HomeMy WebLinkAboutBaldwin Park 5 FP Order ApprvlBEFORE THE MERIDIAN CITY COUNCIL
C/C 07/01/03
IN THE MATTER OF THE )
APPLICATION OF CAPITOL )
DEVELOPMENT FOR APPROVAL )
OF FINAL PLAT FOR BALDWIN )
PARK SUBDIVISION NO. S, )
LOCATED ON THE EAST SDIE OF )
CINDER ROAD, APPROXIMATELY )
%: A MILE NORTH OF USTICK )
ROAD, MERIDIAN, IDAHO )
CASE NO. FP-03-037
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval pursuant to
Meridian City Code § 12-3-7 on July 1, 2003, and the Council fmding that the Administrative
Review is complete which has included certain comments as stated in a letter to the Mayor and
Council from Sonya Allen Planner I for the Planning and Zoning Department, and Bruce
Freckleton, Engineering Technician III, and that Anna Powell Planning Director for the Planning
and Zoning Department, and Dave Yorgason, commented at the hearing, and the Council having
considered the requirements of the preliminary plat the Council takes the following action:
IT IS HEREBY ORDERED THAT:
The Final Plat of "BALDWIN PARK SUBDIVISION NO. 5" as evidenced in Plat
beazing: "PLAT OF BALDWIN PARK SUBDNISION NO. 5, A PORTION OF THE NW '/ OF
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 5 / (FP-03-037)
Page 1 of 5
SECTION 36, T.4N., R.1 W., B.M., MERIDIAN, ADA COUNTY, IDAHO 2003, 30402-
PLT.DWG DLP 06/02/03, SHEET 1 OF 2, HANDWRITTEN DATE: 6/20/03 AND
STAMPED DATE: JUN 20 2003, RECEIVED JUN 20 2003 CITY OF MERIDIAN
PLANNING AND ZONING, RECEIVED JUN 20 2003 CITY OF MERIDIAN CITY CLERK
OFFICE, CAPITAL DEVELOPMENT, INC. -DEVELOPER, BRIGGS ENGINEERING, INC.-
CONSULTING ENGINEERS", Capitol Development, Developer, is Conditionally Approved
subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and
City Council from Bruce Freckleton, Engineering Technician III, and Sonya Allen Planner I for
the Planning and Zoning Department, dated: City Council Date: July 1, 2003, listing 8 General
Requirements and 25 Site Specific Requirements, a true and correct copy of which is attached
hereto marked Exhibit "A", and consisting of five pages, and by this reference incorporated
herein, and the additional requirements from the action of the Council taken at their July 1, 2003
meeting as follows, to-wit:
1.1 Comply with the Meridian Fire Department's requirements as
follows:
That afire-flow of 1,000 gallons per minute shall be available for
duration of 2 hours to service the entire prof ect. Fire hydrants shall
be placed an average of 400' apart. 1997 UFC Appendix III-A
2. Operational fire hydrants and temporary or permanent street signs
are required before combustible construction begins. UFC 901.4.2
& 901.3
3. The roadways shall be built to Ada County Highway Standards
with a 33' wide driving surface. UFC 902.2.1
4. All radii shall be 28' inside and 48' outside radius.
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 5 / (FP-03-037)
Page 2 of 5
1.2 The Central District Health Deparment requires after written
approval from the appropriate entities are submitted, they can
approve this proposal for central sewage and central water; that
plans must be submitted to and approved by the Idaho Department
of Health and Welfare, Division of Environmental Quality for
central sewage and central water; that run-off is not to create a
mosquito breeding problem; and it is suggested that stormwater be
pretreated through a grassy swale prior to discharge to the
subsurface to prevent impact to groundwater and surface water
quality; that engineers and architects should obtain current best
management practices for stormwater disposal and design a
stormwater management system that is preventing groundwater and
surface water degradation. Manuals for guidance:
1. State of Idaho Catalog Of Stormwater Best Management
Practices For Idaho Cities And Counties. Prepared by the Idaho
Division Of Environmental Quality, July 1997.
2. Stormwater Best Management Practices Guidebook. Prepared
by City of Boise Public Works Department, May 2000.
1.3 Comply with the Nampa & Meridian Irrigation District as follows:
The District requires a Land Use Change Application be
filed for review to address drainage prior to final platting.
