April 15, 1980
Honorable Mayor & City Council
City of Meridian
728 Meridian Street
Meridian, Idaho 83642
Dear Mayor & Council:
Re: Cherry Lane Golf Course
Irrigation Water Storage
At your request I have reviewed the submittal made by the Engineers for
Leavitt-NuPacific outlining details for the .construction of a debris screening
structure near the irrigation pump station and for the construction of an off-
season irrigation water storage lagoon located in the southeast corner of the
existing golf course lake.
My comments concerning this submittal are as follows:
Debris Screenin Structure.
1. Locate the structure partially into the east bank of the lake or
construct a compacted earth fill out to and partially along its
north and south side to facilitate access for maintenance and for
removal of the screens for cleaning.
2. Revise the detail sketch to show Screen "A" having a 3/8 inch mesh,
Screen "B" having No. 4 mesh and Screen "C" having No. 16 mesh.
3. Verify that the weight of each screen will not be detrimental to its
removal for cleaning purposes.
In my opinion the intent of the screen structure is .satisfied by the
details shown on the submitted sketches.
Off-Season Irrigation Water La oon.
1. Obtain the clay-silt material to be used as the lagoon liner from
only the tested source_
Mayor & City Council
-2-
April 15, 1980
2- Install the cla
floor and dike walls and ecompa t it lto inch minimum
samples standard the specified e95h in the
roller. Proctor density usin ~ of the
The thickness of lifts used to obtain h e 12 inch th'
shall be determined b Y sheeps foot
installation- y inspection of a soils engineerin ickness
g during the
3- Conduct a minimum of six
the area of the lagoon floor compaction tests,
compacted lift, and dikes on -each nsix rmly taken over
met- to verify that the compaction requirementslhave been
It is recommended that a qualified soils engineer ob
installation of the compacted soil to warrant th
intended. a installation tas
The intent of the small off-season irrigation wat
opinion, be satisfied b
submitted and the recommendations listeduabove_ er lagoon can, in my
in accordance with the details
It is extremely critical that
source and that its installation and compaction used be onl
standard proctor density. .provide the required 95otof
Historically, several alternative methods have be
against leakage and these alternatives have been discu
Council members en used to seal lagoons
maintenance of It is possible in usin ssed with several of the
irrigation season ebecausen ofloor and or g this particular method that some
recreational vehicle the freeze th w cycleb andnecessar
y prior to an
should use during the winter months. P°ssible abuse from
. however, be minimal if
tested as detailed, the system is construct d yand the compaction
The work should be inspected as it is
compliance of construction to the bein
be submitted to the Cit aPProved sket peso and n pecifications tshoing
y of Meridian by the developer's Professional Engineer-uld
me.
If you have any questions or desire additional informs
tion, please contact
Sin rely
GDS:dm Gary mith, p_g-