Loading...
HomeMy WebLinkAboutTask Order No. 0747 with CH2M HILL, Inc. for Design of the Ferric Chloride Feed FacilityT~s~ c~ ~~a ~~ ~ ~ ~~ M ~~ ~~ ~~M ~~ ~~~~A~ S~v~C B~~~~~ For CH2M HII.I., Inc. dated. this day of , 2~9. By: ame Title For City of Meridian :,,,F:. dated this ~~" day of ~,~,.;,;;,~~~~-~~,~,rtt= ~ ~9-~,.: ~ rF s gy: o Tammy de We M r SEAL Attest• 9 ~~' aycee n, City Clerk "~ r 1St . ~~"~ .,° ~~.~ , ~: Approved By City Council: °~ ~~~ ~ ~ , ~; Punch /i~~ ~ Public Works t c e o a ices rj t nrt i Ferric chloride is being used to control struvite in the new digesters and centrate return system. The City would like to use bulk storage instead of the current totes. Construction drawings will be developed from the existing CEPT feed drawings to reduce engineering costs. The project will be constructed as a change order to an existing construction contract. Deliverables will be a ehange order package and not public bid documents. c r CI-i2M HILL will perform the tasks for design of the Ferric Chloride feed facilities as outlined below. Task 1-Project anaement Project management includes project scoping, staff management, task coordination, monitoring project progress, preparing invoices, and ensuring project quality control.. Task 2-esign 2,1 Prepare Plans and Specifications Plans will be produced to allow the Contractor to price the work. Equipment specifications will be noted on the drawings. The following is the anticipated list of drawings: ® Site Plan/Yard Piping • fiction and Details • Structural Nates, and Details • Electrical Schedules & Diagrams 2.2 IDEA Submlttai Two copies of plans and specifications will be submitted to TDEQ for approval to construct. Attachment B Compensation lave! of Effort The task level of effort estimate is $7500. CH2M HILL has developed this level of effort estimate based on the work plan presented herein and assumptions stated previously. The „rr~ fees will be billed as tune and material, and will not exceed the total amount below without prior approval by the City. Schedule We can proceed without a contract when a letter or e-mail notice to proceed is received. The IDEQ submittal can be done in two weeks.