All laterals and waste ways must be protected. All
municipal surface drainage must be retained on site. If any
surface drainage leaves the site, the District must review
drainage plans.
2. The developer must comply with Idaho Code 31-3805. It is
recommended that irrigation water be made available to all
developments within the District.
1.4 Comply with the action of the Council taken at their July 1, 2003
meeting as follows:
1. The Council acknowledges and accepts into record the
letter pertaining to the Baldwin Park project from Dave Yorgason,
Capital Development, Vice-President, faxed to the City Clerk's
office on July 1, 2003, and which is on file with the Meridian City
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDIVISION NO. 5 / (FP-03-037)
Page 3 of 5
Clerk's office. The letter acknowledges that City staff is allowing
the Baldwin Park Subdivision No. 5 to continue to be platted if
they submit an application for a new preliminary plat for the
remaining phases of Baldwin Park Subdivision prior to the City
Engineer signing the plat for phase 5. They also understand that
Baldwin Park Subdivision was approved for 2721ots initially, and
that any number of lots over 272 will not be allowed, nor would
that total number of lots be reached until the last phase is final
platted. Additionally, Mr. Yorgason agrees that they will submit a
an application for a revised preliminary plat prior to the City
Engineer signing the final plat for Baldwin Park Subdivision No. 5.
2. The fmal plat upon which there is contained the Certification and signature of the City
Clerk and the City Engineer verifying that the plat meets the City's requirements shall be
signed only at such time as:
The Plat dimensions are approved by the City Engineer; and
2. The City Engineer has verified that all off-site improvements are
completed and/or the appropriate letter of credit or cash has been issued
guaranteeing the completion of off-site and required on-site
improvements.
By action of the City Council at its regulaz meeting held on the ~ ~t day of
J , 2003.
By: ~
ROBERT D. CORRIE
`\`\~~a~"'"~"~"'~"~~+~~,,~ Mayor, City of Meridian
~ .
Attest: ~ ~y ~
,. ~ ~o~O~r qy ..,
Fo
SEAL
William G. Berg, Jr., C y C erk = v~ $^~
~, 90,E ~r TsT ~ 1 P.ZQ ~5
ORDER OF CONDITIONAL APPROV.~, 6~m~a..I~'
FOR BALDWIN PARK SUBDIVISION NO`.~54~F~'~-'l-S~b37)
Page 4 of 5
Copy served upon Applicant, the Planning and Zoning Department, Public Works Department,
and City Attorney.
"wunun~q
B iLGIiL~r--~ e
City Clerk
~-2-03
Z:1Work~MeridianNderidian 15360NPBaldwin Park No. 5 FP-03-03710rderFP.doc
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR BALDWIN PARK SUBDMSION NO. 5 / (FP-03-037)
~.~``~~ pF MER~~'%,,
,`~ G~~ ~q ',.
OFwOR:gT~' g.
~~ O
Y Qn] _
1
~i 9Q ~~`T 1S'~~ ~d \~:;
~' Q• .`
i ~
~~'%,~ourvTV . ~~,,.~`.
p~nuii nnt~~~P
Page 5 of 5
les
MAYOR
Robert D. Come
CITY COUNCII. MEMBERS
William L.M. Nary
Keith Bird
Tammy daWeerd
Cherie McCaodless
MEMORANDUM:
To: Mayor & City Council
'~ JUL 0 1 2003
From: Sonya Allen, Planner I
Bruce Freckleton, Engineering Tech III City (7f Meridian
City Clerk Office
Re: Request for a Final Plat Approval of Baldwin Park Subdivision No. 5- Thirty
(30) Building Lots and Four (4) Other Lots on 7.36 Acres in an R-8 Zone by
Capitol Development (File No. FP-03-037).
We have reviewed this submittal and offer the following comments, as conditions of the
applicant. These conditions shall be considered in full, unless expressly modified or deleted
by motion of the Meridian City Council:
APPLICATION SUMMARY & LOCATION.
This is the fifth phase of the Baldwin Park Subdivision, located on the east side of Linder Road,
approximately '/z a mile north of Ustick Road. This fifth phase of the subdivision includes 30
single family building lots and 4 common lots. The gross density of phase No. 5 is approximately
4.07 dwelling units/acre.
The subdivision is located in an R-8 zone, and all lots within the subdivision meet all of the
minimum !ot requiremems of the R-8 zone. The minimum house size within the subdivision is
1,301 square feet, not including the garage area.
