HomeMy WebLinkAboutChange Order No. 1 with Terra West, Inc. for Plaza New City HallC~JIIrc..l v -cw - ca--~I ~ ~ ° ~' ~, ~ c~ ~~ CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 01 PROJECT NO. CH-06-001 DATE: 1 /20/09 EFFECTIVE DATE: CONTRACTOR: Terra West, Inc. PROJECT: MERIDIAN CITY HALL -Plaza The Contractor is hereby directed to make the following changes from the Contract Documents and Plans. Description: Incorporate revisions for Misc. ASI's, RFP's 8 RFI's ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Reason for Change Order: Additional scope or revisions per listed ASI's and RFI's Attachments: Change order items description, dated 1/26/09, with contractor quotes CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $338,000.00 Original Contract Times: Substantial Completion 10/31/08 Net changes form previous Change Orders Net changes form previous Change Orders None $0 00 No._ to _ (calendar days) . None Contract Price Prior to this Change Order: Contract Times prior to this Change Order: $338 000 00 (calendar days or date) , . 10/31!2008 Net Increase (decrease) of this Change Order: Net Increase (decrease) of this Change Order: (calendar days or date) $61,220.00 None Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: $399,220.00 (calendar days) Substantial Completion: 10/31/2008 RECOMMENDED: (CONSTRUCTION MANAGER) ACCEPTED: (CONTRALTO) Petra Inc. ~_`~ By: Thomas R Cou hli 1~' Terra West; Inc. L . g gy. ~ ~~eY ~ ~~` ~ Date: ~~ Date: APPROVED: (CITY PURCHASING AGENT) COUNCIL APPROV L By: Keith Watts Date: Date: APPROVED: (CITY) - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Jaycee Holman Date: Date: TITLE: ASI Pricing Phase IV Plaza DATE: 1/20/2009 PR07ECT: Meridian City Hall 70B: 060675 TO: Attn: Cody Echevarria CONTRACT NO: 39 Terra-West mailing : PO Box 904 phy:15977 Gunfire Rd, Caldwell 83607 Eagle, Idaho 83616-0904 Phone:208-459-4477 Fax: 208-459-6211 RE: T®: From: Number: DESCRIPTION OF CHANGE Tax Tax Net Item DesuiRtic~n Quantity Units Unit Price .Rate Amount Amount 00001 RFP #Ol -Phase 4 Revised Drawings - 2/22/08 completion of plaza re-design. 1.000 LS $22,847.00 0.00% $0.00 $22,847.00 Add curb, gutter and paving along east edge of plaza, S&G Trap at NW rnmer. . Deduct 23 LF of valley gutter. Terra West quote 4/30/08, revised = $16,408.00 Demo existing parking lot approach off Broadway and install new approach. Terra-West Work Order WO-08 dated 8/25/08 = $6,439.00 WO-15 void -scope included in T-W quote dated 4/30 = 0 00002 ASI #88 -Water Feature Revisions (COR #01) 00003 ASI #89R -South Parking Lot Revisions (COR #02). Revised parking lot layout, relocated catch basin. Dug up and move storm existing storm drain line and move to new catch basin location. Terra-West Work Order dated 7/16/08 = $860.00 Dig and baddill trench for conduit for add power receptacles in south parking lot. Terra-West Work Order dated 7/17/08. _ $725.00 City Request. 00004 ASI #111- F~cit Stairs & Walk (COR #03). Excavate and prep base for new stairs, 2 locations. Terra-West Work Order WO-06, dated 8/6/08. City Request - Building Department. 1.000 LS $0.00 0.00% $0.00 $0.00 1.000 LS $1,585.00 0.00% $0.00 $1,585.00 1.000 LS $2,328.00 0.00% $0.00 $2,328.00 Unit Cost: $61,220.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0.00 Total: $61,220.00 The Original Contract Sum was ................................................................................................. $338,000.00 Net Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order was ...................................................... $338,000.00 The Contract Sum Will be Increased ................................................................................... $61,220.00 The New Contract Sum Including This Change Order ...................................................... $399,220.