HomeMy WebLinkAbout79Jun04 Rich StanwoodY
' r 1.." .
' - ~. t
Cherxy Lane` Golf Courrse - -
2040 ~nterlacheri W~.~ , "~ °'~` , ` ,
Meridians Idaho 8642 - L~'
Jixne 4 19.79
Eugene W. Wright, E.I.T.
J-U-B Engineers, Inca
,250 S. Beechwood Avenue
Boise, Idaho 83705
Dear Mr. Wright
Following the .meeting of June 4, 1979x. with the mayor
and city council of` Meridian, Dort, Leavitt of Nu .Pacific
Company, and your partner of J-U-B Engineers, it has become
apparent to me that this is the appropriate time to confirm
in writing a number of understandings and circumstances that
have. been discussed in this meeting and previously.
First, and most urgently, is the necessity that we
get screens for the water pumps. As you know, Baldoch in-
stalled those pumps too. deep below the water level in the
pumping pits, and, as you know, I had to constantly bail
water out of the pits. Therefore, it was necessary to raise
the pumps as you said you would do last autumn. However,
they were not raised until mid-April before the water came-
n. As you advised, when they were raised you would install
the screens.' In order to get water for irrigation we had
to commence watering immediatly even without the screens, and
you promised us adequate screens, would be installed on April
14, the day before the `water came in. We s+,ill do not have
adequate screens installed. Until June 2 there still were
no screens whatsoever; on that date there was a temporary-
orie-inch mesh screen installed which is completely inade-
quate to keep the trash out of the-pumps. We have had nq
.choice-but to operate these pumps since mid-April and live
in daily fear that they would burn up. We.'re.doing the best
we can in that'. Every four`hours'our employees are crawling
into the pump pit to clean it up by harid. The cleaning up
involves the removal of residue that could, enter the pumps.
We wll'install a temporary door. screen on the-orie-,inch
mesh as a stop gap measure until you install adequate screens.
We need immediate installation of these screens as you
agreed to two weeks ago when we all talked with Lloyd McKay
at the clubhouse.
r
.,,..,
i
~,
i ~ ~_ -~ ~ ~
..~. ..... ., ~;1
•
w - --------- - _,_ - _--- -
Next, there are a number of specific items we have
s:greed that should be taken care cf'right away:
1. A building to house the pumps and electY'cal
panel is needed.. This area is susceptible to
vandalism ,and needs your attention at once.
2. Electrical wiring is malfunctioning and needs
immediate attention so as to insure proper
watering of the-golf course..
3. Access to bridges needs to be completed. These
require rebuilding constantly due to wash out
from sprinklers.
4. All sprinkler heads which are. inadequate for
area need to be replaced, as damage to personal
property surrounding. golf course is a constant
problem.
Your attention to these problems at once wih.be greatly
appreciated.
,5-iYiae~.ely; ,.,
~, l ~%~
,~.~,.
Rich Stanwood, Pro -- --
_ _~ \\
~,~_ ,~ ,_
~~
~:~_ ~,3~
~.