The final plat included in this application does not meet the lot count that was approved with the
original preliminary plat. The applicant has indicated to staff that they will be submitting a
revised preliminary plat for the balance of the un-platted properly prior to the City of Meridian
endorsement of the final plat for this phase.
STTE SPEC~IC REOUIREMENTSREOUIREMENTS
1. Applicant shall meet all terms of the approved Preliminary Plat (PP-O1-024) and
Development Agreemern (Instrument No. 102083003).
2. The pressurized irrigation system within this development is to be owned and maintained
privately by the Homeowner's Association. The City of Meridian requires that
pressurized irrigation systems be supplied by a year-round source of water. If a creek or
FP-03-037 `
Haldwm Park Sub Nay
HUB OF TREASURE VALLEY
A Good Place to Live
CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, IDAHO 83642
(208) 888-0433 • FAX (208) 887-4813
City Clerk Office Fax (208) 888-0218
LEGAL DEPARTMENT
(208)466-9272 •Fax 466-4405
PUBLIC WORKS
BUILDING DEPARTMENT
(208) 887-2211 ~ Fax 587-1297
PLANNING AND ZANING
DEPARTMENT
(208) 884-5533 ~ FAX 888-6854
City Council D: Jul, 2003
Mayor and Council
Transmittal Date: June 30, 2003
Page 2
well source is not available, asingle-point connection to the culinary water system shall
be required. Plans and specifications for the irrigation system shall be reviewed by the
Public Works Departmern as part of the development plan review process, and a draft
copy of the pressurized imgation system O&M manual must be submitted prior to plan
approval. If a single-point connection is utilized, the developer shall be responsible for
the payment of assessments for the common areas prior to signature on the final plat by
the Meridian City Engineer.
3. Street signs are to be in place, water system shall be approved and activated, pressurized
irrigation system approved and activated, drainage lots constructed, fencing installed, and
road base approved by the Ada County Highway District prior to applying for building
permits. All development improvements, including fencing, micro-paths, irrigation, and
landscaping shall be 'installed and approved prior to obtaining certificates of occupancy.
A letter of credit or cash surety in the amount of 110% will be required for all fencing,
landscaping, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the
fmal plat.
4. Fencing adjacent to micropaths shall be installed per MCC 12-13-15-9
5. Staff strongly recommends fencing be installed in accordance with MCC 12-13-15-9
along pathways adjacent to Lots 9, 10, 11, & 13, Block 11 and Lots 19, 18, 17, 16, 15,
and 14, Block 12. (This is riot required per MCC, nor was it a condition of the
preliminary plat but would be recommended).
6. Per Preliminary Plat (PP-O1-024) condition #61, all drainage within the micropath (and
pathway amenity) lots shall be maintained within the 7 '/z foot area on either side of the 5-
foot hard surface path and not drained to the fence line. A minimum three (3) foot wide
separation between the hard surface path and adjacent building lots shall be maintained.
The Landscape Plan dated 06-02-03 by The Land Group, Inc. is approved as submitted.
8. Modify or add the following plat notes in the manner noted below:
(1.) Copy same language used for this not in the plat of Baldwin Park No. 4.
(2.) Copy same language used for this not in the plat of Baldwin Park No. 4.
(3.} Copy same language used for this not in the plat of Baldwin Park No. 4.
(4.) Delete
(7.) Copy same language used for this not in the plat of Baldwin Park No. 4.
(9.) :...Instnxmern No. 102083003
(11.) Revise the minimum square footage to read 1 301 s.f.
(13) Setbacks -Revise interior side setback for two stories from 7' to 10'
(I5.) The owner of each lot, across which passes an irrigation/drainage ditch or pipe is
responsible for the maintenance thereof, unless such responsibility is assumed by an
irrigation/drainage district.
9. Sanitary sewer service to this site shall be via the White Drain Trunk. Applicant will be
FP-03-037
Baldwin Park Sub No. 5 /~ p y ~ G ~~
I'MI ~ I
Mayor and Council
Transmittal Date: Tune 30, 2003
Page 3
responsible to construct the sewer mains to and through this proposed development.
Subdivision designer to coordinate main sizing and routing with the Public Works
Department.
10. Municipal water service to this site shall be via main line extensions from mains installed
in previous phases. Applicant will be responsible to construct the water mains to and
through this proposed development.