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Terra-W Petra Ivtsorporated LCA A hitects, Cody Echevarria om Coughlin Steve Christensen Date: ~'~~(~ Date: Date: ~ ~.y~ Q~~ Expedition ®~ 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (ZOS) 323-4500 • FAX: (208) 323-4507 c CHANGE ORDEF ~~~ No. OOOOj 323-4500 BOISE, IDAHO RCE-1875 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 TITLE: ASI Pricing Phase N Plaza PROJECT: Meridian City Hall TO: Attn: Cody Echevarria Terra-West mailing : PO Box 904 phy:15977 Gunfire Rd, Caldwell 83607 Eagle, Idaho 83616-0904 Phone:208-459-4477 Fax: 208-459-6211 RE: To: From: DESCRIPTION OF CHANGE DATE: 1/20/2009 JOB: 060675 CONTRACT NO: 39 Item Description Quantity Units 00005 ASI #112 -Plaza Civil -ACRD Comments (COR #04). RE-prep sidewalk along 1.000 LS Meridian Road after irrigation line moved out of landscape area per ACRD request. Terra-West Work Order WO-13, dated 9/4/08 = $2,688.00 Ribbon curb & tree wells along Meridian Road frontage included in original scope. Void. Terra-West Work Order WO-07, dated 7/30/08 = 0.00 Cut back, demo, re-prep and HMAC pave addition area on Broadway per City request. Terra-West Work Order WO-14 dated 9/10/08 = $3,762.00 ACRD Requirements. 00006 Lower irrigation box at South Parking Lot (COR #05). Sawcut top of box off and 1.000 LS replace box cover. Terra-West quote dated 6/26/08. Construction Issue. 00007 ASI #118 -Plaza Light Fxture Locations (COR #07) Terra-West e-mail dated 1.000 LS 12/1/08 00008 ASI #124 -Motorcycle Parking COR#07) Revise standing curb to colt curb and 1.000 LS add concrete paving: subgrade prep. Terra-West 12/1/08. City Request. 0009 ASI #133 -Sidewalk Plates @ West Sidewalk (COR#08) Work Not Done 1.000 LS 0010 ASI #137 -Curb Elevations at Meridian & Broadway (COR#09) Terra-West 1.000 LS e-mail 12/1/08. Design Lssue. 0011 ASI #138 -Concrete Dimensions at Plaza Clock (COR#10) Move 3 water meter 1.000 LS setters at City request due to flagpole & plaza dock relocation. _ $3,706.00 Ribbon curb & tree wells along Broadway, included in original scope. Void Terra-West Work Order WO-16, dated 9/19/08 = $0.00 City Request. Number: Tax `Tax Net Unit Frice Rate Amount Annount $6,450.00 0.00% $0.00 $6,450.00 $1,250.00 0.00% $0.00 $1,250.00 $0.00 0.00% $0.00 $0.00 $166.00 0.00% $0.00 $166.00 $0.00 0.00% $0.00 $0.00 $0.00 0.00% $0.00 $0.00 $3,706.00 0.00% $0.00 $3,706.00 Unit Cost: $61,220.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0.00 Total: $51,220.00 The Original Contract Sum was ................................................................................................. $338,000.00 Net Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order was ...................................................... $338,000.00 The Contract Sum Will be Increased ................................................................................... $61,220.00 The New Contract Sum Including This Change Order ...................................................... $399,220.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Terra-West Petra Incorporated LCA A •chitects sy: By: By; Cod Echevarria Tom Coughlin -~" Steve Christensen ~- Date: ~,~ (/~ Date: Date: ~~2'1~6°l Expedition Page 2 of 4 i d'R'hTRR AT. G' R.S 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 TITLE: ASI Pricing Phase IV Plaza PROJECT: Meridian City Hall TO: Attn: Cody Echevarria Terra-West mailing : PO Box 904 phy:15977 Gunfire Rd, Caldwell 83607 Eagle, Idaho 83616-0904 Phone: 208-459-4477 Fax: 208-459-6211 RE: To: DESCRIPTION OF CHANGE DATE: 1/20/2009 JOB: 060675 CONTRACT NO: From: Number: Item De.~cription 0012 ASI #145 -South Parking Lot Markings - LEED (COR #13) Add "Low Emission Vehicle" and "Carpool" stall markings per LEED requirements. Terra-West quote 12/29/08. 0013 ASI #147 -Precast Parking Bumpers (COR #15). Furnish and install 16 precast parking bumpers for the south parking lot. Terra-West quote 12/1/08. City Request. 0014 RFI # 212 - ZamZows Drainage (COR #17) Install catch basin, connect to existing irrigation box and patdt pavement in ZamZows yard per RFI #212 City Request = $2,682.00 Clean ZamZows yard, grade & place road mix along retaining wall and area drain. Terra-West Work Orders dated 12/11/08 & 12/12/08 = $2,630.00 Complete unsuitable materials removal, grading ad cleanup of ZamZows yard. Terra West Work Orders 1/14, 1/415, & 1/16. Work per City agreement with ZamZows = $3,787.00 0015 Haul-in and place topsoil in planters, 116 CY. No topsoil stockpiles per contract documents, say by General Contractor. Terra-West Work Order dated 7/25/08. Construction issue. 