Loading...
HomeMy WebLinkAboutChange Order No. 5 with J.C. Constructors for WWTP Expansion Project (2)CHANGE ORDER 5 PROJECT: City of Meridian -Wastewater Treatment Plant Expansion Project DATE OF ISSUANCE: October 18, 2007 EFFECTIVE DATE: :October 18, 2007 OWNER: City of Meridian CONTRACTOR: JC Constructors, Inc. ENGINEER: Carollo Engineers, P.C. Page 1 of 2 You are directed to make the following changes in the Contract Documents. • Pothole and fteld adjust Secondary Clarifier RAS piping tie-in {WCD 25) • Modify electrical power feed to W system {WCD 26) • Add grating supports and sampling cutout at Secondary Splitter Box (WCD 29} • Final costs for construction of Five Mile creek bridge and outfall pipe (WCD 34a) • Realign 36"-SE pipe due to unforeseen location of Secondary Clarifier 4 effluent pipe (WCD 36) • Post Aeration Building entry steps and paving (WCD 38) • Removal of existing footing for uniform surface to construct Aeration Basin 1 & 2 extension (WCD 42) • Remova[ of unforeseen grout under filter media (WCD 45a} • Revise layout and preparation of paving around Primary Clarifiers 3 & 4 (WCD 47) • Add lighting for flag pole {RFP 022). • Credit for the elimination of asphaltic coating at the Primary Clarifier mechanism (RFP 23} • Removal and replacement of owner supplied Mag flow meter (RFP 26) • Revise pipe support hangers in Aeration Basins 1 & 2 (RFP 28) • Revise scum vault and pump slide rails at Secondary Clarifier 5 (RFP 29) Time Extension to include additional scope of work requested by the City, as follows: 1. Five Mile Creek Bridge Crossing and Flow Meter 2. Tertiary Fitter Installation 3. 42-inch Diameter Raw Sewage pipe expansion. 4. Chemical Feed Facilities for Chemically Enhance Primary Treatment and Anaerobic Digesters. Attachments: JC Constructors Change Proposal Request - (WCD 25) -September 21, 2007 for $4,789.44 JC Constructors Change Proposal Request - (WCD 26) -June 19, 2007 for $7,192.29 JC Constructors Change Proposal Request - (WCD 29) -June 20, 2007 for $836.96 3C Constructors Change Proposal Request - (WCD 34a) -August 14, 2007 for $18,417.08 JC Constructors Change Proposal Request - (WCD 36) -May 29, 2007 for $2,174.37 JC Constructors Change Proposal Request - (WCD 38) -May 8, 2007 for $14,160.64 JC Constructors Change Proposal Request - (WCD 42) -August 16, 2007 for $2,077.82 JC Constructors Change Proposal Request - (WCD 45a} -October 1, 2007 for $12,264.33 JC Constructors Change Proposal Request - (WCD 47) -September 21, 2007 for $5,157.41 JC Constructors Change Proposal Request - (RFP 22} -June 16, 2007 for $3,052.94 JC Constructors Change Proposal Request - (RFP 23) -September 21, 2007 for (-$2,241.29}. JC Constructors Change Proposal Request - (RFP 26) -September 21, 2007 for 2,867.20 JC Constructors Change Proposal Request - (RFP 28) -September 21, 2007 for $4,419.41 JC Constructors Change Proposal Request - (RFP 29} -July 31, 2007 for $11,068.15 Page 2 of 2 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 670 Davs - September 1, 2007 $ 8,367,500.00 Ready for Final Payment: 730 Davs -November 1, 2007 days or dates Net Changes from previous Change Orders No. 1 to No. 4 Net Changes from previous Change Orders No. 0 to No. 4 $ 560 48 546 zero (al , . Days Contract Alice prior to this Change Order Contract Times prior to this Change order Substantial Completion: 670 Davs - Se~tcmber 1.2007 $ 8,928,046.48 Ready for Final Payment: 730 Davs -November 1.2007 days or dates Net Increase (decrease of this Change Order} Net Increase (decrease of this Change Order) $ $6 75 236 One Hundred Twenty (120) , , days Contract Price with all approved Change Ordets Contract Times with all approved Change Orders Substantial Completion: 670 Days - September 1, 2007 $ 9,014,283.23 Ready for final payment: 850 Days -February 28.2008 days or dates Clint Dolsby, P.E., Public Works Date: I ~ ~ 19 ~rn ACCEPTED BY CONTRALTO B. Co actor (Authgqrued Sigry~a~t~re) D 14/Z2/u"J ..tuiltlt~n.. ff r'~ rF.1 111{1