11. Complete the Certificate of Owners and accompanying Acknowledgment.
12. Applicant shall be required to pay Public Works development plan review, and
construction inspection fees, as determined during the plan review process, prior to
signature on the final plat per Resolution 02-374.
13. Any drainage areas (detention/retention basins) must be designed to ensure that water is
retained only during 100-year storm events, and for a period of time not to exceed 24
hours. Side slopes within drainage areas shall not exceed 3:1.
14. Prior to signature on the final plat for this phase, applicant must submit a complete
preliminary plat application to the City of Meridian Planning & Zoning Department.
15. Provide blow-up details on the final plat for the southeast wrner of Lot 1, Block 14, and
the southwest corner of Lot 14, Block 11.
16. Add dimensions for each half of the roadway right-of--ways along the subdivision
boundary.
17. Change the northeast corner monument of Lot 4, Block 14 to a 5/8"x30" rebaz with
plastic cap.
18. Graphically depict a 5-foot wide public utilities, drainage, and irrigation easement along
the east side of Lot 1, Block 14, as this will be a side lot line against a future phase.
19. Delete the "Fence Height Restriction Area" symbol from the plat and legend. Modify
Note number 14 to be more descriptive of the location of restriction.
20. The distance (242.19') shown on the face of the plat north of the RPOB doesn't match
the corresponding distance of the legal description of the Certificate of Owners.
21. The distance (225.97') shown on the face of the plat along the north side of Lots 5-7,
Block 14 doesn't match the corresponding distance of the legal description of the
Certificate of Owners.
22. The distance (70.12') shown on the face of the plat along the north boundary of Lot 4,
Block 14 doesn't match the corresponding distance of the legal description of the
Certificate of Owners.
FP-03-037
Baldwin Pads sub No. 3
G.7G~'P~7 `~ r ~ f~7
Mayor and Council
Transmittal Date: June 30, 2003
Page 4
23. Correct remove `Bear Creek, LLC., a limited liability company" from the Certificate of
Owners, and replace with "Capital Development, Inc., an Idaho Corporation."
24. Correct the situate statement of the legal description in the Certificate of Owners to read:
"...Range 1 West...,,
25. Staffs failure to cite specific ordinance provisions or terms of the approved preliminary
plat, conditional use pen33it or development agreement does not relieve Applicant of
responsibility for compliance.
GENERAI. REOUII2EMENT5
1. All irrigation ditches; laterals or canals, exclusive of natural waterways, intersecting,
aossing or lying adjacent and contiguous to the area being subdivided shall be tiled per
City Ordinance 12-4-13. Plans will need to be approved by the appropriate
imgation/drainage district, or lateral users association, with written confirmation of said
approval submitted to the Public Works Department.
2. Any existing domestic wells and/or septic systems within this project will have to be
removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells
may be used for non-domestic purposes such as landscape irrigation.
One-hundred watt (100w), high-pressure sodium streetlights will be required at locations
designated by the Public Works Department. All streetlights shall be installed at
subdivider's expense. Typical locations are at street intersections and/or fire hydrants.
Final design locations and quantity are determined after power designs are completed by
Idaho Power Company. Street light comrador shall obtain design and permit approval
from the Public Works Department prior to commencing installations.
4. Compaction test results must be submitted to the Meridian Building Department for all
building pads receiving engineered backfill, where footing would sit atop fill material.
5. Sewer and water mains shall be extended to and through the proposed development,
thereby making services available for adjacent properties.
6. Applicant's engineer will be required to submit a signed, stamped statement certifying
that all street finish centerline elevations are set a minimum of three feet above the
highest established normal groundwater elevation.
Coordinate fire hydram placement with the City of Meridian's Water Deputy Fire Chief
and the Public Works Department.
FP-03-037
Baldwin Park Sub Na3 r ~ 1 ! .~ N~1~ ~ ~~
Mayor and Council
Transmittal Date: June 30, 2003
Page 5
8. Provide five-foot-wide sidewalks in accordance with City Ordinance Section 12-5-2.K.
Sidewalks are to provide a clear five-faot-wide walkway pathway without encroachment
of mailbox structures.
RECOMNI);NDATION
Staff recommends approval of this project with the above stated comments and conditions.
FP•03-037
Baldwin Perk Sub No. S
~l~: b; ;~ "p" S a~S"