0016 Ftgs at Entry Pools and Canal Feature. Dug footings for two entry pools and canal water feature and placed base. Backcharge MR Miller for this work. Terra-West Work Order WO-12, dated 9/4/08., Construction Issue. 39 Tax Tax- Net Quantity Units. Unit Price Raise Atnottttt Acttount 1.000 LS $971.00 0.00% $0.00 $971.00 1.000 LS $1,382.Q0 0.00% $0.00 $1,382.00 1.000 LS $9,099.00 0.00% $0.00 $9,099.00 1.000 LS $1,740.00 0.00% $0.00 $1,740.00 1.000 LS $2,400.00 0.00% $0.00 $2,400.00 Unit Cost: $61,220.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0.00 Total: $61,220.00 The Original Contract Sum was ................................................................................................. $338,000.00 Net Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order was ...................................................... $338,000.00 The Contract Sum Will be Increased ................................................................................... $61,220.00 The New Contract Sum Including This Change Order ...................................................... $399,220.00 The Contract Time Wili Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Terra-West Petra Incorporated LCA Ar hitects By: Cody Echevarria Date: Expedition By: Date: Tom Coughlin Steve Christensen Date: t (2'~ ~~ Page 3 of 4 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323507 TITLE: ASI Pricing Phase IV Plaza PROJECT: Meridian City Hall TO: Attn: Cody Echevarria Terra-West mailing : PO Box 904 phy:15977 Gunfire Rd, Caldwell 83607 Eagle, Idaho 83616-0904 Phone:208-459-4477 Fax: 208-459-6211 RE: To: DESCRIPTION OF CHANGE Item Description 0017 Leaned & bladed UPRR Right-of--Way, placed 4 loads of road-mbc, graded an rolled per City request. Terra-West Work Order WO-18, dated 10/10/08. 0018 8ackcharge for removing and resetting formwork due to incorrect elevations on subgrade prep . Axelsen DFA 9/17/08. Construction Issue. 0019 Install overflow drain from plaza water works holding tank to irrigation box with 12" dia. pipe, approx. 50LF. Terra-West quote 12/29/08, rev. 1/19/09. Construction Issue & Owner Request. 0020 Backcharge for rough grading on Ph 5 East Parking Lot islands done by Sunshine Landsppe. Per agreement to save bring machines back on site. Sunshine landscaping invoice #29017, dated 12/19/08. Consbuction Issue. 0021 Backcharge for concrete paving placed a 2nd time due to light pole base being knocked out of plumb by Terra-West. Axelsen Concrete DFA dated 10/1/08. From: Number: Tax Tax Mef Qaa~xkity Units Unit Price Rate Mwu~tt- Amount 1.000 LS $1,787.00 0.00% $0.00 $1,787.00 1.000 LS ($360.00) 0.00% $0.00 ($360.00) 1.000 LS $6,724.00 0.00% $0.00 $6,724.00 1.000 LS ($547.00) 0.00% $0.00 ($547.00) 1.000 LS ($308.00) 0.00% $0.00 ($308.00) Unit Cost: $61,220.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 0.0% GC markup: $0,00 Total: $61,220.00 The Original Contract Sum was ................................................................................................. $338,000.00 IVet Change by Previously Authorized Requests and Changes ................................................ $0.00 The Contract Sum Prior to This Change Order v--as ...................................................... $338,000.00 The Contract Sum Will be Increased ................................................................................... $61,220.00 The Nevlu Contract Sum Including This Change Order ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, $399,220.00 The Contract Time Will Not Be Changed ................................................................................. The Date of Substantial Completion as of this Change Order Therefore is .............................. ACCEPTED: Terra-West Petra Incorporated LCA rchitects, Date: Cody Echevarria Expedition Date: DATE: 1/20/2009 JOB: 060675 CONTRACT NO: 39 Tom Coughlin ~~ Steve Christensen Date: ~ I ~,-~ ~ ~fi~ Page 4 of 4 MERIDIAN CITY HALL PROJECT NO: CH-06-001 TERRA-WEST INC (39) -Phase IV Plaza CHANGE ORDER NO 1 CHANGE ORDER ITEMS 01 /26/09 1 RFP 01 Phase 4 Revised Drawings - 2/22/08 Completion of Plaza Design - Add curb, gutter & paving along east 16,408.00 edge of plaza, S&G Trap at NW comer Deduct 23 LF of valley gutter Terra West quote 4/30/08, revised - Demo existing parking lot approach off Broadway 6,439.00 and install new