JC CONSTRUCTORS, INC. C~IMRAC70RNAA~ Jlm Cox >~iw78DnrareawPRpaoSat ecaanae:iaarE Page 1, JCC t ~y WORK CHANGE DIRECTIVE No. 015 PROJECT: NORTH BLACK CAT LIFT STATION DATE OF ISSUANCE: March 17, 2009 EFFECTIVE DATE: March 17, 2009 OWNER: City of Meridian Project No. CONTRACTOR: JC Constructors ENGINEER: JUB Engineers, Inc. You are directed to provide a price quotation for the following change(s): Provide an estimate for the installation of sound attenuation at the wet well side of the Scrubber intake pipe. Purpose of Work Change Directive: To reduce the noise for nearby residents and lift station operators. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change order based thereon will involve one or more of the following methods of determining the effect of the change{s}. Method of determining change in Contract Price: Method of determining change in Contract Times: ^ Unit Prices ^ Contractor's records x Lump Sum ^ Engineer's records ^ Other ^ Other Estimated increase (decrease) in Contract Price: Estimated increase (decrease} in Contract Times: Lump sum price quotation to be supplied from JCC. Substantial Completion: 0 days; Ready if the change involves an increase, the estimated amount for final payment: 0 days. If the change is not to be exceeded without further authorizatian. involves an increase, the estimated ti>gles are not to be exceeded without farther authorization. RECOM by ENGINEER: AUTHORIZED by ®WNER: Phil Kri um, P.E. Clint Dolsby P.E. By: By: (A orized igna e) (Authorized S gnature) F:\PROJECTMANAGERS\PHK\10-OS-026-MERII?IAN NORTH BLACK CATICONSTIL~!' STATIONICONSTICO&WCD\WCD 15.DOC CHANGE PROPOSAL REQUEST t.PROJECT North Black Cat Lift Station 2.CONTRACTOR JC CONSTRUCTORS 3.PROJECT NO. 1~ Change Prod d 1n/GD scoNTRACT No: a.PROPOSAi. DATE 2@,lan-~ DESCRIPTION OF CHANGE Add sound attenuation at the wetwet[ side Scrubber intake pipe. COST SUMEAAARY A. FOR CHANGE WORK DIRECTLY PERRORIl~ED BY TILE UNDERSIGNED CONTRACTOR 1. Direct iabor,x/ labor Uirrges (Attach aupper8ng detaq estlmates with man-haute aral rates) $ _ 2. ir~urance and Labor Taxes $ 3. NlatariaN and E~ipmeM. Detailed quanff8~ attactred. $ _ 4.Overhead 8 Fee (8 7846 $ Time ExQerrtion Requested 01NOP~ttiy day .IC Constr+rators~ Coat $ - & Rot work to be performed by subcontractors. Per proPosats and detailed breakdowns s. NANS CATEGORY OR wORIC AbICUNT YMC HVAC 2851 s TQTAL BUBCGNTRACTOR ANlCURT ONCWDINO BUB. aHBPx a CONTRACTORBIGNONTOT/ILBUBCOMRACTmtAMOUNT~ 6 PERCENT: $ 2,851.00 $ 13Z.SS c°Nr`z-cT°RS soND ~sT ®smenooo $ 41.75 C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE « (Ag+gg~ $ 2, 825.30 JC CON8TRUCTORS.INC. COMRACTCRAVM~ Jlrn Cox P~vNna~oHPROPOSar. sronwTrr~sica~ Page 1, JCC