HomeMy WebLinkAboutCentral District Health Final Comments. MayorTammy de Weerd
': City Council Members:
~.~ ' T ~t `~_~ Keith Bird
`,,~ ` 1 ~ Joe Borton
Charles Rountree
~-~' ~'~ ~`Y ~~ David Zaremba
August 22, 2008
~i
~ ~ ~ Hightower LLC
8312 W Northview Ste 120
Boise Id 83704 SC`~-NEp
RE: HIGHTOWER
h? Sewer & Water Construction -Final Acceptance
~:
Dear Sirs:
s rte;
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required tests, in accordance with City of Meridian Standard Specifications and Drawings,
and are hereby accepted by the City for ownership and maintenance.
-'F,~
;~
„'~ Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
~, '`;:: certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
`~ ~ In accordance with City of Meridian Standard Spec cations and Drawings, the installation and
``"" ~ materials of the sewer and domestic water systems are to be warranted against defect by the
.,
contractor for a period of one year from the date of this letter
4'~7~~
Sincerely,
~ =; rr'
Clint Dolsby
Interim City Engineer
~~ cc. City Clerk, Water Division, Wastewater Division, File
'>.~:
Y~z Land Group
~ ~- =Y~ I DEQ
-.~yi
d!
9~ ~~
,,__
Public Works Department .660 E. Watertower Street, Suite 200, Meridian, 1D 83642 f
Phone 208-898-550fl .Fax 208-898-9551 . www.meridiancity.org
,:~ ~
. i . ..
~.'~i;.
- .. ,. ~
i'.4
,a,
,~ i .. - _ -
3