approach. Terra-West work order WO-08 dated 8/25/08 - WO-15 void, scope included in T-W quote dated 4/30 - $ 22,847.00 2 ASI 88 Water Feature Revisions (COR#01) $ _ 3 ASI 89R South Parking Lot Revisions (COR#02) - Revised parking lot layout, relocated catch basin 860.00 Dug up & move storm exisiting storm drain line & move to new catch basin location Terra-West work order dated 7/16/08 - Dig & backfill trench for conduit for add power 725.00 receptacles in south parking lot. Terra-West work order dated 7/17. City Request $ 1,585.00 4 ASI 111 Exit Stairs & Walk (COR#03) $ 2,328.00 Excavate & prep base for new stairs, 2 locations Terra-West work order WO-06, dated 8/6/08 City Request -Bldg/Fire Dept requirement 5 ASI 112 Plaza Civil -ACRD Comments (COR#04) - Re-prep sidewalk along Meridian Rd after irriigation line 2,688.00 moved out of landscape area per ACHD request. Terra-West work order WO-13, dated 9/4/08 - Ribbon curb & tree wells along Meridian Rd frontage - included in original scope. Void, Terra-West work order WO-07, dated 7/30/08 - Cut back, demo, reprep and HMAC pave addition area 3,762.00 on Broadway per City request. Terra-West work order WO-14, dated 9/10/08 ACHD Requirements $ 6,450.00 6 - - Lower Irrigation Box @ South Parking Lot (COR#05) $ 1,250.00 Sawcut top of box off and replace box cover Terra-West quote 6/26/08. Construction Issue 7 ASI 118 Plaza Light Fixture Locations (COR#06) $ _ Terra-West email 12/1 8 ASI 124 Motorcycle Parking (COR#07) $ 166.00 Revise standing curb to roll curb and add concrete paving; subgrade prep. Terra-West quote 12/1/08 City Request 9 ASI 133 Sidewalk Plates @ West Sidewalk (COR#08) VOID Work not done 10 ASI 137 Curb Elevations @ Meridian & Broadway (COR#09) $ _ Terra-West email 12/1/08. Design Issue 11 ASI 138 Concrete Dimensions @ Plaza Clock (COR#10) Page 1 of 2 a T CHANGE ORDER ITEMS - Move 3 water meter setters at city request due to 3,706.00 flagpole & plaza clock relocation. Terra-West work order WO-11, dated 8/28/08. City Request - Ribbon curb & tree wells along Broadway, included in _ original scope; Void Terra-West work order WO-16, dated 9/19/08 $ 3,706.00 12 ASI 145 South Parking Lot Markings -LEED (COR#13) $ 971.00 Add "Low Emission Vehicle" and "Carpool" stall markings per LEED requirements Terra-West quote 12/29/08 13 ASI 147 Precast Parking Bumpers(COR#15) $ 1,382.00 Furnish & install 16 precast parking bumpers for the south parking lot. Terra-West quote 12/1/08 City Request 14 RFI 212 Zamzows Drainage (COR#17) - Install catch basin, connect to existing irrigation box 2,682.00 and patch pavement in Zamzows yard per RFI-212 City Request - Cleanup Zamzows yard, grade & place road mix along 2,630.00 retaining wall and area drain. Terra-West work orders dated 12/11 & 12/12/08. - Complete unsuitable matt removal, grading and 3,787.00 cleanup of Zamzows yard. Terra-West work orders 1/14, 1/15 & 1/16 Work per City agreement with Zamzows. $ 9,099.00 15 Haul-in and place topsoil in planters, 116 CY. $ 1,740.00 No topsoil stockpiles per contract documents, say by general contractor Terra-West work order dated 7/25. Construction Issue 16 Ftgs @ Entry Pools & Canal Feature $ 2,400.00 Dug footings for two entry pools and canel water feature and placed base. Backcharge MR Miller for this work Terra-West work order WO-12, dated 9/4108. Constrution Issue 17 Cleaned & bladed UPRR Right-of--Way, placed 4 loads $ 1,787.00 of road-mix, graded and rolled per city request. Terra-West work order WO-18, dated 10/10/08 18 Backcharge for removing and resetting formwork due to $ (360.00) incorrect elevations on subgrade prep. Axelsen DFA 9/17/08. Construction Issue 19 Install overl1ow drain from plaza water works $ 6,724.00 holding tank to irrigation box with 12" dia pipe, approx 50 LF. Terra-West quote 12/29/08, rev 1/19/09. Construction Issue & Owner Request 20 Backcharge for rough grading on Ph 5 East Parking Lot $ (547.00) islands done by Sunshine Landscape. Per agreement to save bring machines back on site. Sunshine Landscaping invoice #29017, dated 12/19/08 Construction Issue 21 Backcharge for concrete paving placed a 2nd time due to light $ (308.00) pole base knocked out of plumb by Terra-West Axelsen Concrete DFA date 10/1/08. $ 61,220.00 Page 2 of 2