HomeMy WebLinkAboutSunshine Landscape for Phase 4 Plaza and Site Improvement New City HallCIT1P OF MERIDIAN 33 EAST IDAHO MERIDIAN, ID 83642 CONTRACT CHANGE ORDER CHANGE ORDER NO. 03 PROJECT NO. CH-06-001 DATE: 12/3/08 EFFECTIVE DATE: CONTRACTOR: Sunshine Landscape PROJECT: MERIDIAN CITY HALL -Phase 4 Plaza & Site Improvement The Contractor Is hereby directed to make the following changes from the Contract Documents and Plans. Description: Incorporate revisions per needed additional top soil for plaza. Backcharge for damage from skidsteer. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Reason for Change Order: Additional top soil for plaza. Attachments: Change order items description, dated 2123/09, with contractor quotes CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price $199,678.75 Original Contrail Times: Substantial Completion 8128/08 Net changes from previous Change Orders Net changes form previous Change Orders No._ to _ (calendar days) $33,275.00 None Contract Price Prior to this Change Order. ConUail Times prior to this Change Order. (glendar days or date) $232,953.75 s/zs/zoos Net Increase of this Change Order. Net Increase (decrease) of this Change Omer. (calendar days or date) $2,346.00 None Contract Price with all Approved Change Orders: Contract Times with all Approved Change Orders: (plendar days) $235,299.75 Substantial Completion 8/28/2008 RECOMMENDED: (CONSTRUCTION MAMA R) ACCEPTED: (CONTRACTOR) Petra Inc. ,~; ~ Sunshine Landscap By: Thomas R. Coughlin . By: Levi D c ett Date: ~ ~ ~ Date: )? t{ ~ 9 APPROVED: (crnr P RcHASING AGENT) COUNCIL APPROVAL By: Keith Watts Date: Date: APPROVED: (cIT~ - ATTEST: By: Mayor Tammy de Weerd By: City Clerk, Jaycee Holman Date: Date: CHANGE ORDER No. 00003 323-4500 BOISE, IDAHO RCE-1875 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 TITLE: Additional Topsoil/Sidewalk Repair PRO]ECT: Meridian City Hall TO: Attn: Levi Duckett Sunshine Landscape mail: PO Box 724 phys: 850 E. Franklin Dr. Meridian, ID 83680 Phone:208-8848036 Fax:208-898-9711 RE: CO To: SUNSLAND DESCRII~7°tON' OF CHANGE.. CONTRACT NO: 40 From: CITYMER **All taxes are included in costs** Item De~criptan 00001 Provide and install additional topsoil for the plaza area at the amphitheater backside per direction of CM. Sunshine Invoice #28963, dated 11-2408 and revised explanation dated Z-23-09. 00002 Backcharge for repair of sidewalk panel at the southeast comer of the building damages by landscapers skidsteer as witnessed by Pat Child. Axelsen DFA sheet dated 10-17-08. DATE: 2/24/2009 ]OB: 060675 Number: 00002 Tax Tax Net Qiuantilj/ Units. Unit.:Price :Rate 'Amount :Amount 1.000 LS $2,721.00 0.00% $0.00 $2,721.00 1.000 LS ($375.00) 0.00% $0.00 ($375.00) Unit Cost: $2,346.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 O.On/o GC markup: X0.00 Total: $2,346.00 The Original Contract Sum was ................................................................................................. Net Change by Previously Authorized Requests and Changes ................................................ $199,678.75 $33,275.00 The Contract Sum Prior to This Change Order was ...................................................... $232,953.75 The Contract Sum Will be Increased ................................................................................... The New Contract Sum Including This Change Order ...................................................... $2,346.00 $235,299.75 The Contract Time Will Not Be Changed ....................................................... .... .. .... ..... The Date of Substantial Completion as of this Change Order There ore is ~ .......................... ACCEPTED: Sunshine nds BY~ L ~ ' Duch Date: .~ ~~ Expedition Petra Incorporated sy: ®To~n C~ughlin ~ Date: ~ , ~ % ~' LCA Ar itects, P may: Steve Christensen Date: ~ . ?, . pCt MERIDIAN CITY HALL PROJECT NO: CH-06-001 SUNSHINE LANDSCAPING -Phase 4 (40) CHANGE ORDER NO 3 02/23/09 CHANGE ORDER ITEMS 1 Provide & install additional topsoil for the Plaza area 2,721.00 at the ampitheater backside per direction of CM. Sunshine invoice #28963, dated 11/24/08 &~revised explanation dated 2/23/09. 2 Backcharge for repair of a sidewalk panel at the (375.00) southeast comer of the building damges by landscapers skidsteer as witnessed by Pat Childs. Axelsen DFA sheet dated 10/17/08 2,346.00 Page 1 of 1