CONTRACT CHANGE ORDER
Change Order No.: 2
Project Number. 0654a
Date: 4/7/2009
Effectlve gate:
CONTRACTOR: Star Construction, LLC
PROJECT: Class A Reclaimed Wastewater Dlsinfecdon and Distribution Improvements
The Contractor is hereby directed to make the following changes from the Contract DocumerMs and Plans.
Desclptlon:
1) Relocation of heat pump discharge
2)
3)
Reason for Change Order:
Heat pump discharge needs to be relocated to conform to permit.
Attachments:
Estimate
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price: $79,790.00 Original Contract Completion Date:
Original Contract Completion Days:
Net changes form previous C.O: s.: Net Days dtange form previous C.O: s:
No. 1 to 1 No. 0 to Q
$7,572.41
Contract Prig Prior to this C.O.: Contract Completion Date before this C.O.:
$87,362.41
Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.:
$12,055.05
Contract Price wNh ail Approved C.O.'s: Contract Completion Date with all Approved C.O: s:
$99,417.46
F
ENDE
D
O s
ACCEPTED
ONY CTO
: (
c
:
N
TRUCTIO G
.R)
REC
MM
O
S (C
l~j1,
~
~
`/j
(y
~//
(
~
(/ "7.
Data: CF, ""~ . (~ C,
R Date: ~ , ~ a- ~ g
R IN AG
APPROVED: (CITY PU COUNCIL APPROVAL
~ ~ i~ e ~
By: Keith Watts ~ (,~ ~ V ~````~t~~
r+,f +~~~i
~
~ / ( l/ /
Date: ~ .- ® aa~~~
~~®~
Data:
APPROVED: {C ATTEST: ~ , ~ ~~
M ~~G~~~ a
H
~
By: Mayo Tammy de i,
By: City Clerk, Ja
~ ~~~~ ~
Date: ~ ~ ~ Date: ~ 71-
~:rfi. -
Star Construction, L.L.C.
P.O. Box 157 Star, ID 836b9
(208) 286-9198
I IW me /Address I
City of Mcridian
33 E B~dway Ave
Meridian,lD 83642
Estimate
oats Estimate #
3/30/2009 75$
Project
P~ Qty Cost Total
CSCO, 4001E 1.5 "class 160 hdpe pipe with fittings, saddle, act. 1 736.69 736.69
Clements , 3/4 "road mix 20 16.7913 135.83
Cleat~ts, lxddiog sand (use native, hand bed) 0.00 0.00
Sod trstoration 690 I.bS2 1.139.88
Clemeatta„ screed top sail IS 23.60 424.80
Sprinkler crpeir, mice I 175.00 175.00
Star ConatnxKion. Equipment and laborreduced rate 12 287.30 3,450.00
Star Construction, mobilization 0 300.00 0.00
This quote based on eppmxi~tely 330 lineal fact of trenching at 3
foot depth or less
TOta l ~6,26Z.2o