Loading...
HomeMy WebLinkAboutChange Order No. 1 with Civil Survey Constultants, Inc. for 2008 Water System Flush Lines DesignCITY ~F MiERIiD 33 S T 1®AH® SI®1 , I~ 83642 NT CT CFI E ER Change Order No.: ~ 1 Protect Number. 713 Date: 3/18/2009 Etiective Date: 3118/2009 G®NTRACTOR: Civil Survey Consultants, Inc. PRt}JECT: 2008 a#er System Flu>3tt Lines - ®asign Th® Contractor is her®by directed to mako the following changos from the Contract Docum and Plana. ciption: '9) Army Corp )Dint applicatton 2} IDWR stream alteration permit application 3} 4) 5} Reason for Change Order: Two additional site were found to have damaged rip rap. A 404 & 401 permit is required to be able to repair the rip rap. chevaents: Request for change order from Civii Survey CH GE IN CANT CT PRICE: C GE !N CONTRACT TIMES: Original Contract Prioe: $37,665.00 Original Contract Completion Date: Original Contract Can etion Days: Net ct-anges form prevrous C.O's.: Net Days change form previous C.O.'s: No. Q to ® No. 0 to Q $0.00 Contract Price Prior to this C.O.: Contract Completon Date betare this C.O.: $37,665.00 Nst Increase (decrease) of this C.O.: Net Days Increase (decrease) of this C.O.: $1,785.00 Contract Price with ail Approved C.O.'s: Contract Completion Date with all Approved C.O `s: $39,450.00 REC ENDED: (C~VSTRUCTtON MANAGER) ACCEPTED (CONTRACTOR} ~" _~ _ Date: ~ Date: _h __ APPROVED: (CITY PU ~ USING ) COUNCIL APPROVAL By: Keith watts Date: ~ ~`'- j 1 Date: ~ ~ 'g~o;;, .- ~ F~ APPROVED: C ATTEST: ~~, '`;- By: Mayor Tammy de W 'rd By: City Clerk, ycee Hol an ~a ~ ~~ Date: i Date: a,, ` ~~~ 4 °~ S E ` 6.~ v6 6a~ ~r ,.,f~ ~ e~.y^ ~ ~ @ ~ u j s~1 ' ~~ i i a ~ g ~~ ~ ' ~ivil survey Consultants, Inc. i2o8~sss-a3t2 Glenn K. Beaaett, P.L.S. 1400 E. Watertower Street Fax 888-0323 President Suite 100 'fimottry a Burgess. P.E. Meridian, Idaho 83642 Vice President March I b, 2009 Roxanne Holland, F.IT City of Meridian 660 E. Watertower, Suite 200 Meridian, ID 83642 Re: Flush Line Repairs Dear Roxanne: We are requesting a supplement to Task Order No. 0713 for the 2008 Flush Lines, to cover additional work that was not included in the original scope of services. 1. Work effort to obtain Army Corps of Engineers 404 permit to repair the rip rap at the existing well 24 flush line. 2. Work effort to obtain Army Corps of Engineers 404 permit to repair the rip rap for the existing flush line at the W WTP entrance. 3. Work effort to obtain Idaho Department of Water Resources stream alteration permit to repair the rip rap at the existing wcll 24 flush line. 4. Work effort to obtain Idaho Department of Water Resources stream alteration permit to repair the rip rap for the existing flush line at the WWTP entrance. 5. Work effort to obtain an IDEQ water quality certification for the rip rap repairs at the two above stated sites. Our original contract was for a not to exceed amount of $37,bb5. We arc requesting an additional amount of $1,785.00 to cover the additional work as outlined above. if you have any questions, or require additional information, please feel free to call me. Sincerely, C1V[L SURVEY CONSULTAT\TS, INC. )°~- Corey Peacock, P.E.