Loading...
HomeMy WebLinkAboutChange Order No. 1 with H2 Excavation for Heroes Park Tee/Pressure Test for Wastewater ReuseCHANGE ORDER 1 Pro~s3' ~ ~7Zy PROJECT: City of Meridian Heroes Park Tee/Pressure Test for Wastewater Reuse DATE OF ISSUANCE: October 31, 2007 EFFECTIVE DATE: November 8, 2007 OWNER: City of Meridian CONTRACTOR: H2 Excavation, LLC You are directed to make the following changes. ENGINEER: HDR Engineering, Inc. 1. Expose the pressure sewer pipe on the shoulder of Black Cat Road near Heroes Park to cut the 16-inch tee in, install a concrete collar and traffic control as required by ACRD. Reason for Change Order: Location of existing underground pressure sewer was not where shown on the field locates. Attachments: HZ Excavation LLC invoice for work associated with the changes. CHANGE IN CONTRACT PRICE: CHANGE 1[N CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 14.$50.00 Ready for Final Payment: days or dates Net Changes from previous Change Orders No. 0 to No. 0 Net Changes from previous Change Orders No. 0 to No. 0 0 Days Contract Price prior to this Change Order Contract Times prior to this Change order Substantial Completion: 14,8$O.UU Ready for Final Payment: days or dates Net Increase (decrease of this Change Order) Net Increase (decrease of this Change Order} $ 4 090 00 , . days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: $ 18,940.00 Ready for final payment: days or dates ACCEPTED BY CONTRACTOR: B v ` Y~ Con (Authorized Signature) ~~`~(-ate Date: APPROVED BY OWNER: Clint olsby, P. ., Pub ' Works Date: ~~3 t w'7 Taf//sunfy de Weerd~ Date: `~'~~''0 Approved by City Council: ~oy~jr ~~ ~~ G~,t •. ~~ ~ ~" •`s s. day r ~~~ 'l~i m G Berk Jr., City ~~ Date: fl' ~ '® r/j`/' ~~ ~ tt~ ~ ~!1 ~f~~~.`tftt"1tlfti\~~`\ 10/25/2007 12:56 PM FROM: Hibbard 6426894 H2 Excavation TO: 898-9551 PACE: 003 OF 003 Excavation, LLC 843 Bluegrass Way Middleton, Id. 83644 ~: ~tll•~o< ~:; T r; ~ , City of Meridian Attention Clint Dolsby 660 E. Watertower Ln. Ste 200 Meridian, Id. 83642 Invoice Date 10/22/2007 invoice # 780 Project Hero ParkT-hie in Item Description Unit Type Units Price per u... Amount Extra's 2 Flaggers Hours 60.00 840.00 14 Extra's Extra depth excavation and trench box rental LS 2,500.00 2,500.00 Extra's Concrete collar EA I 750.00 750.00 i We appreciate your business, thanks! TO~I 54,090.00