Loading...
HomeMy WebLinkAboutTudor Engineering Company 79Nov06/, ,/r LOU15 W. RIGGS ROBERT N, JANOPAUL STANLEY H. FROID DAMS C, TOOTHMAN PAUL E. POTTER KEITH D. BULL DOUGLAS J. MANSFIELD WILLIAM W. DAMS ORAL 1. CONYERS MICHAEL B, HARRINGTON THEODORE H.PURCELL TUDOR ENGINEERING COMPANY RALPH A, TUDOR (1902-1963) CONSULTING ENGINEERS AND PLANNERS 1802 NORTH 33RD STREET BOISE, IDAHO 83703 TELEPHONE (208) 342.5611 Mayor and City Council City of Meridian 728 Meridian Meridian, Idaho 83642 Attn: The Honorable Joseph Glaisyer Centl~~neyn CORPORATE OFFICE 149 NEW MONTGOMERY ST. SAN FRANCISCO, CALIFORNIA 94705 LESLIE L, ANKENMAN PAUL S, KUNZ RICHARD F. ORTON DAVID N. TORGESON November 6, 1979 401-7965 Pursuant to our discussion of November 5, 1979, I am providing this proposal for inspection services on the Cherry Lane golf course. A field inspection will be performed to assess the adequacy and operational characteristics of the water supply and irrigation system. All exposed above-ground appurtenances will be observed through at least one operational cycle. Our report will list prob- lem areas in two categories. These categories are design related problems and construction related problems. We will also comment on observable maintenance and operation deficiencies related to the irri- gation system. The report will include recommendations for remedial action, as necessary. No attempt will be made to either review or comment on the golf .course design or maintenance and operation func- tions except as listed above. Prior to the field inspection, the project plans and specifica- tions, presently on file at the City offices, will be reviewed. Design inadequacies will be based on information contained in these documents and any supporting correspondence provided to us from the City files. Adequacy of the system to perform intended functions will also be assessed. The observed installation will be reviewed for compliance with the plans and specifications. It-may be necessary to review appli- cable manufacturers' literature to determine the adequacy of certain equipment. We will rely on experience and professional judgment to assess normal and prudent construction practices. Based on discussions with parties involved with the golf course, I expect that the inspection will require two days in the field. Office time will be required to prepare the report. I will present the report and be available for comment at a meeting of the City Council. .. ~ ~ TUDOR ENGINEERING COMPANY Page 2 Mayor and City: Council November 6, 1979 The professional services performed will be billed to the City at our normal time and materials rates. I will begin the field inspection immediately following receipt of your written notice to proceed. The written report will be presented in accordance with your desired schedule. If you have any questions, please call me. V truly yours, ;T OR NGIN I CO AN r ichard F. Or o r., P. E. RFO:mr