Loading...
HomeMy WebLinkAboutChange Order No. 2 with Star Construction for Class A Reclaimed Water Disinfection and Distribution ImprovementsCITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER Change Order No.: 2 Project Number. 0654a Date: 4/7/2009 Effectlve gate: CONTRACTOR: Star Construction, LLC PROJECT: Class A Reclaimed Wastewater Dlsinfecdon and Distribution Improvements The Contractor is hereby directed to make the following changes from the Contract DocumerMs and Plans. Desclptlon: 1) Relocation of heat pump discharge 2) 3) Reason for Change Order: Heat pump discharge needs to be relocated to conform to permit. Attachments: Estimate CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: $79,790.00 Original Contract Completion Date: Original Contract Completion Days: Net changes form previous C.O: s.: Net Days dtange form previous C.O: s: No. 1 to 1 No. 0 to Q $7,572.41 Contract Prig Prior to this C.O.: Contract Completion Date before this C.O.: $87,362.41 Net Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $12,055.05 Contract Price wNh ail Approved C.O.'s: Contract Completion Date with all Approved C.O: s: $99,417.46 F ENDE D O s ACCEPTED ONY CTO : ( c : N TRUCTIO G .R) REC MM O S (C l~j1, ~ ~ `/j (y ~// ( ~ (/ "7. Data: CF, ""~ . (~ C, R Date: ~ , ~ a- ~ g R IN AG APPROVED: (CITY PU COUNCIL APPROVAL ~ ~ i~ e ~ By: Keith Watts ~ (,~ ~ V ~````~t~~ r+,f +~~~i ~ ~ / ( l/ / Date: ~ .- ® aa~~~ ~~®~ Data: APPROVED: {C ATTEST: ~ , ~ ~~ M ~~G~~~ a H ~ By: Mayo Tammy de i, By: City Clerk, Ja ~ ~~~~ ~ Date: ~ ~ ~ Date: ~ 71- ~:rfi. - Star Construction, L.L.C. P.O. Box 157 Star, ID 836b9 (208) 286-9198 I IW me /Address I City of Mcridian 33 E B~dway Ave Meridian,lD 83642 Estimate oats Estimate # 3/30/2009 75$ Project P~ Qty Cost Total CSCO, 4001E 1.5 "class 160 hdpe pipe with fittings, saddle, act. 1 736.69 736.69 Clements , 3/4 "road mix 20 16.7913 135.83 Cleat~ts, lxddiog sand (use native, hand bed) 0.00 0.00 Sod trstoration 690 I.bS2 1.139.88 Clemeatta„ screed top sail IS 23.60 424.80 Sprinkler crpeir, mice I 175.00 175.00 Star ConatnxKion. Equipment and laborreduced rate 12 287.30 3,450.00 Star Construction, mobilization 0 300.00 0.00 This quote based on eppmxi~tely 330 lineal fact of trenching at 3 foot depth or less TOta l ~6,26Z.2o Customer Signature